Jefferson Lab HALL C Logbook for March 98 - full listing
Main INDEX
Tuesday
5201 03/31/98 23:49 cdaq Beam Time Accounting
5200 03/31/98 22:54 koltenuk HMS scin S2X S2Y HV die again
5199 03/31/98 16:35 cdaq Run 18924: HMS DAQ CHECKOUT at 1-pass, magnets are ramping
5198 03/31/98 16:20 cdaq Run 18923: HMS DAQ CHECKOUT at 1-pass, magnets are ramping
5197 03/31/98 16:12 cdaq Beam Time Accounting
5196 03/31/98 12:25 mack gas inventory
5195 03/31/98 12:23 mack trouble-shooting hms crate 1 (S2) problem
5194 03/31/98 12:12 gaskell HMS scin stuff
5193 03/31/98 12:00 cdaq Run 18922: HMS CHECKOUT TRIGGER=1/4
5192 03/31/98 11:23 gaskell fixed SOS SY6+
5191 03/31/98 10:01 cdaq Run 18921: SOS CHECKOUT TRIGGER=2/4
5190 03/31/98 09:55 cdaq Run 18920: SOS CHECKOUT TRIGGER=1/4
5189 03/31/98 09:53 cdaq Run 18919: SOS CHECKOUT TRIGGER=1/4
5188 03/31/98 08:44 Lung Magnets, HV off
5187 03/31/98 07:06 cdaq Target Shift Checklist
5186 03/31/98 07:00 zihlmann owl shift(again)
5185 03/31/98 07:00 cdaq Beam Time Accounting
5184 03/31/98 06:31 cdaq Run 18918: 3He(e,e') luminosity scan 20A
5183 03/31/98 06:17 cdaq Run 18917: 3He(e,e') luminosity scan 40uA
5182 03/31/98 06:07 cdaq Run 18916: 3He(e,e') luminosity scan 49uA
5181 03/31/98 06:02 cdaq Run 18915: 3He(e,e') luminosity scan 49uA
5180 03/31/98 05:25 cdaq Run 18914: 3He(e,e') luminosity scan 49uA
5179 03/31/98 04:56 cdaq Run 18913: 3He(e,e') luminosity scan
5178 03/31/98 04:07 cdaq Run 18912: 3He(e,e') luminosity scan
5177 03/31/98 04:03 cdaq Run 18911: 3He(e,e') PI+ w=1.6 ebeam=3.245
5176 03/31/98 03:38 cdaq Run 18910: BCM calibration
5175 03/31/98 03:20 cdaq Run 18909: 3He(e,e') PI+ w=1.6 ebeam=3.245
5174 03/31/98 02:39 cdaq Run 18908: 3He(e,e') PI+ w=1.6 ebeam=3.245
5173 03/31/98 02:28 cdaq Run 18907: 3He(e,e') PI+ w=1.6 ebeam=3.245
5172 03/31/98 02:18 cdaq Run 18906: 3He(e,e') PI+ w=1.6 ebeam=3.245
5171 03/31/98 01:58 Averys changed He bottle
5170 03/31/98 01:43 danagoulian BPM screen
5169 03/31/98 01:37 cdaq Run 18905: 3He(e,e') PI+ w=1.6 ebeam=3.245
5168 03/31/98 01:18 cdaq Run 18904: 3He(e,e') PI+ w=1.6 ebeam=3.245
5167 03/31/98 00:54 cdaq Run 18903: 3He(e,e') PI+ w=1.6 ebeam=3.245
5166 03/31/98 00:31 cdaq Run 18902: 3He(e,e') PI+ w=1.6 ebeam=3.245
5165 03/31/98 00:29 cdaq Run 18901: 3He(e,e') PI+ w=1.6 ebeam=3.245
5164 03/31/98 00:26 cdaq Run 18900: 3He(e,e') PI+ w=1.6 ebeam=3.245
5163 03/31/98 00:23 danagoulian s2y6+ HV problem
5162 03/31/98 00:16 cdaq Run 18899: 3He(e,e') PI+ w=1.6 ebeam=3.245
5161 03/31/98 00:03 cdaq Beam Time Accounting
5160 03/31/98 00:00 Bryon Shift summary
Monday
5159 03/30/98 23:59 Cdaq Beam energy measurement
5158 03/30/98 23:37 Cdaq finished PI- 3.245 W=1.6 point
5157 03/30/98 22:39 cdaq Run 18898: dummy PI- w=1.6 ebeam=3.245
5156 03/30/98 22:09 cdaq Run 18897: 3He(e,e') PI- w=1.6 ebeam=3.245
5155 03/30/98 21:44 cdaq Run 18896: 3He(e,e') PI- w=1.6 ebeam=3.245
5154 03/30/98 21:07 cdaq Run 18895: 3He(e,e') PI- w=1.6 ebeam=3.245
5153 03/30/98 20:21 cdaq Run 18894: 3He(e,e') PI-
5152 03/30/98 20:13 Cdaq shift check list
5151 03/30/98 19:58 cdaq Run 18893: 3He(e,e') PI-
5150 03/30/98 19:53 koltenuk Run 18890 is not JUNK
5149 03/30/98 19:49 koltenuk DAQ problem, Run 18892 could be junk
5148 03/30/98 19:23 cdaq Run 18892: 3He(e,e') PI-
5147 03/30/98 19:12 gaskell bpms
5146 03/30/98 18:58 cdaq Run 18891: 3He(e,e') PI-
5145 03/30/98 18:55 cdaq Run 18890: Junk TEST RUN. beam on.
5144 03/30/98 18:51 cdaq Run 18889: Junk TEST RUN. beam on.
5143 03/30/98 18:29 cdaq Run 18888: TEST RUN BEAM NOT READY.
5142 03/30/98 17:10 Bryon Changed Ethane flow valve.
5141 03/30/98 16:54 cdaq Run 18887: DAQ test run - junk
5140 03/30/98 16:30 cdaq Run 18886: DAQ test run - junk
5139 03/30/98 16:06 cdaq Target Shift Checklist
5138 03/30/98 16:03 cdaq Beam Time Accounting
5137 03/30/98 16:01 Lung HMS/SOS ready for 4-pass beam
5136 03/30/98 14:37 Lung Request energy change
5135 03/30/98 14:11 cdaq Run 18885: 3He(e,e') elastic calibration run
5134 03/30/98 13:49 cdaq Run 18884: 3He(e,e') elastic calibration run
5133 03/30/98 13:45 cdaq Run 18883: 3He(e,e') elastic calibration run
5132 03/30/98 13:38 cdaq Run 18882: 3He(e,e') elastic calibration run
5131 03/30/98 13:19 Lung Correction to header for #18879
5130 03/30/98 13:17 cdaq Run 18881: 3He(e,e') elastic calibration run
5129 03/30/98 13:13 cdaq Run 18880: 3He(e,e') elastic calibration run
5128 03/30/98 13:09 cdaq Run 18879: 3He(e,e') elastic calibration run
5127 03/30/98 12:33 cdaq Run 18878: W=1.16 GeV ebeam=1.645 3he Pi-plus
5126 03/30/98 11:45 H. Anklin BCM1/2 ratio
5125 03/30/98 11:40 Lung Beam position
5124 03/30/98 11:35 Lung HMS Hodo trip again
5123 03/30/98 11:31 cdaq Run 18877: W=1.16 GeV ebeam=1.645 3he Pi-plus
5122 03/30/98 11:24 Lung HMS/SOS Trigger Status
5121 03/30/98 10:59 cdaq Run 18876: W=1.16 GeV ebeam=1.645 3he Pi-plus
5120 03/30/98 10:39 gaskell BPM screen
5119 03/30/98 10:30 cdaq Run 18875: W=1.16 GeV ebeam=1.645 3he Pi-plus
5118 03/30/98 09:56 Wood Beam Time accounting
5117 03/30/98 09:34 cdaq Run 18874: W=1.16 GeV ebeam=1.645 3he Pi-plus
5116 03/30/98 09:31 gaskell Runs 18871-3 are junk
5115 03/30/98 09:10 cdaq Run 18873: W=1.16 GeV ebeam=1.645 3he Pi-plus
5114 03/30/98 09:03 cdaq Run 18872: W=1.16 GeV ebeam=1.645 3he Pi-plus
5113 03/30/98 09:01 Lung HMS HV Trip
5112 03/30/98 08:59 cdaq Run 18871: W=1.16 GeV ebeam=1.645 3he Pi-plus
5111 03/30/98 08:44 gaskell W=1.16 GeV sarting w/run 18856
5110 03/30/98 08:43 cdaq Run 18870: W=1.16 GeV ebeam=1.645 3he Pi-plus
5109 03/30/98 07:56 cdaq Beam Time Accounting
5108 03/30/98 07:54 zihlmann owl(eulen) shift
5107 03/30/98 07:40 cdaq Run 18869: W=1.6 GeV ebeam=1.645 3he Pi-plus
5106 03/30/98 06:43 cdaq Run 18868: W=1.6 GeV ebeam=1.645 3he Pi-plus
5105 03/30/98 05:43 cdaq BPM medm screen
5104 03/30/98 05:36 cdaq Run 18867: W=1.6 GeV ebeam=1.645 3he Pi-plus
5103 03/30/98 04:34 cdaq Run 18866: W=1.6 GeV ebeam=1.645 3he Pi-plus
5102 03/30/98 03:38 cdaq Run 18865: W=1.6 GeV ebeam=1.645 3he Pi-plus
5101 03/30/98 03:34 zihlmann data disk3 full changed to disk4
5100 03/30/98 03:21 cdaq Run 18864: W=1.6 GeV ebeam=1.645 3he Pi-plus
5099 03/30/98 03:09 cdaq BPM status
5098 03/30/98 02:20 cdaq Run 18863: W=1.6 GeV ebeam=1.645 3he Pi-plus
5097 03/30/98 01:54 cdaq Run 18862: W=1.6 GeV ebeam=1.645 3he Pi-plus
5096 03/30/98 01:14 cdaq Beam Time Accounting
5095 03/30/98 00:53 cdaq Run 18861: W=1.6 GeV ebeam=1.645 3he Pi-plus
5094 03/30/98 00:49 cdaq Run 18860: W=1.6 GeV ebeam=1.645 3he Pi-plus
5093 03/30/98 00:48 cdaq Run 18859: W=1.6 GeV ebeam=1.645 3he Pi-plus
5092 03/30/98 00:44 cdaq Run 18858: W=1.6 GeV ebeam=1.645 3he Pi-plus
5091 03/30/98 00:40 cdaq Run 18857: W=1.6 GeV ebeam=1.645 3he Pi-plus
5090 03/30/98 00:35 cdaq Run 18856: W=1.6 GeV ebeam=1.645 3he Pi-plus
5089 03/30/98 00:08 cdaq Run 18855: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5088 03/30/98 00:00 ent runs with lower tracking eff
Sunday
5087 03/29/98 23:51 cdaq Target Shift Checklist
5086 03/29/98 23:42 ent shift summary
5085 03/29/98 23:35 cdaq Run 18854: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5084 03/29/98 22:59 cdaq Run 18853: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5083 03/29/98 22:45 cdaq Run 18852: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5082 03/29/98 22:17 cdaq Run 18851: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5081 03/29/98 22:04 danagoulian BPM medm screen
5080 03/29/98 21:51 averys run 18848,18849
5079 03/29/98 21:43 cdaq Run 18850: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5078 03/29/98 21:30 cdaq Run 18849: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5077 03/29/98 21:00 cdaq Run 18848: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5075 03/29/98 20:59 ent runs 18844,18845
5076 03/29/98 20:59 ent gas flow problems
5074 03/29/98 20:48 cdaq Run 18847: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5073 03/29/98 20:46 cdaq Run 18846: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5072 03/29/98 20:00 cdaq Run 18845: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5071 03/29/98 19:14 cdaq Run 18844: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5070 03/29/98 19:12 cdaq Run 18843: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5069 03/29/98 18:13 ent SOS BM02 problem
5068 03/29/98 16:03 cdaq Beam Time Accounting
5067 03/29/98 15:55 gaskell HMS Dipole Craashed
5066 03/29/98 15:28 cdaq Run 18842: W=1.6 GeV ebeam=1.1645 3he Pi-plus
5065 03/29/98 14:59 cdaq Run 18841: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
5064 03/29/98 14:54 gaskell Beam Energy=1.644 GeV
5063 03/29/98 13:51 cdaq Run 18840: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
5062 03/29/98 13:06 cdaq Run 18839: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
5061 03/29/98 12:48 cdaq Run 18838: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
5060 03/29/98 12:37 cdaq Run 18837: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
5059 03/29/98 12:26 gaskell Beam energy measurement problems
5058 03/29/98 10:29 cdaq Run 18836: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5056 03/29/98 09:50 cdaq Run 18835: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5057 03/29/98 09:50 gaskell HMS S2X and S2Y turned themselves off.
