Jefferson Lab Hall C Logbook for October 11 - runstarts omitted
Main INDEX
Monday
237637 10/31/11 23:19 cdaq Run Track auto Start:
237636 10/31/11 23:19 cdaq End of Run Track auto End:
237635 10/31/11 23:17 cdaq Run Track auto Start:
237628 10/31/11 18:35 beaufait Target vacuum valve readout.
237627 10/31/11 17:39 lassiter Internet link lost to HMS PLC
237626 10/31/11 17:03 lassiter HMS Cryo valves configuration
237625 10/31/11 15:55 rob md preamps all okay in the DC limit
237618 10/31/11 10:02 brads Empty Argon replaced, gas system restored as of 9:30am
237617 10/31/11 09:54 jhlee update epics variables related with the injector
Sunday
237579 10/30/11 11:14 dalton Gas system interlock alarm
Saturday
237566 10/29/11 17:18 Pitt Hokie 4/5 - noise study - part 5
237565 10/29/11 17:14 dalton Screenshot of coda crash
237564 10/29/11 16:43 Pitt Hokie 4/5 - noise study - part 4
237563 10/29/11 16:01 Pitt Hokie 4/5 - noise study - part 3
237558 10/29/11 15:24 Pitt Hokie 4/5 - noise study - part 2
237553 10/29/11 14:44 Pitt Hokie 4/5 - noise study - part 1
237549 10/29/11 14:26 jhlee restore the CODA sessions on cdaql4/cdaql5
237544 10/29/11 13:47 Pitt Current lowest thresholds for Hokie 4 and 5
237542 10/29/11 00:07 jhlee We cannot restart the injector DAQ without interrupting the tracking Run
Friday
237541 10/28/11 22:14 jhlee debugging the CODA crash on cdaql5
237539 10/28/11 18:59 Pitt Region 2 HDC conditions for overnight run
237538 10/28/11 18:58 Pitt Region 2 thresholds for overnight
237537 10/28/11 18:44 Pitt Region 2 scintillator count rates
237536 10/28/11 18:16 Arshak Region 1. The LabView software has been updated.
237535 10/28/11 18:09 Pitt Hokie 1 - reconnect final four ribbon cables
237534 10/28/11 17:47 Pitt Hokie 1 - add two more ribbon cables
237533 10/28/11 17:43 rob scanner moved to super-downstream location
237532 10/28/11 17:41 Pitt Hokie 1 - add two more ribbon cables
237531 10/28/11 17:13 Pitt Hokie 1 - Four ribbon cables connected
237530 10/28/11 17:10 Pitt Hokie 1 - reconnect ground cable
237513 10/28/11 16:33 Pitt Hokie 1 - different Fast OR output
237505 10/28/11 16:14 Pitt Hokie 1 oscillations
237500 10/28/11 15:54 Pitt Region 2 Fast OR connections
237482 10/28/11 14:49 Pitt Hokie 2 oscillations during run 13189
237480 10/28/11 14:39 pking All of the "funny" runTypes are in the last rows of the table
237479 10/28/11 14:18 pking Found four more runtypes that are "funny"
237463 10/28/11 11:45 pking/jhlee Fixed the 'parity' runType in msql DB
237461 10/28/11 10:42 Pitt Lumi pedestals
237460 10/28/11 10:12 jhlee Start to check VQWK module and to prepare LUMI pedestal run
237459 10/28/11 10:11 jhlee Tracking DAQ was running fine
237455 10/28/11 09:38 jhlee CODA crashed due to ROC31 disconnected
Thursday
237399 10/27/11 21:20 jhlee CODA and AFECS Test
237398 10/27/11 20:39 pking/jhlee Cleaned up problems in the CODA msql database for qweak
237376 10/27/11 16:21 gaskell checked isolation of cavity monitors
237375 10/27/11 16:20 beaufait Qtor crash
237373 10/27/11 16:01 beaufait Qtor supply lcw leak alarm
237369 10/27/11 15:59 beaufait Large moeller quad
237365 10/27/11 14:19 leacock all dslumis electrically isolated from beampipe
237360 10/27/11 11:49 saw Qtor PLC reloading - interim instructions
Wednesday
237359 10/26/11 18:32 jhlee Yet another CODA test is done; CODA doesn't work
237358 10/26/11 18:01 Arshak Region 1 sliders and passive detector status.