5055 03/29/98 09:02 cdaq Run 18834: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5054 03/29/98 08:07 cdaq Beam Time Accounting
5053 03/29/98 07:59 cdaq Run 18833: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5052 03/29/98 07:22 cdaq beam profile in arc
5051 03/29/98 06:48 cdaq Run 18832: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5050 03/29/98 05:45 cdaq Run 18831: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5049 03/29/98 04:57 cdaq bpm screen
5048 03/29/98 04:44 zihlmann changed from data disk2 to data disk3
5047 03/29/98 04:44 cdaq Run 18830: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5046 03/29/98 04:13 cdaq Run 18829: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5045 03/29/98 03:09 cdaq Run 18828: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5044 03/29/98 02:10 cdaq Run 18827: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5043 03/29/98 01:04 cdaq Run 18826: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5042 03/29/98 00:49 cdaq Run 18825: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
Saturday
5041 03/28/98 23:59 cdaq Beam Time Accounting
5040 03/28/98 23:42 cdaq Run 18824: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5039 03/28/98 22:35 cdaq Run 18823: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5038 03/28/98 22:19 dmckee Shift checklists 3/26 - 3/28
5037 03/28/98 22:09 cdaq BPM screen
5036 03/28/98 21:32 cdaq Run 18822: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5035 03/28/98 20:27 cdaq Run 18821: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5034 03/28/98 19:30 cdaq Run 18820: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
5033 03/28/98 18:32 cdaq Run 18819: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=50,ps2=10000,ps3=1,ps4=1
5032 03/28/98 16:41 cdaq Run 18818: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps1=50,ps2=10000,ps3=1,ps4=1
5031 03/28/98 16:16 cdaq Beam Time Accounting
5030 03/28/98 16:08 cdaq Run 18817: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps1=30,ps2=6000,ps3=1,ps4=1
5029 03/28/98 16:03 cdaq Run 18816: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps2=6000,ps3=1,ps4=1
5028 03/28/98 14:32 cdaq Run 18815: Production on 3he
5027 03/28/98 14:31 H. Anklin BCM1/BCM2 ratio for all runs
5026 03/28/98 13:46 H. Anklin BCM plots continued
5025 03/28/98 13:46 H. Anklin BCM calibration plots continued
5024 03/28/98 13:45 H. Anklin BCM calibration analysis run: 18797
5023 03/28/98 13:43 gaskell HMS quad hall probe gui dead
5022 03/28/98 13:31 cdaq Run 18814: Production on 3he
5021 03/28/98 12:26 cdaq Run 18813: Production on 3he
5020 03/28/98 11:29 cdaq Run 18812: Production on 3he
5019 03/28/98 10:31 cdaq Run 18811: Production on 3he
5018 03/28/98 09:40 cdaq Run 18810: Production on 3he
5017 03/28/98 09:38 cdaq Run 18809: Production on 3he
5016 03/28/98 08:43 cdaq Run 18808: Production on 3he
5015 03/28/98 08:29 Mharvey HMS Q3 crash
5014 03/28/98 08:21 cdaq Target Shift Checklist
5013 03/28/98 08:08 cdaq Run 18807: Production on 3he
5012 03/28/98 08:05 cdaq Beam Time Accounting
5011 03/28/98 08:04 mharvey bpm screen
5010 03/28/98 07:13 cdaq Run 18806: Production on 3he
5009 03/28/98 06:17 cdaq Run 18805: Production on 3he
5008 03/28/98 05:11 cdaq Run 18804: Production on 3he
5007 03/28/98 04:33 cdaq Run 18803: Production on 3he
5006 03/28/98 04:02 cdaq Run 18802: Production on 3he
5005 03/28/98 03:27 cdaq Run 18801: Production on 3he
5004 03/28/98 02:52 cdaq Run 18800: Production on 3he
5003 03/28/98 02:19 cdaq Run 18799: Production on 3he
5002 03/28/98 01:43 cdaq Run 18798: Production on 3he
5001 03/28/98 01:38 gueye BCM calibration summary
5000 03/28/98 01:09 cdaq Run 18797: BCM CALIBRATION
4999 03/28/98 00:56 gueye BCM calibration - runs 18795-18796
4998 03/28/98 00:55 cdaq Run 18796: BCM CALIBRATION
4997 03/28/98 00:38 gueye BCM calibration
4996 03/28/98 00:36 cdaq Run 18795: BCM CALIBRATION
Friday
4995 03/27/98 23:58 cdaq Beam Time Accounting
4994 03/27/98 23:55 cdaq Run 18794: 3he elastic at 40 muA, 18.01 deg
4993 03/27/98 23:51 cdaq Target Shift Checklist
4992 03/27/98 23:39 cdaq Run 18793: 3he elastic at 20 muA, 18.01 deg
4991 03/27/98 23:25 cdaq Run 18792: 3he elastic at 20 muA
4990 03/27/98 23:16 cdaq Run 18791: 3he elastic at 20 muA
4989 03/27/98 23:01 dmckee Preliminary 3He Luminosity scan results
4988 03/27/98 22:23 cdaq Run 18790: luminosity GeV ebeam=1.1645 3 He
4987 03/27/98 22:06 cdaq Run 18789: luminosity GeV ebeam=1.1645 3 He
4986 03/27/98 21:54 cdaq Run 18788: luminosity GeV ebeam=1.1645 3 He
4985 03/27/98 21:49 bpms bpms
4984 03/27/98 21:35 cdaq Run 18787: luminosity GeV ebeam=1.1645 3 He
4983 03/27/98 21:20 ent BPM screen
4982 03/27/98 21:19 cdaq Run 18786: luminosity GeV ebeam=1.1645 3 He
4981 03/27/98 20:58 cdaq Run 18785: luminosity GeV ebeam=1.1645 3 He
4980 03/27/98 20:56 cdaq Run 18784: luminosity GeV ebeam=1.1645 3 He
4979 03/27/98 20:30 cdaq Run 18783: luminosity GeV ebeam=1.1645 3 He
4978 03/27/98 20:25 cdaq Run 18782: luminosity GeV ebeam=1.1645 3 He
4977 03/27/98 20:07 cdaq Run 18781: luminosity GeV ebeam=1.1645 3 He
4976 03/27/98 20:04 cdaq Run 18780: luminosity GeV ebeam=1.1645 3 He
4975 03/27/98 19:58 cdaq Run 18779: luminosity GeV ebeam=1.1645 3 He
4974 03/27/98 19:43 Reinhold for Harp Scan
4973 03/27/98 19:42 cdaq Run 18778: luminosity GeV ebeam=1.1645 3 He
4972 03/27/98 19:28 cdaq Run 18777: luminosity GeV ebeam=1.1645 carbon z=0
4971 03/27/98 17:34 cdaq Run 18776: cosmic test
4970 03/27/98 17:25 cdaq Run 18775: cosmic test
4969 03/27/98 15:34 H. Anklin BCM1/BCM2 for all runs so far
4968 03/27/98 14:46 Cdaq BCM plot cont.
4967 03/27/98 14:45 Cdaq BCM plots cont.
4966 03/27/98 14:44 H. Anklin BCM calibration analysis run 18759
4965 03/27/98 10:23 gaskell replaced helium bottle
4964 03/27/98 08:09 cdaq Beam Time Accounting
4963 03/27/98 03:48 cdaq Run 18773: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4962 03/27/98 03:16 cdaq Run 18772: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4961 03/27/98 03:06 dmckee HMS dipole tripped
4960 03/27/98 02:35 cdaq Run 18771: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4959 03/27/98 02:08 cdaq Run 18770: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4958 03/27/98 01:49 cdaq Run 18769: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4957 03/27/98 01:17 cdaq Run 18768: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4956 03/27/98 01:02 dmckee HMS dipole tripped
4955 03/27/98 00:49 cdaq Run 18767: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4954 03/27/98 00:19 cdaq Run 18766: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4953 03/27/98 00:16 cdaq Run 18765: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4952 03/27/98 00:05 cdaq Run 18764: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4951 03/27/98 00:05 gaskell s2x 6+ (HMS) still acting up
Thursday
4950 03/26/98 23:59 cdaq Beam Time Accounting
4949 03/26/98 23:54 cdaq Run 18763: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4948 03/26/98 23:52 cdaq Run 18762: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4947 03/26/98 23:45 cdaq Run 18761: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4946 03/26/98 23:42 cdaq Run 18760: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
4945 03/26/98 20:28 Reinhold Update Run Plan
4944 03/26/98 18:41 gaskell revised run plan
4943 03/26/98 12:53 Reinhold Run Plan March 26
4942 03/26/98 09:07 J. Volmer Luminosity Scan result
4941 03/26/98 08:42 cdaq Beam Time Accounting
4939 03/26/98 08:30 cdaq Run 18759: BCM Calibration
4940 03/26/98 08:30 mharvey BCM Calibration
4938 03/26/98 08:26 gueye Run 18750-18758 comments
4937 03/26/98 08:13 cdaq Run 18758: 4He target
4936 03/26/98 08:00 cdaq Run 18757: 4He target
4934 03/26/98 07:55 cdaq Run 18756: 4He target
4935 03/26/98 07:54 gaskell changed helium bottle
4933 03/26/98 07:46 cdaq Run 18755: 4He target
4932 03/26/98 07:32 cdaq Run 18754: 4He target
4931 03/26/98 07:25 gueye coin_buf mode-Note for S. Wood
4930 03/26/98 07:23 gueye Run 18751-18754 comments
4929 03/26/98 07:20 cdaq Run 18753: 4He target
4928 03/26/98 07:19 cdaq Run 18752: 4He target
4927 03/26/98 07:04 cdaq Run 18751: 4He target
4926 03/26/98 06:50 cdaq Run 18750: 4He target
4925 03/26/98 06:49 cdaq Run 18749: 4He target
4924 03/26/98 06:40 cdaq Run 18748: 4He target
4923 03/26/98 06:32 gueye Superharp scan before luminosity scan
4922 03/26/98 06:18 cdaq Run 18747: 4He target
4921 03/26/98 06:15 cdaq Run 18746: 4He target
4920 03/26/98 06:10 cdaq Run 18745: 4He target
4919 03/26/98 06:07 averys changed disk
4918 03/26/98 06:02 cdaq Run 18744: 4He target
4917 03/26/98 05:52 cdaq Run 18743: test run
4916 03/26/98 05:48 Reinhold Beam! Yeah!
Wednesday
4915 03/25/98 23:59 cdaq Beam Time Accounting
4914 03/25/98 23:29 Bryon the DP calls
4913 03/25/98 23:27 Bryon Spectrometer triggers
4912 03/25/98 23:19 Bryon Getting ready for beam in hall
4911 03/25/98 23:19 cdaq Run 18742: cosmic run
4910 03/25/98 22:05 Cdaq This is Joerg's run plan for tonight
4909 03/25/98 19:45 cdaq Run 18741: Cosmic test
4908 03/25/98 17:34 cdaq Run 18740: Cosmic test
4907 03/25/98 17:16 cdaq Run 18739: Cosmic test
4906 03/25/98 16:59 saw Buffered mode
4905 03/25/98 16:50 cdaq Run 18738: DAQ test run
4904 03/25/98 15:17 Reinhold Runplan Swing Shift 3/25
4903 03/25/98 11:39 Vulcan high voltage suppy
4902 03/25/98 10:12 cdaq Run 18728: DAQ test run
4901 03/25/98 09:04 Vulcan Gas sensors
4900 03/25/98 08:42 gaskell Gas bottles open
Tuesday
4899 03/24/98 15:58 cdaq Run 18727: DAQ test run
4898 03/24/98 15:48 cdaq Run 18726: DAQ test run
4897 03/24/98 15:36 cdaq Run 18725: DAQ test run
4896 03/24/98 12:54 assamagan/en hcc23 change/PBLM's
Monday
4895 03/23/98 11:02 Reinhold Magnets off
4894 03/23/98 10:05 pawel and ga Gases closed and HV off.