237354 10/26/11 17:23 jhlee the master platform must be running on cdaql1
237353 10/26/11 15:33 jhlee DAQ usage for a CODA test remotely.
237352 10/26/11 14:48 buddhini List of VQWK modules with bad-channels that needs to be repaired.
237351 10/26/11 13:15 jhlee VQWK module test is done
Tuesday
237292 10/25/11 18:21 Pitt Region 2 status after drift chamber swap
237291 10/25/11 17:55 Armstrong VDCs off, plastic sheets can be removed
237289 10/25/11 16:49 Armstrong a couple of quick VDC plots
237288 10/25/11 15:56 Armstrong VDC test runs with 65/35 gas mixture
237284 10/25/11 14:25 dalton Analysis: last night coda crash screenshot
237283 10/25/11 12:00 donjones Compton: replaced battery in laser
237282 10/25/11 11:39 saw Target: iochc11 - Accidentally rebooted
237281 10/25/11 11:15 wdconinc Compton: Compton DAQ database access disabled
237280 10/25/11 10:37 jhlee reconfigure an old APC PDU for the region 1 slider
237279 10/25/11 10:26 pking Disabled some support scripts which access the DB servers
237278 10/25/11 09:38 pking Modified CODA scripts to NOT access the data_tracker DB for the next few days
Monday
237268 10/24/11 16:40 jhlee AFECS snapshot Oct 24 pm version is more robust than any others
237255 10/24/11 11:50 jhlee DAQ test is done, nothing is changed
237245 10/24/11 09:49 jhlee DAQ usage remotely now
237232 10/24/11 09:05 jhlee DAQ usage at the counting house
Sunday
Saturday
237159 10/22/11 02:19 jhlee DAQ test is done
237155 10/22/11 01:55 jhlee DAQ usage for test remotely
Friday
237114 10/21/11 15:46 manos Injector DAQ: looks good
237107 10/21/11 13:32 pking INJ DAQ should be ready for use
237106 10/21/11 13:29 pking Use "release components" before killing CODA when possible
237101 10/21/11 13:09 pking Removed dead screen sessions on cdaql5
237100 10/21/11 11:55 jhlee sometime one needs to clean screens..
237099 10/21/11 11:06 jhlee Information for today DAQ usage of the injector and tracking DAQs
237082 10/21/11 10:41 cdaq End of Run INJ auto End:
Thursday
237036 10/20/11 17:03 jhlee changed DAQ VQWK settings during VQWK tests.
237035 10/20/11 17:01 jhlee Only one DAQ is avaiable tonight
237004 10/20/11 12:04 pking Reverted EXPID changes on cdaql5
237003 10/20/11 11:31 pking We're trying to set cdaql5 with a different EXPID; INJ DAQ is down
Wednesday
236996 10/19/11 20:15 jhlee we cannot run the parity and injector DAQ at the same time with the same EXPID
236960 10/19/11 11:54 jhlee When we want to run the tracking and injector DAQs at the same time
236826 10/19/11 02:30 pking INJ DAQ is run semi-standalone tonight
236818 10/19/11 02:16 pking Crashed the tracking run due to problems getting INJ running
Tuesday
236808 10/18/11 17:20 jhlee a summary of a not-so-short DAQ test
236748 10/18/11 10:11 Pitt Center in X of Halo Hole Target
236732 10/18/11 09:36 jhlee DAQ usage in the HallC counting house
236726 10/18/11 07:39 Pitt HDC conditions for run 13057
Monday
236666 10/17/11 17:23 narayan Compton: ROC2 crashed
236652 10/17/11 14:16 gaskell/meek Moller: target ladder re-installed
236647 10/17/11 10:46 Pitt Late entry: Hokie 5 Fast Or disabled
Sunday
236646 10/16/11 18:20 Pitt HDC conditions during run 13056
236644 10/16/11 18:17 Pitt Changing Hokie HVs at the end of run 13055
Saturday
236600 10/15/11 22:11 narayan Compton: real thr voltage: 4.2
236528 10/15/11 15:10 jhlee clean up start/end scripts
236527 10/15/11 14:50 Pitt Conditions for run 13055
236525 10/15/11 14:15 pking Reset the main DAQ for R2 cosmic running. Didn't start a run though.