4893 03/23/98 06:47 johna Coincidence trigger problem
4892 03/23/98 06:03 cdaq Beam Time Accounting
4891 03/23/98 05:02 cdaq Run 18723: pi+ production on carbon, ebeam=.845 w=1.16
4890 03/23/98 04:05 ent bpm screen
4889 03/23/98 04:02 cdaq Run 18722: pi+ production on carbon, ebeam=.845 w=1.16
4888 03/23/98 02:58 cdaq Run 18721: pi+ production on carbon, ebeam=.845 w=1.16
4887 03/23/98 01:54 cdaq Run 18720: pi+ production on carbon, ebeam=.845 w=1.16
4886 03/23/98 00:48 cdaq Run 18719: pi+ production on carbon, ebeam=.845 w=1.16
4885 03/23/98 00:09 Breuer shift summary
4884 03/23/98 00:07 cdaq Beam Time Accounting
Sunday
4883 03/22/98 23:43 cdaq Run 18718: pi+ production on carbon, ebeam=.845 w=1.16
4882 03/22/98 23:33 Breuer move to carbon target
4881 03/22/98 23:15 bpms bpmscreen
4880 03/22/98 22:50 cdaq Run 18717: pi+ production on carbon, ebeam=.845 w=1.16
4879 03/22/98 22:42 johna 18716 is carbon running
4878 03/22/98 22:41 johna Run18716-many pauses.
4877 03/22/98 22:35 averys fans off
4876 03/22/98 22:34 bpms bpms
4875 03/22/98 21:48 cdaq Run 18716: pi+ production on dummy ebeam=.845 w=1.16
4874 03/22/98 21:37 cdaq Run 18715: test run-looking for the carbon target.
4873 03/22/98 21:28 cdaq Run 18714: test run-looking for the carbon target.
4872 03/22/98 21:21 cdaq Run 18713: test run-looking for the carbon target.
4871 03/22/98 21:17 cdaq Run 18712: test run-looking for the carbon target.
4870 03/22/98 20:51 Breuer system checks, current calibrationst,start lN in compressor
4869 03/22/98 20:30 cdaq Run 18711: pi+ production on dummy ebeam=.845 w=1.16
4868 03/22/98 20:05 Reinhold encoder for the carbon target
4867 03/22/98 20:03 Reinhold Raster on dummy target
4866 03/22/98 19:58 cdaq Run 18710: pi+ production on dummy ebeam=.845 w=1.16
4865 03/22/98 19:42 Reinhold Run Plan until Monday 6am
4864 03/22/98 19:26 cdaq Run 18709: pi+ production on dummy ebeam=.845 w=1.16
4863 03/22/98 18:56 cdaq Run 18708: pi+ production on dummy ebeam=.845 w=1.16
4862 03/22/98 18:48 cdaq Run 18707: pi+ production on dummy ebeam=.845 w=1.16
4861 03/22/98 18:26 cdaq Run 18706: pi+ production on dummy ebeam=.845 w=1.16
4860 03/22/98 16:50 cdaq Beam Time Accounting
4859 03/22/98 16:41 cdaq Run 18705: pi+ production on dummy ebeam=.845 w=1.16
4858 03/22/98 16:12 cdaq Run 18704: pi+ production on dummy ebeam=.845 w=1.16
4857 03/22/98 15:58 cdaq Beam Time Accounting
4856 03/22/98 15:57 mueller shift summary
4855 03/22/98 15:40 cdaq Run 18703: pi+ production on dummy ebeam=.845 w=1.16
4854 03/22/98 15:34 bpms BPM screen
4853 03/22/98 15:11 cdaq Run 18702: pi+ production on dummy ebeam=.845 w=1.16
4852 03/22/98 13:21 cdaq Run 18701: pi+ production on dummy ebeam=.845 w=1.16
4851 03/22/98 12:51 cdaq Run 18700: pi+ production on dummy ebeam=.845 w=1.16
4850 03/22/98 12:48 bpms bpm screens
4849 03/22/98 12:21 cdaq Run 18699: pi+ production on dummy ebeam=.845 w=1.16
4848 03/22/98 11:12 Mitchell Beam line valve problems
4847 03/22/98 11:03 Mitchell Target shutdown
4846 03/22/98 10:54 Reinhold Run plan
4845 03/22/98 09:54 Reinhold sdc wiremaps
4844 03/22/98 09:04 cdaq Run 18698: pi+ production LD2 ebeam=.845 w=1.16
4843 03/22/98 08:10 ent bpm screen
4842 03/22/98 08:06 cdaq Target Shift Checklist
4841 03/22/98 08:01 cdaq Beam Time Accounting
4840 03/22/98 08:00 cdaq Run 18697: pi+ production LD2 ebeam=.845 w=1.16
4839 03/22/98 07:05 cdaq Run 18696: pi+ production LD2 ebeam=.845 w=1.16
4838 03/22/98 06:17 cdaq Run 18695: pi+ production LH2 ebeam=.845 w=1.16
4837 03/22/98 05:16 gabriel run 18693 == Junk
4836 03/22/98 05:15 cdaq Run 18694: pi+ production LH2 ebeam=.845 w=1.16
4835 03/22/98 05:07 cdaq Run 18693: pi+ production LH2 ebeam=.845 w=1.16
4834 03/22/98 04:34 cdaq Run 18692: pi+ production LH2 ebeam=.845 w=1.16
4833 03/22/98 03:35 cdaq Run 18691: pi+ production , ebeam=.845 w=1.16
4832 03/22/98 02:12 gabriel problems replaying 18689
4831 03/22/98 02:09 cdaq Run 18690: pi- production , ebeam=.845 w=1.16
4830 03/22/98 01:56 cdaq Run 18689: pi- production , ebeam=.845 w=1.16
4829 03/22/98 01:53 gabriel 18688 == Junk
4828 03/22/98 01:41 cdaq Run 18688: pi- production , ebeam=.845 w=1.16
4827 03/22/98 01:01 cdaq Run 18687: pi- production , ebeam=.845 w=1.16
4826 03/22/98 00:09 cdaq Beam Time Accounting
4825 03/22/98 00:09 breuer summary 16:00-24:00
4824 03/22/98 00:02 cdaq Run 18686: pi- production , ebeam=.845 w=1.16
Saturday
4823 03/21/98 23:43 breuer 1 am short interruption possible
4822 03/21/98 23:26 breuer DAQ crash
4821 03/21/98 23:18 cdaq Run 18685: pi- production , ebeam=.845 w=1.16
4820 03/21/98 22:31 breuer 16:00-19:00
4819 03/21/98 22:29 cdaq Run 18684: pi- production , ebeam=.845 w=1.16
4818 03/21/98 22:08 johna Argon Bottle low
4817 03/21/98 21:11 cdaq Run 18683: pi- production , ebeam=.845 w=1.16
4816 03/21/98 20:01 cdaq Run 18682: pi- production , ebeam=.845 w=1.16
4815 03/21/98 19:37 breuer structure in rad.level with dummy target at 800 mev
4814 03/21/98 18:59 cdaq Run 18681: pi- production , ebeam=.845 w=1.16
4813 03/21/98 17:46 cdaq Run 18680: pi- production , ebeam=.845 w=1.16
4812 03/21/98 16:21 cdaq Target Shift Checklist
4811 03/21/98 16:13 cdaq Run 18679: pi- production lD2 ebeam=.845 w=1.16
4810 03/21/98 16:07 bryon shift report
4809 03/21/98 16:07 cdaq Beam Time Accounting
4808 03/21/98 15:08 cdaq Run 18678: pi- production lD2 ebeam=.845 w=1.16
4807 03/21/98 14:57 bryon HMS HV for 2X and 2Y HODO planes shut down
4806 03/21/98 14:27 cdaq Run 18677: pi- production lD2 ebeam=.845 w=1.16
4805 03/21/98 14:14 Cdaq DAQ crashes yet again!!
4804 03/21/98 14:12 cdaq Run 18676: pi- production lD2 ebeam=.845 w=1.16
4803 03/21/98 14:03 bpms BPM screen
4802 03/21/98 13:51 bryon DAQ crashed yet again
4801 03/21/98 13:50 bryon Steve Wood fixed it
4800 03/21/98 13:36 cdaq Run 18675: pi- production lD2 ebeam=.845 w=1.16
4799 03/21/98 13:21 cdaq Target Shift Checklist
4798 03/21/98 13:04 Bryon DAQ crashes, reboot everything and restart
4797 03/21/98 12:52 cdaq Run 18674: pi- production lD2 ebeam=.845 w=1.16
4796 03/21/98 12:44 cdaq Run 18673: pi- production lD2 ebeam=.845 w=1.16
4795 03/21/98 11:46 bryon switched data disks
4794 03/21/98 11:44 cdaq Run 18672: pi- production lD2 ebeam=.845 w=1.16
4793 03/21/98 10:49 cdaq Run 18671: pi- production lD2 ebeam=.845 w=1.16
4792 03/21/98 09:36 cdaq Run 18670: pi- production lD2 ebeam=.845 w=1.16
4791 03/21/98 09:25 bpms bpm screen capture
4790 03/21/98 08:47 Bryon HMS hodo weirdness
4789 03/21/98 08:36 cdaq Target Shift Checklist
4788 03/21/98 08:35 cdaq Run 18669: pi- production lD2 ebeam=.845 w=1.16
4787 03/21/98 08:32 cdaq Run 18668: HMS HODO TEST
4786 03/21/98 08:26 cdaq Run 18667: HMS HODO TEST
4785 03/21/98 08:22 cdaq Run 18666: HMS HODO TEST
4784 03/21/98 08:15 cdaq Run 18665: pi- production lD2 ebeam=.845 w=1.16
4783 03/21/98 07:59 zihlmann shift history
4782 03/21/98 07:59 cdaq Beam Time Accounting
4781 03/21/98 07:52 averys hms hodo turned off
4780 03/21/98 07:43 cdaq Run 18664: pi- production lD2 ebeam=.845 w=1.16
4779 03/21/98 06:53 cdaq Run 18663: pi- production lD2 ebeam=.845 w=1.16
4778 03/21/98 05:56 cdaq Run 18662: pi- production lD2 ebeam=.845 w=1.16
4777 03/21/98 05:42 cdaq Run 18661: pi- production lD2 ebeam=.845 w=1.16
4776 03/21/98 04:43 zihlmann TGT gui problem in loop1 charts
4775 03/21/98 04:30 cdaq Run 18660: pi- production lD2 ebeam=.845 w=1.16
4774 03/21/98 03:47 cdaq Run 18659: pi- production lD2 ebeam=.845 w=1.16
4773 03/21/98 03:40 johna Errors in replay of run 18657
4772 03/21/98 03:35 cdaq Run 18658: pi- production lD2 ebeam=.845 w=1.16
4771 03/21/98 03:21 johna Visual scaler reset signal.
4770 03/21/98 03:19 cdaq Run 18657: pi- production lD2 ebeam=.845 w=1.16
4769 03/21/98 02:59 johna cdaqh1/2 problem
4768 03/21/98 02:39 johna 1st two BCM calibrations are bad.
4767 03/21/98 02:32 cdaq Run 18656: BCM calibration
4766 03/21/98 02:15 cdaq Run 18655: BCM calibration
4765 03/21/98 02:12 zihlmann, ar Run 18654 was a BCM Calibraion
4764 03/21/98 01:52 cdaq Run 18654: pi- production lD2 ebeam=.845 w=1.16
4763 03/21/98 01:19 zihlmann, ar clear signal for visual scalers
4762 03/21/98 01:12 cdaq Run 18653: pi- production lD2 ebeam=.845 w=1.16
4761 03/21/98 01:08 cdaq Run 18652: pi- production lD2 ebeam=.845 w=1.16
4760 03/21/98 00:39 cdaq Run 18651: pi- production lD2 ebeam=.845 w=1.16
4759 03/21/98 00:36 cdaq Run 18650: pi- production lD2 ebeam=.845 w=1.16
4758 03/21/98 00:34 cdaq Run 18649: pi- production lD2 ebeam=.845 w=1.16
4757 03/21/98 00:32 cdaq Run 18648: pi- production lD2 ebeam=.845 w=1.16
4756 03/21/98 00:24 cdaq Run 18647: pi- production lD2 ebeam=.845 w=1.16
4755 03/21/98 00:07 cdaq Beam Time Accounting
4754 03/21/98 00:06 breuer to Joerg: warming up target message
4753 03/21/98 00:03 breuer shift summary 16:00-24:00
4752 03/21/98 00:01 breuer no beam
Friday
4751 03/20/98 23:41 segel BPM charts
4750 03/20/98 23:32 breuer 10 min no beam
4749 03/20/98 23:12 johna restored replay.parm
4748 03/20/98 23:01 cdaq Run 18646: pi- production lD2 ebeam=.845 w=1.16
4747 03/20/98 22:56 breuer vmec2 rebooted
4746 03/20/98 22:55 cdaq Run 18645: pi- production lD2 ebeam=.845 w=1.16
4745 03/20/98 22:01 johna cdah1/2 paw++ problems.