236524 10/15/11 14:13 pking Finished VQWK tests for today.
236520 10/15/11 12:18 Pitt Turned off Region 2 voltages
236512 10/15/11 10:53 pking Stopped R2 cosmic run, starting DAQ tests for VQWKs
236510 10/15/11 09:46 Pitt DAQ use today; Saturday 10/15/2011
Friday
236501 10/14/11 18:27 Pitt HDC conditions for overnight run
236497 10/14/11 17:22 rob done using parity DAQ from CH second floor
236492 10/14/11 15:31 rob using parity DAQ from counting house second floor
236491 10/14/11 14:58 pking Changed the default QwAnalysis version to be QwAnalysis/new on the cdaq accounts
236490 10/14/11 11:58 leacock/duva dslumi5 radiation damage
Thursday
236431 10/13/11 17:12 pking Moved some ROOT files from ~/qweak/QwScratch/rootfiles to /net/cdaq/cdaql5data/qweak/rootfiles
236430 10/13/11 17:08 brads MVME single board computers 2306, 2401 x2 near printer were put in cabinet
236421 10/13/11 10:18 saw New Sun Workstation - cdaqs1
236307 10/13/11 00:21 cdaq End of Run :
Wednesday
236288 10/12/11 20:01 pking Done with DAQ tests for tonight
236287 10/12/11 20:00 pking INJ DAQ is available for INJ studies now
236282 10/12/11 19:46 pking Didn't finish the changes to coda scripts; we'll use the same versions we used this morning
236262 10/12/11 18:03 rob md ADCs are all sick
236261 10/12/11 17:36 rob battery signals from normal and modified preamps
236241 10/12/11 15:57 rob md-, md+ adcs re-seated
236228 10/12/11 14:35 rob problem stays with md+ adcs
236222 10/12/11 14:17 rob md adcs still screwed up
236218 10/12/11 14:07 rob power-cycled ROC2, nim crate
236200 10/12/11 11:35 pking DAQ on both cdaql4 and cdaql5 reserved for DAQ tests
236070 10/12/11 00:05 pking INJ DAQ is available for INJ studies now
Tuesday
236068 10/11/11 23:59 pking Instructions for using INJ DAQ tonight
236024 10/11/11 15:58 kenyon Scattering chamber leak
236015 10/11/11 09:16 Pitt Region 2 HDC conditions after overnight run
236014 10/11/11 09:04 Pitt Done with DAQ
Monday
236012 10/10/11 18:46 Pitt Conditions for Run 13019 - HDC Cosmic overnight run - 65% Ar - 35% ethane
236008 10/10/11 18:32 Pitt HDC conditions for overnight run
236001 10/10/11 17:40 jhlee This short test is done.