4744 03/20/98 21:50 cdaq Run 18644: pi- production lD2 ebeam=.845 w=1.16
4743 03/20/98 20:38 cdaq Run 18643: pi- production lD2 ebeam=.845 w=1.16
4742 03/20/98 20:35 johna No work disks.
4741 03/20/98 20:23 breuer Problems with CDAQH2 and paw
4740 03/20/98 20:18 breuer no beam/ low beam
4739 03/20/98 20:10 cdaq Run 18642: pi- production lD2 ebeam=.845 w=1.16
4738 03/20/98 19:36 sawafta beam back
4736 03/20/98 19:35 cdaq Run 18641: pi- production lD2 ebeam=.845 w=1.16
4737 03/20/98 19:34 breuer beam back
4735 03/20/98 18:00 breuer beam off for system checks
4734 03/20/98 17:21 cdaq Run 18640: pi- production lD2 ebeam=.845 w=1.16
4733 03/20/98 17:14 Reinhold replay crashes
4732 03/20/98 16:10 cdaq Run 18639: pi- production lD2 ebeam=.845 w=1.16
4731 03/20/98 15:57 cdaq Beam Time Accounting
4730 03/20/98 15:56 bryon shift report
4729 03/20/98 15:42 bryon system check
4728 03/20/98 15:37 cdaq Run 18638: pi- production lD2 ebeam=.845 w=1.16
4727 03/20/98 15:18 cdaq Run 18637: pi- production lD2 ebeam=.845 w=1.16
4726 03/20/98 14:57 segel BPM screen
4725 03/20/98 14:51 cdaq Target Shift Checklist
4724 03/20/98 14:47 Mack bscopes restarted
4723 03/20/98 14:24 cdaq Run 18636: pi- production lD2 ebeam=.845 w=1.16
4722 03/20/98 14:08 Mack general Hall C business: Hickson get your email fixed
4721 03/20/98 13:23 bryon DAQ crashes
4720 03/20/98 13:22 cdaq Run 18635: junk test run
4719 03/20/98 12:04 cdaq Run 18634: pi- production lD2 ebeam=.845 w=1.16
4718 03/20/98 11:29 cdaq Run 18633: pi- production lD2 ebeam=.845 w=1.16
4717 03/20/98 10:29 cdaq Run 18632: pi- production lD2 ebeam=.845 w=1.16
4716 03/20/98 10:06 cdaq Target Shift Checklist
4715 03/20/98 09:31 cdaq Run 18631: pi- production lD2 ebeam=.845 w=1.16
4714 03/20/98 08:27 cdaq Run 18630: pi- production lD2 ebeam=.845 w=1.16
4713 03/20/98 08:06 cdaq Target Shift Checklist
4712 03/20/98 08:00 cdaq Beam Time Accounting
4711 03/20/98 07:59 johna Shift Summary, 00:00-08:00
4710 03/20/98 07:35 cdaq Run 18629: pi- production lD2 ebeam=.845 w=1.16
4709 03/20/98 07:28 gaskell bpm screen
4708 03/20/98 06:39 cdaq Run 18628: pi- production lD2 ebeam=.845 w=1.16
4707 03/20/98 05:53 gaskell changed data disk to data5
4706 03/20/98 05:49 cdaq Run 18627: pi- production lD2 ebeam=.845 w=1.16
4705 03/20/98 05:24 pawel Shift checklist
4704 03/20/98 05:00 cdaq Run 18626: pi- production lD2 ebeam=.845 w=1.16
4703 03/20/98 04:14 cdaq Run 18625: pi- production lD2 ebeam=.845 w=1.16
4702 03/20/98 04:04 gaskell bpm screens
4701 03/20/98 03:15 cdaq Run 18624: pi- production lD2 ebeam=.845 w=1.16
4700 03/20/98 03:12 johna Change in HMS trigger.
4699 03/20/98 03:02 cdaq Run 18623: pi- production lD2 ebeam=.845 w=1.16
4698 03/20/98 02:18 cdaq Run 18622: pi- production lD2 ebeam=.845 w=1.16
4697 03/20/98 00:02 sawafta beam off
4696 03/20/98 00:00 cdaq Beam Time Accounting
Thursday
4695 03/19/98 23:57 breuer shift summary 16:00-24:00
4694 03/19/98 23:47 cdaq Run 18621: pi- production lD2 ebeam=.845 w=1.16
4693 03/19/98 23:39 breuer system checks planned after midnight
4692 03/19/98 22:47 breuer no beam period
4691 03/19/98 22:47 cdaq Run 18620: pi- production lD2 ebeam=.845 w=1.16
4690 03/19/98 21:35 cdaq Run 18619: pi- production lD2 ebeam=.845 w=1.16
4689 03/19/98 20:15 cdaq Run 18618: pi- production lD2 ebeam=.845 w=1.16
4688 03/19/98 19:16 cdaq Run 18617: pi- production lD2 ebeam=.845 w=1.16
4687 03/19/98 18:13 breuer BPM repair
4686 03/19/98 18:13 cdaq Run 18616: pi- production lD2 ebeam=.845 w=1.16
4685 03/19/98 18:08 geesaman BPM IOC needs to bbe rebooted
4684 03/19/98 16:49 cdaq Run 18615: pi- production lD2 ebeam=.845 w=1.16
4683 03/19/98 16:21 mueller bpm screen grab
4682 03/19/98 16:07 mueller shift notes
4681 03/19/98 16:07 cdaq Beam Time Accounting
4680 03/19/98 15:46 cdaq Run 18614: pi- production lD2 ebeam=.845 w=1.16
4679 03/19/98 15:46 Mack Regarding Dave McKee's luminosity scan analysis
4678 03/19/98 14:47 cdaq Run 18613: pi- production lD2 ebeam=.845 w=1.16
4677 03/19/98 13:58 Geeesaman Shift Check list
4676 03/19/98 13:48 geesaman bpm screen in checklist
4675 03/19/98 13:45 cdaq Run 18612: pi- production lD2 ebeam=.845 w=1.16
4674 03/19/98 12:49 cdaq Run 18611: pi- production lD2 ebeam=.845 w=1.16
4673 03/19/98 12:47 dmckee Preliminary D2 Luminosity scan, scaler, HMS, SOS
4672 03/19/98 12:44 dmckee Preliminary H2, D2, Luminosity Scan, scalers, HMS, SOS
4671 03/19/98 12:25 cdaq Run 18610: bcm calibration run
4670 03/19/98 11:57 mueller bpm screen caputure
4669 03/19/98 11:42 cdaq Run 18609: pi- production lD2 ebeam=.845 w=1.16
4668 03/19/98 11:38 cdaq Run 18608: pi- production lD2 ebeam=.845 w=1.16
4667 03/19/98 11:37 Mack beam energy has been breathing
4666 03/19/98 11:14 cdaq Run 18607: pi- production lD2 ebeam=.845 w=1.16
4665 03/19/98 10:39 cdaq Run 18606: pi- production lD2 ebeam=.845 w=1.16
4664 03/19/98 09:44 cdaq Run 18605: pi- production lD2 ebeam=.845 w=1.16
4663 03/19/98 08:21 cdaq Target Shift Checklist
4662 03/19/98 08:00 zihlmann Shift notes
4661 03/19/98 07:59 cdaq Beam Time Accounting
4660 03/19/98 07:44 zihlmann beam profile monitors
4659 03/19/98 07:37 cdaq Run 18604: pi- production lD2 ebeam=.845 w=1.16
4658 03/19/98 07:20 gaskell W=1.6 GeV Phase Space
4657 03/19/98 06:40 cdaq Run 18603: pi- production lD2 ebeam=.845 w=1.16
4656 03/19/98 05:40 cdaq Run 18602: pi- production lD2 ebeam=.845 w=1.16
4655 03/19/98 05:22 averys replay error - run 18600
4654 03/19/98 04:40 cdaq Run 18601: pi- production lD2 ebeam=.845 w=1.16
4653 03/19/98 03:51 cdaq Target Shift Checklist
4652 03/19/98 03:00 cdaq Run 18600: pi+ production lD2 ebeam=.845 w=1.16
4651 03/19/98 02:08 cdaq Run 18599: pi+ production lD2 ebeam=.845 w=1.16
4650 03/19/98 00:58 cdaq Run 18598: pi+ production lD2 ebeam=.845 w=1.16
4649 03/19/98 00:55 cdaq Run 18597: pi+ production lD2 ebeam=.845 w=1.16
4648 03/19/98 00:40 johna SOS thresholds vs. singles rates
4647 03/19/98 00:08 koltenuk Pi+ count status
4646 03/19/98 00:07 cdaq Beam Time Accounting
4645 03/19/98 00:07 cdaq Beam Time Accounting
4644 03/19/98 00:06 cdaq Beam Time Accounting
4643 03/19/98 00:04 breuer shift summary 16:00-24:00
Wednesday
4642 03/18/98 23:58 koltenuk HMS SOS threshold change
4641 03/18/98 23:54 cdaq Run 18596: pi+ production lD2 ebeam=.845 w=1.16
4640 03/18/98 23:26 Cowley BPM screen
4639 03/18/98 23:06 breuer SOS polarity change postponed to 1:30 am
4638 03/18/98 23:04 cdaq Run 18595: pi+ production lD2 ebeam=.845 w=1.16
4637 03/18/98 22:19 koltenuk HMS SOS threshold change
4636 03/18/98 22:15 cdaq Run 18594: pi+ production lD2 ebeam=.845 w=1.16
4635 03/18/98 22:01 cdaq Run 18593: pi+ production lD2 ebeam=.845 w=1.16
4634 03/18/98 21:01 cdaq Run 18592: pi+ production lD2 ebeam=.845 w=1.16
4633 03/18/98 20:03 cdaq Run 18591: pi+ production lD2 ebeam=.845 w=1.16
4632 03/18/98 19:03 cdaq Run 18590: pi+ production lD2 ebeam=.845 w=1.16
4631 03/18/98 18:50 segal bpm picture for old checklist
4630 03/18/98 18:18 Reinhold D2 40uA running
4629 03/18/98 18:17 johna 'statistics' vs current calculation
4628 03/18/98 18:04 breuer change of beam current
4627 03/18/98 18:03 cdaq Run 18589: pi+ production lD2 ebeam=.845 w=1.16
4626 03/18/98 17:04 cdaq Run 18588: pi+ production lD2 ebeam=.845 w=1.16
4625 03/18/98 16:16 cdaq Beam Time Accounting
4624 03/18/98 16:04 cdaq Run 18587: pi+ production lD2 ebeam=.845 w=1.16
4623 03/18/98 15:04 cdaq Run 18586: pi+ production lD2 ebeam=.845 w=1.16
4622 03/18/98 15:01 gilman statistical uncertainty for large currents
4621 03/18/98 14:10 anon So what happened when Ibeam was increased?
4620 03/18/98 14:04 cdaq Run 18585: pi+ production lD2 ebeam=.845 w=1.16
4619 03/18/98 13:50 mack note bcm calibration was changed around 18400
4618 03/18/98 13:07 cdaq Run 18584: pi+ production lD2 ebeam=.845 w=1.16
4617 03/18/98 12:15 cdaq Run 18583: pi+ production lD2 ebeam=.845 w=1.16
4616 03/18/98 12:06 cdaq Target Shift Checklist
4615 03/18/98 11:27 cdaq Run 18582: pi+ production lD2 ebeam=.845 w=1.16
4614 03/18/98 11:15 anklin DAQ crash
4613 03/18/98 11:12 cdaq Run 18581: pi+ production lD2 ebeam=.845 w=1.16
4612 03/18/98 10:45 Anklin BCM calib. analysis plots cont.
4611 03/18/98 10:45 Anklin BCM calibr. analysis plots cont.
4610 03/18/98 10:43 H. Anklin BCM1/BCM2 ratios for all runs (up to now)
4609 03/18/98 10:43 mack hodo slop parameters nice and loose
4608 03/18/98 10:06 cdaq Target Shift Checklist
4607 03/18/98 09:53 cdaq Run 18580: pi+ production lD2 ebeam=.845 w=1.16
4606 03/18/98 09:33 Anklin BCM calibration analysis run 18571
4604 03/18/98 09:21 Anklin BCM calibr. plots cont.
4605 03/18/98 09:21 Anklin BCM calibr. plots cont.