235990 10/10/11 17:24 jhlee DAQ usage for a short test
235989 10/10/11 17:08 pking The DAQs on cdaql4 and cdaql5 interfere with each other right now
235984 10/10/11 14:36 pking This log entry was actually for injector run 500001
235983 10/10/11 14:35 pking Reconfigured the INJ DAQ to run on cdaql5
235979 10/10/11 09:34 jhlee DAQ usages for test remotely
Sunday
Saturday
Friday
235593 10/07/11 17:57 brads Chamber gas mix changed to 65% argon, 35% ethane
235587 10/07/11 17:26 Pitt Status of Hokie 1
235557 10/07/11 15:59 dalton Using DAQ in source
235555 10/07/11 15:11 Pitt Strip chart records during Run 12807
235551 10/07/11 14:51 Pitt Striptool record for run 12806
235545 10/07/11 14:38 Pitt Fast OR Strip Chart record for run 12805
235531 10/07/11 13:26 jhlee DAQ tests are done
235519 10/07/11 11:46 Pitt HDC leakage currents and count rates for nominal conditions
235517 10/07/11 11:29 jhlee DAQ usage for a CODA automode test with 30 mins and the autohclog remotely
235511 10/07/11 10:21 jhlee DAQ usage for test
235510 10/07/11 02:42 jhlee Tests for an automode DAQ are done with the automatic hclog scripts
235508 10/07/11 02:26 jhlee a more robust way to collect many EPICS variables at the start and the end of a run
235470 10/07/11 00:41 jhlee DAQ usage for a CODA automode test with 5 min and the autohclog
Thursday
235401 10/06/11 11:23 jhlee an auto HCLog test for DAQ
235392 10/06/11 10:23 jhlee DAQ test is done, now DAQ will be used by the injector study remotely
235382 10/06/11 09:46 manos DAQ usage
235380 10/06/11 09:15 jhlee DAQ will be down for a while
Wednesday
235356 10/05/11 17:48 jhlee several tests for the automatic hclog for the end of a run
235354 10/05/11 17:36 smithg Target: a couple more comments on the cooldown test
235342 10/05/11 17:14 smithg Target: test cooldown completed successfully
235259 10/05/11 11:54 jhlee DAQ is in use for the injector study remotely.
235255 10/05/11 11:14 rob daq is in use from somewhere else
235253 10/05/11 10:53 covrig, smit Target: Plot of pump scan with tach readings
235245 10/05/11 09:46 covrig, smit Target: screen-shots from target test cooldown
235239 10/05/11 09:22 narayan Helicity Board: setting it to 960Hz
235236 10/05/11 00:37 Adesh Target: He cooldown test status: Owl shift
Tuesday
235234 10/04/11 18:09 smithg Target: Can't get to A-can pump
235233 10/04/11 16:47 jhlee an automatic hclog for the beginning run
235231 10/04/11 16:34 jhlee This is a dummy enry, not a real run.
235222 10/04/11 15:57 smithg/adesh Target: He cooldown test status
235203 10/04/11 14:51 Pitt Gas flowing for Hokie 1
235190 10/04/11 13:23 jhlee helicity setting is incorrect
235189 10/04/11 13:09 rob md ADCs not getting correct number of samples
235186 10/04/11 12:11 rob installed wideband preamp; md7 signals from batteries
235185 10/04/11 11:22 Pitt Turned lumi upstream HV off
235184 10/04/11 11:14 Pitt Pedestal - run 12658 - lumis
235183 10/04/11 10:48 Pitt Pedestals - run 12658 - main detectors
235179 10/04/11 10:20 Pitt Turned on preamp power for MDs
235177 10/04/11 10:02 Pitt Changed helicity board settings to normal parity mode
235176 10/04/11 09:55 Pitt Using DAQ in Hall C counting house
235175 10/04/11 08:50 smithg Started cooldown test again
Monday
235174 10/03/11 18:40 jhlee DAQ test is done
235171 10/03/11 17:36 smithg backed out of cooldown test
235166 10/03/11 16:55 jhlee DAQ usage for test
235165 10/03/11 11:12 smithg Target: cooldown status: OK so far
235164 10/03/11 10:06 smithg ethane and hydrogen alarms
235163 10/03/11 10:02 smithg star trek doors don't move
235162 10/03/11 09:34 smithg Starting target cooldown test
Sunday
235161 10/02/11 01:48 jhlee DAQ test is done
Saturday
235152 10/01/11 21:21 jhlee DAQ usage for the injector and the parity DAQ test
235151 10/01/11 11:08 jhlee DAQ test is done