4603 03/18/98 09:20 Anklin BCM calibration analysis run 18544
4602 03/18/98 08:34 cdaq Run 18579: pi+ production lD2 ebeam=.845 w=1.16
4601 03/18/98 08:25 cdaq Beam Time Accounting
4600 03/18/98 08:06 cdaq Target Shift Checklist
4599 03/18/98 07:35 gaskell 18577 is junk
4598 03/18/98 07:33 cdaq Run 18578: pi+ production lD2 ebeam=.845 w=1.16
4597 03/18/98 07:22 cdaq Run 18577: pi+ production lD2 ebeam=.845 w=1.16
4596 03/18/98 06:45 Dunne Shift Checklist
4595 03/18/98 06:40 cdaq Run 18576: pi+ production lD2 ebeam=.845 w=1.16
4594 03/18/98 06:37 cdaq Run 18575: pi+ production lD2 ebeam=.845 w=1.16
4593 03/18/98 06:33 Dunne BPM screen
4592 03/18/98 06:17 cdaq Run 18574: pi+ production lD2 ebeam=.845 w=1.16
4591 03/18/98 06:02 cdaq Run 18573: pi+ production lD2 ebeam=.845 w=1.16
4590 03/18/98 05:05 cdaq Run 18572: pi+ production lD2 ebeam=.845 w=1.16
4589 03/18/98 04:42 cdaq Run 18571: BCM CALIBRATION
4588 03/18/98 04:10 cdaq Run 18570: pi+ production lD2 ebeam=.845 w=1.16
4587 03/18/98 04:01 cdaq Run 18569: pi+ production lD2 ebeam=.845 w=1.16
4586 03/18/98 02:58 cdaq Run 18568: pi+ production lD2 ebeam=.845 w=1.16
4585 03/18/98 02:00 cdaq Run 18567: pi+ production lD2 ebeam=.845 w=1.16
4584 03/18/98 00:58 cdaq Run 18566: pi+ production lD2 ebeam=.845 w=1.16
4583 03/18/98 00:07 cdaq Run 18565: pi+ production lD2 ebeam=.845 w=1.16
4582 03/18/98 00:06 cdaq Beam Time Accounting
4581 03/18/98 00:04 breuer 22:00 - 24:00
Tuesday
4580 03/17/98 23:55 cdaq Run 18564: pi+ production lD2 ebeam=.845 w=1.16
4579 03/17/98 22:53 cdaq Run 18563: pi+ production lD2 ebeam=.845 w=1.16
4578 03/17/98 21:56 breuer 19:40 - 22:00
4577 03/17/98 21:53 cdaq Run 18562: pi+ production lD2 ebeam=.845 w=1.16
4576 03/17/98 21:18 oneill BPM screen
4575 03/17/98 20:43 cdaq Run 18561: pi+ production lD2 ebeam=.845 w=1.16
4574 03/17/98 20:40 koltenuk SOS drift chambers off
4573 03/17/98 20:37 koltenuk SOS scin off
4572 03/17/98 20:30 cdaq Run 18560: pi+ production lD2 ebeam=.845 w=1.16
4571 03/17/98 19:50 cdaq Run 18559: pi+ production lD2 ebeam=.845 w=1.16
4570 03/17/98 19:01 breuer 16:00 to 19:00
4568 03/17/98 16:34 cdaq Run 18557: pi+ production lD2 ebeam=.845 w=1.16
4567 03/17/98 16:03 cdaq Beam Time Accounting
4566 03/17/98 16:02 mack shift summary
4565 03/17/98 15:50 cdaq Run 18556: pi+ production lD2 ebeam=.845 w=1.16
4564 03/17/98 15:13 r gilman bpm screen for shift checklist
4563 03/17/98 15:01 cdaq Run 18555: pi+ production lD2 ebeam=.845 w=1.16
4562 03/17/98 14:17 cdaq Run 18554: pi+ production lD2 ebeam=.845 w=1.16
4561 03/17/98 13:58 cdaq Run 18553: pi+ production lD2 ebeam=.845 w=1.16
4560 03/17/98 13:14 mack homework sheet for sos quad tweak
4559 03/17/98 13:09 mack,avery hms S2 trip
4558 03/17/98 13:07 cdaq Run 18552: pi+ production lD2 ebeam=.845 w=1.16
4557 03/17/98 13:03 mack,reinhol fudged sos quad current as per D Potterveld
4556 03/17/98 13:00 cdaq Run 18551: pi+ production lD2 ebeam=.845 w=1.16
4555 03/17/98 12:17 cdaq Run 18550: pi+ production lD2 ebeam=3.245 w=1.6
4554 03/17/98 11:56 averys runs 18545-18549
4553 03/17/98 11:51 averys run 18548
4552 03/17/98 11:35 cdaq Run 18549: pi+ production lD2 ebeam=3.245 w=1.6
4551 03/17/98 11:26 cdaq Run 18548: pi+ production lD2 ebeam=3.245 w=1.6
4550 03/17/98 11:16 cdaq Run 18547: pi+ production lD2 ebeam=3.245 w=1.6
4549 03/17/98 11:11 cdaq Run 18546: pi+ production lD2 ebeam=3.245 w=1.6
4548 03/17/98 11:08 cdaq Run 18545: pi+ production lD2 ebeam=3.245 w=1.6
4547 03/17/98 10:38 cdaq Run 18544: bc calibration lD2 ebeam=3.245 w=1.6
4547 03/17/98 10:38 cdaq Run 18542: bcm calibration, ebeam=3.245 w=1.6
4545 03/17/98 09:28 fowler spectrometer rotation
4544 03/17/98 07:44 H. Anklin Replaced He-bottle and shift check list
4543 03/17/98 07:11 ddutta shift report
4542 03/17/98 07:08 cdaq Beam Time Accounting
4541 03/17/98 06:38 H. Anklin Q2 tripped
4540 03/17/98 06:36 ddutta Q2 trip
4539 03/17/98 06:31 gaskell Q2 DIES
4538 03/17/98 06:23 H. Anklin BPM medm screen
4537 03/17/98 06:18 cdaq Run 18541: pi+ production lD2 ebeam=3.245 w=1.6
4536 03/17/98 06:06 cdaq Target Shift Checklist
4535 03/17/98 05:48 cdaq Run 18540: pi+ production lD2 ebeam=3.245 w=1.6
4534 03/17/98 05:13 cdaq Run 18539: pi+ production lD2 ebeam=3.245 w=1.6
4533 03/17/98 04:52 gaskell fixed tv cable connector
4532 03/17/98 04:49 gaskell spectrometer rotation gui dead
4531 03/17/98 04:42 cdaq Run 18538: pi+ production lD2 ebeam=3.245 w=1.6
4530 03/17/98 04:40 cdaq Run 18537: pi+ production lD2 ebeam=3.245 w=1.6
4529 03/17/98 04:36 cdaq Run 18536: pi+ production lD2 ebeam=3.245 w=1.6
4528 03/17/98 03:39 gaskell Beam energy
4527 03/17/98 03:36 cdaq Run 18535: pi+ production C-12, ebeam=3.245 w=1.6
4526 03/17/98 03:32 ddutta daq crash
4525 03/17/98 03:29 cdaq Run 18534: pi+ production C-12, ebeam=3.245 w=1.6
4524 03/17/98 03:26 gaskell Carbon coincidences
4523 03/17/98 03:22 gaskell Runs 18522 -18528 are probably junk
4522 03/17/98 02:18 cdaq Run 18533: pi+ production C-12, ebeam=3.245 w=1.6
4521 03/17/98 01:22 cdaq Run 18532: pi+ production C-12, ebeam=3.245 w=1.6
4520 03/17/98 01:10 cdaq Run 18531: pi+ production C-12, ebeam=3.245 w=1.6
4519 03/17/98 01:06 cdaq Run 18530: pi+ production C-12, ebeam=3.245 w=1.6
4517 03/17/98 01:03 cdaq Run 18529: pi+ production C-12, ebeam=3.245 w=1.6
4518 03/17/98 01:02 ddutta SOS hodoscopes
4516 03/17/98 00:43 cdaq Run 18528: pi+ production C-12, ebeam=3.245 w=1.6
4515 03/17/98 00:38 cdaq Run 18527: pi+ production C-12, ebeam=3.245 w=1.6
4514 03/17/98 00:35 cdaq Run 18526: pi+ production C-12, ebeam=3.245 w=1.6
4513 03/17/98 00:33 cdaq Run 18525: pi+ production C-12, ebeam=3.245 w=1.6
4512 03/17/98 00:30 cdaq Run 18524: pi+ production C-12, ebeam=3.245 w=1.6
4511 03/17/98 00:27 cdaq Run 18523: pi+ production C-12, ebeam=3.245 w=1.6
4510 03/17/98 00:22 cdaq Run 18522: pi+ production C-12, ebeam=3.245 w=1.6
4509 03/17/98 00:06 baker End of Shift Report
4508 03/17/98 00:04 cdaq Beam Time Accounting
Monday
4506 03/16/98 23:55 koltenuk HMS scin S2X 8+
4507 03/16/98 23:55 koltenuk extra events
4505 03/16/98 23:26 cdaq Run 18521: pi- production C-12, ebeam=3.245 w=1.6
4504 03/16/98 23:24 cdaq Run 18520: pi- production C-12, ebeam=3.245 w=1.6
4503 03/16/98 23:11 koltenuk HMS scin S2X, S2Y
4502 03/16/98 23:11 cdaq Run 18519: pi- production C-12, ebeam=3.245 w=1.6
4501 03/16/98 23:04 koltenuk MCC moves beam
4500 03/16/98 22:51 cdaq Run 18518: pi- production C-12, ebeam=3.245 w=1.6
4499 03/16/98 22:39 cdaq Run 18517: pi- production C-12, ebeam=3.245 w=1.6
4498 03/16/98 22:12 cdaq Run 18516: pi- production C-12, ebeam=3.245 w=1.6
4497 03/16/98 22:05 oneill BPM screen
4496 03/16/98 21:41 cdaq Run 18515: pi- production C-12, ebeam=3.245 w=1.6
4495 03/16/98 21:29 koltenuk HMS dipole problems
4494 03/16/98 20:23 cdaq Run 18514: pi- production C-12, ebeam=3.245 w=1.6
4493 03/16/98 20:22 cdaq Run 18513: pi- production C-12, ebeam=3.245 w=1.6
4492 03/16/98 20:13 cdaq Run 18512: pi- production C-12, ebeam=3.245 w=1.6
4491 03/16/98 19:56 cdaq Run 18511: pi- production C-12, ebeam=3.245 w=1.6
4490 03/16/98 19:42 koltenuk disk space problems,extra events
4489 03/16/98 19:39 koltenuk HMS Q2 problem
4488 03/16/98 19:18 cdaq Run 18510: pi- production LH2, ebeam=3.245 w=1.6
4487 03/16/98 19:15 cdaq Run 18509: pi- production LH2, ebeam=3.245 w=1.6
4486 03/16/98 19:12 cdaq Run 18508: pi- production LH2, ebeam=3.245 w=1.6
4485 03/16/98 18:43 cdaq Run 18507: pi- production LD2, ebeam=3.245 w=1.6
4484 03/16/98 18:27 cdaq Run 18506: pi- production LD2, ebeam=3.245 w=1.6
4483 03/16/98 18:17 cdaq Run 18505: pi- production LD2, ebeam=3.245 w=1.6
4482 03/16/98 18:01 cdaq Run 18504: pi- production LD2, ebeam=3.245 w=1.6
4481 03/16/98 17:50 cdaq Run 18503: pi- production LD2, ebeam=3.245 w=1.6
4480 03/16/98 17:33 cdaq Run 18502: pi- production LD2, ebeam=3.245 w=1.6
4479 03/16/98 17:15 cdaq Run 18501: pi- production LD2, ebeam=3.245 w=1.6
4478 03/16/98 16:53 Papavassilio BPM screen
4477 03/16/98 16:47 gilman run 18499 HMS S2xR+ replay oddity
4476 03/16/98 16:17 koltenuk systems check
4475 03/16/98 16:16 koltenuk HMS scin S2X, S2Y
4474 03/16/98 16:11 mack shift summary
4473 03/16/98 16:09 cdaq Beam Time Accounting
4472 03/16/98 16:03 mack recommend take more data on d(e,e'pi-)
4471 03/16/98 16:01 cdaq Run 18500: pi- production c12, ebeam=3.245 w=1.6
4470 03/16/98 15:42 cdaq Run 18499: 4cm dummy, ebeam=3.245 w=1.6
4469 03/16/98 15:29 cdaq Run 18498: 4cm dummy, ebeam=3.245 w=1.6
4468 03/16/98 15:21 gilman data acq runs 18493 - 18497
4466 03/16/98 15:19 cdaq Run 18497: pi- production on lD2 target, ebeam=3.245 w=1.6
4467 03/16/98 15:19 mack downloaded new thresholds
4465 03/16/98 15:01 cdaq Run 18496: pi- production on lD2 target, ebeam=3.245 w=1.6
4464 03/16/98 14:53 cdaq Run 18495: pi- production on lD2 target, ebeam=3.245 w=1.6
4463 03/16/98 14:50 cdaq Run 18494: pi- production on lD2 target, ebeam=3.245 w=1.6
4462 03/16/98 14:31 cdaq Run 18493: pi- production on lD2 target, ebeam=3.245 w=1.6
4461 03/16/98 14:21 gilman replay troubles for 18491
4460 03/16/98 14:07 cdaq Run 18492: pi- production on lD2 target, ebeam=3.245 w=1.6
4459 03/16/98 13:49 cdaq Run 18491: pi- production on lD2 target, ebeam=3.245 w=1.6
4458 03/16/98 13:40 mack hodo pedestal shifts
4457 03/16/98 13:30 saw DAQ down
4456 03/16/98 12:30 cdaq Run 18490: pi- production on lD2 target, ebeam=3.245 w=1.6
4455 03/16/98 12:10 Wood, Gueye, HV troubles and h1x16+ undervoltage
4454 03/16/98 12:09 cdaq Run 18489: pi- production on lD2 target, ebeam=3.245 w=1.6
4453 03/16/98 10:45 mack bcm calibration using bcmcal_v3.pcm
4452 03/16/98 10:12 Lassiter SOS rotation set to 50 degrees
4451 03/16/98 09:53 cdaq Run 18488: entry in progress. taking a long unser zero run.
4450 03/16/98 09:36 cdaq Target Shift Checklist
4449 03/16/98 08:53 H. Anklin shift check list
4448 03/16/98 08:44 H. Anklin Wrong angles in run18487 comment file
4447 03/16/98 08:22 H. Anklin HMS Dipole trip
4446 03/16/98 08:20 gaskell changed sos thresholds file
4445 03/16/98 08:08 ddutta shift report
4444 03/16/98 08:01 cdaq Beam Time Accounting
4443 03/16/98 07:38 H. Anklin Bad O-Ring
4442 03/16/98 07:33 H. Anklin He bottle and He flux
4441 03/16/98 07:27 cdaq Run 18487: pi- production on lD2 target, ebeam=3.245 w=1.6
4440 03/16/98 07:25 H. Anklin BPM medm screen
4439 03/16/98 07:07 gaskell rebuilding our ntuple collection
4438 03/16/98 06:53 cdaq Run 18486: BCM calibration
4437 03/16/98 06:33 gaskell HMS dipole fix
4436 03/16/98 06:22 cdaq Run 18485: JUNK!!
4435 03/16/98 06:18 gaskell HMS epics HV
4434 03/16/98 05:34 ddutta Warning lights on the HMS dipole
4433 03/16/98 04:11 ddutta nuked a partition
4432 03/16/98 03:56 cdaq Run 18484: pi+ production on CARBON target, ebeam=3.245, w=1.6
4431 03/16/98 03:16 cdaq Run 18483: pi+ production on CARBON target, ebeam=3.245, w=1.6
4430 03/16/98 02:42 cdaq Run 18482: pi+ production on CARBON target, ebeam=3.245, w=1.6
4429 03/16/98 02:04 oneill HMS Q2 crash
4428 03/16/98 01:43 cdaq Run 18481: pi+ production on CARBON target, ebeam=3.245, w=1.6
4427 03/16/98 01:37 cdaq Run 18480: pi+ production on CARBON target, ebeam=3.245, w=1.6
4426 03/16/98 01:23 ddutta extra events
4425 03/16/98 01:19 ddutta unusual extra event message
4424 03/16/98 01:07 oneill HMS dipole recovered
4423 03/16/98 01:01 cdaq Run 18479: pi+ production on dummy target, ebeam=3.245, w=1.6
4422 03/16/98 00:44 oneill HMS dipole trip
4421 03/16/98 00:36 cdaq Target Shift Checklist
4420 03/16/98 00:33 cdaq Run 18478: pi+ production on dummy target, ebeam=3.245, w=1.6
4419 03/16/98 00:30 cdaq Run 18477: pi+ production on dummy target, ebeam=3.245, w=1.6
4418 03/16/98 00:27 cdaq Run 18476: pi+ production on dummy target, ebeam=3.245, w=1.6
4417 03/16/98 00:12 cdaq Beam Time Accounting
Sunday
4416 03/15/98 23:44 cdaq Run 18475: pi+ production on LD2 target, ebeam=3.245, w=1.6
4415 03/15/98 23:33 koltenuk HMS thresholds
4414 03/15/98 23:24 cdaq Run 18474: pi+ production on LD2 target, ebeam=3.245, w=1.6
4413 03/15/98 23:07 koltenuk HMS thresholds
4412 03/15/98 23:04 cdaq Run 18473: pi+ production on LD2 target, ebeam=3.245, w=1.6
4411 03/15/98 23:03 gaskelld coin ntuples written directly to work disk - for real!!!
4410 03/15/98 22:28 cdaq Run 18472: pi+ production on LD2 target, ebeam=3.245, w=1.6
4409 03/15/98 22:07 cdaq Run 18471: pi+ production on LD2 target, ebeam=3.245, w=1.6
4408 03/15/98 21:59 oneill BPM screen
4407 03/15/98 21:49 cdaq Run 18470: pi+ production on LD2 target, ebeam=3.245, w=1.6
4406 03/15/98 21:37 koltenuk HMS thresholds
4405 03/15/98 21:30 cdaq Run 18469: pi+ production on LD2 target, ebeam=3.245, w=1.6
4404 03/15/98 21:26 cdaq Run 18468: pi+ production on LD2 target, ebeam=3.245, w=1.6
4403 03/15/98 21:16 koltenuk HMS thresholds
4402 03/15/98 21:03 koltenuk DAQ problem
4401 03/15/98 21:02 cdaq Run 18467: pi+ production on LH2 target, ebeam=3.245, w=1.6
4400 03/15/98 20:55 cdaq Run 18466: pi+ production on LH2 target, ebeam=3.245, w=1.6
4399 03/15/98 20:41 cdaq Run 18465: pi+ production on LH2 target, ebeam=3.245, w=1.6
4398 03/15/98 20:26 cdaq Run 18464: pi+ production on LH2 target, ebeam=3.245, w=1.6
4397 03/15/98 19:33 cdaq Run 18463: pi+ production on LH2 target, ebeam=3.245, w=1.6
4396 03/15/98 19:27 cdaq Run 18462: pi+ production on LH2 target, ebeam=3.245, w=1.6
4395 03/15/98 19:25 cdaq Run 18461: pi+ production on LH2 target, ebeam=3.245, w=1.6
4394 03/15/98 19:19 cdaq Run 18460: pi+ production on LH2 target, ebeam=3.245, w=1.6
4393 03/15/98 17:33 koltenuk deuterium data, Monte Carlo simulation
4392 03/15/98 16:46 Reinhold Smart Move !?!?
4391 03/15/98 16:06 cdaq Target Shift Checklist
4390 03/15/98 16:04 cdaq Beam Time Accounting
4389 03/15/98 14:16 CRJackson He usage
4388 03/15/98 13:36 johna HDC1y2 wire map.
4387 03/15/98 13:31 cdaq Run 18459: mini-bcm calibration ps1=1200, ps2=2000,ps3=1,ps4=1
4386 03/15/98 13:04 cdaq Run 18458: 4cm dummy, ebeam=1.645, w=1.16
4385 03/15/98 12:51 cdaq Run 18457: pi+ production on lD2 target, ebeam=1.645, w=1.16
4384 03/15/98 12:18 cdaq Run 18456: pi+ production on lD2 target, ebeam=1.645, w=1.16
4383 03/15/98 12:17 johna HMS HV Alarm
4382 03/15/98 12:03 cdaq Run 18455: pi+ production on lD2 target, ebeam=1.645, w=1.16
4381 03/15/98 11:23 gueye DAQ problem
4380 03/15/98 11:22 cdaq Run 18454: pi+ production on lD2 target, ebeam=1.645, w=1.16
4379 03/15/98 11:12 cdaq Run 18453: pi+ production on lH2 target, ebeam=1.645, w=1.16
4378 03/15/98 10:35 cdaq Run 18452: pi+ production on lD2 target, ebeam=1.645, w=1.16
4377 03/15/98 09:58 cdaq Run 18451: pi+ production on lH2 target, ebeam=1.645, w=1.16
4376 03/15/98 09:36 cdaq Run 18450: pi+ production on lH2 target, ebeam=1.645, w=1.16
4375 03/15/98 08:52 cdaq Run 18449: pi+ production on lH2 target, ebeam=1.645, w=1.16
4374 03/15/98 08:06 cdaq Beam Time Accounting
4373 03/15/98 07:54 cdaq Run 18448: pi+ production on lH2 target, ebeam=1.645, w=1.16
4372 03/15/98 07:48 gaskell HMS HV:The saga coninues
4371 03/15/98 07:46 cdaq Run 18447: pi+ production on lH2 target, ebeam=1.645, w=1.16
4370 03/15/98 07:43 cdaq Run 18446: BCM calibration 12C 2pass
4369 03/15/98 07:39 cdaq Run 18445: HMS hodo checkout
4368 03/15/98 07:33 cdaq Run 18444: HMS hodo checkout
4367 03/15/98 07:31 cdaq Run 18443: HMS hodo checkout
4366 03/15/98 07:27 ddutta The HV epic(s) saga.
4365 03/15/98 03:05 johna HV alarm disabled
4364 03/15/98 00:36 J. Volmer HMS DC TDC cable adjustment
4363 03/15/98 00:34 johna Pictures for entry 4362.
4362 03/15/98 00:25 johna HDC1X2 (and maybe 1y2) cabling problem.
4361 03/15/98 00:13 koltenuk HMS scin HV problems
4360 03/15/98 00:09 volmer shift checklist BPM screens
4359 03/15/98 00:05 cdaq Beam Time Accounting
Saturday
4358 03/14/98 23:51 cdaq Target Shift Checklist
4357 03/14/98 22:39 johna HDC1X2 cabling problem.
4356 03/14/98 20:42 cdaq Run 18442: BCM calibration 12C 2pass
4355 03/14/98 20:06 cdaq Run 18441: BCM calibration 4cm 12C 2pass
4353 03/14/98 18:55 cdaq Run 18440: Pi- production w=1.16 4cm 12C 2pass
4354 03/14/98 18:55 Reinhold BCM calibrations
4352 03/14/98 18:53 cdaq Run 18439: Pi- production w=1.16 4cm 12C 2pass
4351 03/14/98 18:16 cdaq Run 18438: Pi- production w=1.16 4cm LH2 2pass
4350 03/14/98 17:36 cdaq Run 18437: Pi- production w=1.16 4cm LH2 2pass
4349 03/14/98 17:35 johna BCM visual display
4348 03/14/98 17:27 cdaq Run 18436: Pi- production w=1.16 4cm LH2 2pass
4347 03/14/98 16:32 koltenuk MCC takes beam
4346 03/14/98 16:21 cdaq Target Shift Checklist
4345 03/14/98 15:59 cdaq Beam Time Accounting
4344 03/14/98 15:57 cdaq Run 18435: Pi- production w=1.16 4cm dummy 2pass
4343 03/14/98 15:27 johna jul98 kinematics file.
4342 03/14/98 15:15 cdaq Run 18434: Pi- production w=1.16 lD2 target 2pass
4341 03/14/98 14:43 cdaq Run 18433: Pi- production w=1.16 lD2 target 2pass
4340 03/14/98 14:33 mack PLEASE. TWO BCM CALIBRATIONS PER WEEK
4339 03/14/98 14:31 Tang BCM Calibration
4338 03/14/98 14:24 cdaq Run 18432: Pi- production w=1.16 lD2 target 2pass
4337 03/14/98 14:04 averys bpm screen
4336 03/14/98 13:26 cdaq Run 18431: Pi- production w=1.16 lD2 target 2pass
4335 03/14/98 12:56 cdaq Run 18430: Pi- production w=1.16 lD2 target 2pass
4334 03/14/98 10:36 cdaq Run 18429: 4cm dummy 2pass
4333 03/14/98 09:51 cdaq Run 18428: Pi- production w=1.6 lD2 target 2pass
4332 03/14/98 08:51 cdaq Run 18427: Pi- production w=1.6 lD2 target 2pass
4331 03/14/98 08:25 dutta shift summary
4330 03/14/98 07:54 cdaq Beam Time Accounting
4329 03/14/98 07:53 cdaq Run 18426: Pi- production w=1.6 lD2 target 2pass
4328 03/14/98 06:51 cdaq Run 18425: Pi- production w=1.6 lD2 target 2pass
4327 03/14/98 05:50 cdaq Run 18424: Pi- production w=1.6 lD2 target 2pass
4326 03/14/98 05:27 gaskell can't do it!
4325 03/14/98 04:57 Cvxwrks BPM screen
4324 03/14/98 04:51 gaskell lots of spare channels...
4323 03/14/98 04:49 gaskell coin ntuples written directly to work
4322 03/14/98 04:49 cdaq Run 18423: Pi- production w=1.6 lD2 target 2pass
4321 03/14/98 03:40 cdaq Run 18422: Pi- production w=1.6 lD2 target 2pass
4320 03/14/98 03:31 cdaq Run 18421: Pi- production w=1.6 lD2 target 2pass
4319 03/14/98 03:19 gaskell dead scintillators
4318 03/14/98 02:17 cdaq Run 18420: Pi- production w=1.6 lD2 target 2pass
4317 03/14/98 02:16 cdaq Run 18419: Pi- production w=1.6 lD2 target 2pass
4316 03/14/98 02:05 cdaq Run 18418: Pi- production w=1.6 lD2 target 2pass
4315 03/14/98 02:03 cdaq Run 18417: Pi- production w=1.6 lD2 target 2pass
4314 03/14/98 01:58 cdaq Run 18416: Pi- production w=1.6 lD2 target 2pass
4313 03/14/98 01:32 cdaq Run 18415: JUNK
4312 03/14/98 00:00 cdaq Beam Time Accounting
Friday
4311 03/13/98 22:56 Cvxwrks BPM screen
4310 03/13/98 22:10 koltenuk SOS trip
4309 03/13/98 22:09 koltenuk MCC takes beam
4308 03/13/98 21:11 cdaq Run 18414: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4307 03/13/98 21:10 koltenuk Q2 trip
4306 03/13/98 20:25 cdaq Run 18413: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4305 03/13/98 19:26 koltenuk HMS dipole trip
4304 03/13/98 19:24 cdaq Run 18412: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4303 03/13/98 18:55 cdaq Run 18411: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4302 03/13/98 17:53 cdaq Run 18410: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4301 03/13/98 17:29 cdaq Beam Time Accounting
4300 03/13/98 17:10 cdaq Run 18409: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4299 03/13/98 17:08 oneill shift checklist
4298 03/13/98 16:58 Cvxwrks BPM screen
4297 03/13/98 16:35 cdaq Run 18408: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4296 03/13/98 16:23 cdaq Run 18407: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4295 03/13/98 16:21 johna hdc1x2 drifttime problem
4294 03/13/98 16:08 johna Spikes in paw ntuples.
4293 03/13/98 16:06 cdaq Target Shift Checklist
4292 03/13/98 16:01 saw Shift summary
4291 03/13/98 16:00 cdaq Beam Time Accounting
4290 03/13/98 15:45 cdaq Run 18406: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4289 03/13/98 15:31 averys target encoder for z=0
4288 03/13/98 15:19 cdaq Run 18405: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4287 03/13/98 14:56 cdaq Run 18404: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4286 03/13/98 14:47 cdaq Run 18403: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4285 03/13/98 14:40 Reinhold beam current on dummy
4284 03/13/98 14:18 cdaq Run 18402: Pi+ production w=1.6 C12 (C4, z=0) 2pass
4283 03/13/98 14:02 cdaq Run 18401: Pi+ production w=1.6 4cm dummy 2pass
4282 03/13/98 13:47 cdaq Run 18400: Pi+ production w=1.6 4cm dummy 2pass
4281 03/13/98 13:09 johna Change of drift chamber timing
4280 03/13/98 11:58 saw Beam down
4279 03/13/98 11:55 Reinhold New gscalers.param.18316
4278 03/13/98 11:54 saw DAQ sync error run 18398
4277 03/13/98 11:18 cdaq Run 18399: Pi+ production w=1.6 4cm dummy 2pass
4276 03/13/98 10:43 cdaq Run 18398: Pi+ production w=1.6 4cm dummy 2pass
4275 03/13/98 10:39 cdaq Run 18397: Pi+ production w=1.6 4cm dummy 2pass
4274 03/13/98 10:31 saw Dummy run
4273 03/13/98 08:51 cdaq Run 18396: Pi+ production w=1.6 LD 2pass
4272 03/13/98 08:15 Reinhold Comment: Shift report
4271 03/13/98 08:01 gaskell Shift Report
4270 03/13/98 08:01 cdaq Beam Time Accounting
4269 03/13/98 07:44 cdaq Run 18395: Pi+ production w=1.6 LD 2pass
4268 03/13/98 07:36 cdaq Target Shift Checklist
4267 03/13/98 07:34 cdaq Run 18394: Pi+ production w=1.6 LD 2pass
4266 03/13/98 07:32 gaskell RunControl funny business
4265 03/13/98 07:27 cdaq Run 18393: Pi+ production w=1.6 LD 2pass
4264 03/13/98 07:07 gaskell BPM screen
4263 03/13/98 07:05 gaskell ntuples and histos moved to work disk
4262 03/13/98 06:45 gaskell Physicists in the mist:the sequel
4261 03/13/98 06:34 cdaq Run 18392: Pi+ production w=1.6 LD 2pass
4260 03/13/98 06:09 cdaq Run 18391: Pi+ production w=1.6 LD 2pass
4259 03/13/98 04:04 gaskell changed Helium bottle
4258 03/13/98 03:12 gaskell update
4257 03/13/98 02:04 cdaq Run 18390: Pi+ production w=1.6 LD 2pass
4256 03/13/98 02:03 cdaq Run 18389: Pi+ production w=1.6 LD 2pass
4255 03/13/98 01:51 cdaq Run 18388: Pi+ production w=1.6 LD 2pass
4254 03/13/98 01:28 gaskell Q3 trip
4253 03/13/98 00:58 gaskell Runs 18380-18386 are H2 Pi+
4252 03/13/98 00:51 cdaq Run 18387: Pi+ production w=1.6 LD 2pass
4250 03/13/98 00:27 cdaq Run 18386: ps1=120 ps2=8000 ps3=1
4251 03/13/98 00:27 gaskell changed hms thresholds
Thursday
4248 03/12/98 23:56 cdaq Beam Time Accounting
4249 03/12/98 23:55 baker Shift Report
4247 03/12/98 23:51 cdaq Target Shift Checklist
4246 03/12/98 23:46 cdaq Run 18385: ps1=120 ps2=8000 ps3=1
4245 03/12/98 23:25 gaskell W=1.16 GeV Phase Space
4244 03/12/98 22:49 cdaq Run 18384: ps1=120 ps2=8000 ps3=1
4243 03/12/98 22:33 cdaq Run 18383: ps1=120 ps2=8000 ps3=1
4242 03/12/98 22:21 cdaq Run 18382: ps1=120 ps2=8000 ps3=1
4241 03/12/98 21:43 cdaq Run 18381: ps1=60 ps2=4000 ps3=1 first try at beam after maintenance day. 25 microamps of beam
4240 03/12/98 21:27 cdaq Run 18380: ps1=20 ps2=40 ps3=1 first try at beam after maintenance day. 10 microamps of beam
4239 03/12/98 16:14 saw Shift report
4238 03/12/98 16:12 cdaq Beam Time Accounting
4237 03/12/98 13:55 gaskell target temp camera
4236 03/12/98 13:00 Mack ethane bottle changes
4235 03/12/98 12:44 gaskell replaced ethane bottle
4234 03/12/98 11:23 oneill Ethane running low
4233 03/12/98 10:20 saw Target Checklist to elog restored
4232 03/12/98 10:06 cdaq Target Shift Checklist
4231 03/12/98 09:32 oneill HMS scint HV trip
4230 03/12/98 08:12 ddutta shift report
4229 03/12/98 00:13 baker shift summary
Wednesday
4228 03/11/98 21:41 gaskell Restored HMS trigger to electron
4227 03/11/98 20:33 Reinhold ups!
4226 03/11/98 19:46 Reinhold F...!
4225 03/11/98 19:40 Reinhold missing mass acceptance
4224 03/11/98 19:30 johna paw output for online replay
4223 03/11/98 16:46 johna Trigger change for cosmics run
4222 03/11/98 15:36 cdaq Run 18379: Cosmic ray test run, ps1=1,ps2=1,ps3=1,ps4=1
4221 03/11/98 15:11 beaufait aux heater controle target heaters
4220 03/11/98 14:29 mack Old arc energy measurements: letter to students
4219 03/11/98 14:21 saw Radiation Area boundary
4218 03/11/98 12:17 Lassiter Carriage Rotation controls
4217 03/11/98 12:06 Lassiter do not rotate HMS !!!
4216 03/11/98 10:58 averys dipole trip problem.
4215 03/11/98 10:48 averys hms dipole tripped
4214 03/11/98 06:17 ddutta shift checklist
4213 03/11/98 00:11 baker Physicists in the Mist!
Tuesday
4212 03/10/98 23:45 gaskell shift checklist
4211 03/10/98 15:49 Mack SOS ytarget reconstruction problem
4210 03/10/98 12:14 Volmer ARC beam energy measurement
4209 03/10/98 10:52 Mack Pre-Fpi arc energy errors. PRELIMINARY
4208 03/10/98 07:05 Cha shift checklist
4207 03/10/98 06:55 Ddutta Shift summary
4206 03/10/98 06:48 cdaq Beam Time Accounting
4205 03/10/98 06:43 H. Anklin BCM ratios cont.
4204 03/10/98 06:39 H. Anklin BCM ratios
4203 03/10/98 06:24 cdaq Run 18378: Pion coincidence data on Dummy, 20 muA
4201 03/10/98 05:49 cdaq Run 18377: Pion coincidence data on LD2, 25 muA
4202 03/10/98 05:49 Zihlmann dac problems
4200 03/10/98 05:39 cdaq Run 18376: Pion coincidence data on LD2, 25 muA
4199 03/10/98 05:27 cdaq Run 18375: Pion coincidence data on LD2, 25 muA
4198 03/10/98 05:10 Anklin BCM drifts and paper chart
4197 03/10/98 04:44 cdaq Run 18374: Pion coincidence data on LD2, 25 muA
4196 03/10/98 03:56 cdaq Run 18373: Pion coincidence data on LD2, 25 muA
4195 03/10/98 03:36 cdaq Run 18372: Pion coincidence data on LD2, 25 muA
4194 03/10/98 03:17 Zihlmann HMS Q2 trip
4193 03/10/98 03:10 Tadevosyan The BCM1/BCM2 ratio for Runs #18348-18366
4192 03/10/98 03:03 Tadevosyan BCM1/BCM2 for Runs # 18348 -- 18366
4191 03/10/98 02:58 Zihlmann dac crash
4190 03/10/98 02:56 cdaq Run 18371: Pion coincidence data on LD2, 25 muA
4189 03/10/98 02:42 cdaq Run 18370: Pion coincidence data on LD2, 25 muA
4188 03/10/98 02:20 cdaq Run 18369: Pion coincidence data on LD2, 25 muA
4187 03/10/98 01:54 V.Tadevosyan BCM1/BCM2 ratios for runs #18348-18366
4186 03/10/98 01:44 cdaq Run 18368: Pion coincidence data on LH2, 25 muA
4185 03/10/98 00:14 cdaq Run 18367: Pion coincidence data on LH2, 25 muA
4184 03/10/98 00:04 Volmer Shift Summary
Monday
4183 03/09/98 23:59 cdaq Beam Time Accounting
4182 03/09/98 23:33 cdaq Run 18366: Pion coincidence data on LH2, 25 muA
4181 03/09/98 22:56 cdaq Run 18365: Pion coincidence data on dummy, 25 muA
4180 03/09/98 22:52 cdaq Run 18364: Pion coincidence data on dummy, prescaler test, 25 muA
4179 03/09/98 22:40 Volmer ARC measurement postponed
4178 03/09/98 22:19 cdaq Run 18363: Pion coincidence data on LH2, 25 muA
4177 03/09/98 21:39 cdaq Run 18362: Pion coincidence data on LH2, 25 muA
4176 03/09/98 20:44 cdaq Run 18361: Pion coincidence data on LH2, 25 muA
4175 03/09/98 20:07 cdaq Run 18360: Pion coincidence data on D
4174 03/09/98 19:56 J. Arrington Additinal missing HMS scalers
4173 03/09/98 19:53 J. Arrington HMS hEL30 scaler change
4172 03/09/98 19:48 cdaq Run 18359: Pion coincidence data on D
4171 03/09/98 19:25 cdaq Run 18358: Pion coincidence data on D
4170 03/09/98 18:39 cdaq Run 18357: Pion coincidence data on D
4169 03/09/98 18:38 Volmer Run 18356: beam position jumped around
4168 03/09/98 18:34 Pat BPM medm screen
4167 03/09/98 18:29 cdaq Run 18356: Pion coincidence data on D
4166 03/09/98 18:02 cdaq Run 18355: Pion coincidence data on D
4165 03/09/98 17:45 cdaq Run 18354: Pion coincidence data on D
4164 03/09/98 17:22 cdaq Run 18353: Pion coincidence data on D
4163 03/09/98 16:15 Geesaman Shift Summary
4162 03/09/98 16:13 cdaq Run 18352: Pion coincidence data on D
4161 03/09/98 16:13 Volmer changed Ar bottle
4160 03/09/98 16:07 cdaq Beam Time Accounting
4159 03/09/98 16:06 cdaq Run 18351: Pion coincidence data on D
4158 03/09/98 15:49 cdaq Run 18350: Pion coincidence data on D
4157 03/09/98 15:46 cdaq Run 18349: Pion coincidence data on D
4156 03/09/98 14:53 cdaq Run 18348: Pion coincidence data on H
4155 03/09/98 14:40 cdaq Run 18347: Pion coincidence data on H
4154 03/09/98 13:16 Cha Scaler analysis of target luminosity dependence
4153 03/09/98 13:03 H. Anklin BCM1/BCM2 for the whole experiment
4152 03/09/98 12:58 J. Arrington SOS trigger change
4151 03/09/98 12:50 J. Arrington HMS SOS angles and momenta
4150 03/09/98 12:00 H. Anklin BCM offsets and gains compared to recent calibration
4149 03/09/98 11:34 cdaq Run 18346: Luminosity scan, 4cm LD2; 50muA, FR 1.5mm
4147 03/09/98 11:10 H. Anklin BCM calibration analysis plots
4146 03/09/98 11:10 cdaq Run 18345: Luminosity scan, 4cm LD2; 40muA, FR 1.5mm
4148 03/09/98 11:10 H. Anklin BCM calibration analysis plots cont.
4145 03/09/98 11:08 H. Anklin BCM Calibration analysis (run: 18316)
4144 03/09/98 10:36 cdaq Run 18344: Luminosity scan, 4cm LD2; 30muA, FR 1.5mm
4143 03/09/98 10:21 H. Anklin DAQ failure
4142 03/09/98 10:07 cdaq Run 18343: Luminosity scan, 4cm LD2; 10 muA, FR 1.5mm
4141 03/09/98 09:55 cdaq Run 18342: Luminosity scan, 4cm LH2, 19 deg; 50 muA, FR 1.5mm
4140 03/09/98 09:23 cdaq Run 18341: Luminosity scan, 4cm LH2, 19 deg,0 muA, FR 1.5mm
4139 03/09/98 08:51 cdaq Run 18340: Luminosity scan, 4cm LH2, 50 muA, FR 1.5mm
4138 03/09/98 08:24 cdaq Run 18339: Luminosity scan, 4cm LH2, 40 muA, FR 1.5mm
4137 03/09/98 08:13 ddutta shift report
4136 03/09/98 07:58 cdaq Beam Time Accounting
4135 03/09/98 07:57 H. Anklin Shift Check list and Argon pressure
4134 03/09/98 07:57 cdaq Run 18338: Luminosity scan, 4cm LH2, 30 muA, FR 1.5mm
4133 03/09/98 07:45 ddutta lD2 runs marked as lH2
4132 03/09/98 07:41 H. Anklin He-flow
4131 03/09/98 07:29 cdaq Run 18337: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4130 03/09/98 07:10 H. Anklin BPM medm screen
4129 03/09/98 07:07 cdaq Run 18336: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4128 03/09/98 06:38 cdaq Run 18335: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4127 03/09/98 06:36 ddutta HMS hodo high voltage
4126 03/09/98 03:39 cdaq Run 18334: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4125 03/09/98 02:57 cdaq Run 18333: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4124 03/09/98 02:33 cdaq Run 18332: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4123 03/09/98 02:28 cdaq Run 18331: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4122 03/09/98 01:51 cdaq Run 18330: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4121 03/09/98 01:16 cdaq Run 18329: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4120 03/09/98 01:05 cdaq Run 18328: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4119 03/09/98 00:36 cdaq Beam Time Accounting
4118 03/09/98 00:27 cdaq Run 18327: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
4117 03/09/98 00:24 tadevosyan target lifting offset.
4116 03/09/98 00:05 cdaq Run 18326: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
Sunday
4115 03/08/98 23:39 cdaq Run 18325: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
4114 03/08/98 23:37 Volmer cleared data disk 2
4113 03/08/98 23:19 cdaq Run 18324: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
4112 03/08/98 23:14 cdaq Run 18323: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
4111 03/08/98 23:08 cdaq Run 18322: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
4110 03/08/98 22:44 cdaq Run 18321: FR mystery take 3, FR .5mm
4109 03/08/98 22:39 cdaq Run 18320: FR mystery take 2, FR 1mm
4108 03/08/98 22:28 gaskell harp scan: fast raster on
4107 03/08/98 22:13 cdaq Run 18319: FR mystery
4106 03/08/98 22:06 cdaq Run 18318: Run during Harp Scan, FR on?
4105 03/08/98 21:21 Cuevas Target Fast Raster
4104 03/08/98 20:35 ent SOS ytarget reconstruction
4103 03/08/98 20:02 gaskell harp scans
4102 03/08/98 19:28 cdaq Run 18317: Run during Harp Scan
4101 03/08/98 18:45 Dunne Targets
4100 03/08/98 17:28 Volmer HMS DC1x2 drift time problem
4099 03/08/98 17:24 Volmer BCM calibration
4098 03/08/98 16:55 cdaq Run 18316: BCM calibration, for real this time.
4097 03/08/98 16:49 cdaq Run 18315: BCM calib
4096 03/08/98 16:30 cdaq Run 18314: Short singles run to check spectrometers after beam
4095 03/08/98 16:24 Geesaman Shift Summary
4094 03/08/98 16:13 cdaq Run 18313: Short singles run to check spectrometers after beam
4093 03/08/98 16:03 cdaq Beam Time Accounting
4092 03/08/98 15:58 cdaq Run 18312: Short singles run to check spectrometers after beam
4091 03/08/98 15:56 gaskell sos and hms thresholds
4090 03/08/98 15:49 cdaq Run 18311: Short singles run to check spectrometers after beam
4089 03/08/98 15:42 cdaq Run 18310: Short singles run to check spectrometers after beam
4088 03/08/98 15:37 cdaq Run 18309: Short singles run to check spectrometers after beam
4087 03/08/98 15:29 cdaq Run 18308: Short singles run to check spectrometers after beam
4086 03/08/98 15:26 cdaq Run 18307: Short singles run to check spectrometers after beam
4085 03/08/98 15:11 Geesaman Ready for beam
4084 03/08/98 15:04 Dunne Target Warm Encoder Positions
4083 03/08/98 13:57 Geesaman SOS angle limit switch moved,
4082 03/08/98 12:54 dmckee Shift checklist
4081 03/08/98 11:14 Reinhold DON'T FORGET TO LOG THE BPM SCREEN
4080 03/08/98 10:09 GEESAMAN Sweep
4079 03/08/98 08:51 cdaq Run 18306: production running 10 muA, target 12C z=0cm
4078 03/08/98 08:25 zihlmann warm target positions
4077 03/08/98 08:18 cdaq Beam Time Accounting
4076 03/08/98 08:07 GEESAMAN Reboot HMS Q3 controller
4075 03/08/98 08:04 GEESAMAN HMS Q3 trip
4074 03/08/98 07:27 cdaq Run 18305: production running 20 muA, target 12C z=0cm
4073 03/08/98 07:23 cdaq Run 18304: production running 10 muA, target 12C z=0cm
4072 03/08/98 07:15 cdaq Run 18303: production running 10 muA, target 12C z=0cm
4071 03/08/98 06:58 cdaq Run 18302: sieve slit, 20 muA, target 12C z=-6cm
4070 03/08/98 06:35 averys sos limit switch
4069 03/08/98 03:53 cdaq Run 18301: sieve slit, 20 muA, target 12C z=-6cm
4068 03/08/98 03:42 cdaq Run 18300: sieve slit, 20 muA, target 12C z=+6cm
4067 03/08/98 03:33 cdaq Run 18299: sieve slit, 20 muA, target 12C z=+4cm
4066 03/08/98 03:22 cdaq Run 18298: sieve slit, 20 muA, target 12C z=0cm
4065 03/08/98 02:36 cdaq Run 18297: sieve slit, 20 muA, target 12C z=0cm
4064 03/08/98 02:27 cdaq Run 18296: sieve slit, 20 muA, target 12C z=+4cm
4063 03/08/98 02:17 cdaq Run 18295: sieve slit, 20 muA, target 12C z=+6cm
4062 03/08/98 02:03 cdaq Run 18294: sieve slit, 20 muA, target 12C z=-6cm
4061 03/08/98 01:55 cdaq Run 18293: sieve slit, 20 muA, target 12C z=-4cm
4060 03/08/98 01:53 cdaq Run 18292: sieve slit, 20 muA, target 12C z=-4cm
4059 03/08/98 01:31 cdaq Run 18291: sieve slit, 20 muA, target 12C z=-4cm
4057 03/08/98 00:32 cdaq Run 18290: sieve slit, 10 muA, target 12C z=+0cm
4058 03/08/98 00:31 Volmer Shift Summary
4056 03/08/98 00:29 Volmer new Fast Raster policy
4055 03/08/98 00:18 cdaq Run 18289: HMS only electron singles, sieve slit, 10 muA, target 12C z=+6cm
4054 03/08/98 00:07 cdaq Beam Time Accounting
4053 03/08/98 00:02 cdaq Run 18288: HMS SOS electron singles, sieve slits, 20 muA, target 12C z=+4cm
Saturday
4052 03/07/98 23:46 Reinhold D2 tank colt trap refilled
4051 03/07/98 23:44 ZIHLMANN HMS SLIT PROBLEM
4050 03/07/98 23:30 cdaq Run 18287: HMS only electron singles, sieve slit, 10 muA, target 12C z=+4cm
4049 03/07/98 23:12 cdaq Run 18286: HMS only electron singles, sieve slit, 10 muA, target 12C z=-4cm
4048 03/07/98 22:55 cdaq Run 18285: HMS only electron singles, sieve slit, 10 muA, target 12C z=-6 cm
4047 03/07/98 22:53 Reinhold Runplan
4046 03/07/98 22:52 cdaq Run 18284: HMS only electron singles, sieve slit, 10 muA, target 12C z=-6 cm
4045 03/07/98 22:49 Reinhold Trigger Status
4044 03/07/98 22:46 Reinhold Runplan 3/7-3/8
4043 03/07/98 22:18 cdaq Run 18283: HMS only electron singles, sieve slit, 10 muA, target 12C z=0
4042 03/07/98 21:53 cdaq Run 18282: electron singles, large colls, 10 muA, target 12C z=0
4041 03/07/98 21:47 cdaq Run 18281: electron singles, large colls, 10 muA, target 12C z=0
4040 03/07/98 18:18 Lassiter SOS rotation problem
4039 03/07/98 17:27 gueye Superharp BLMs high voltage
4038 03/07/98 16:04 geesaman Shift Summary Day Shift 7 March
4037 03/07/98 15:54 geesaman Change SOS and HMS trigger
4036 03/07/98 15:12 geesaman Ready to Close up Hall
4035 03/07/98 09:38 cdaq Run 18280: cosmics run
4034 03/07/98 09:06 Bryon Shift check list
Friday
4033 03/06/98 21:30 Volmer Shift Summary
4032 03/06/98 21:18 ent beam dump line o.k. again
4031 03/06/98 16:48 bryon fixed a second base in HMS hodoscope plane
4030 03/06/98 16:14 cdaq Run 18279: cosmics run
4029 03/06/98 14:57 cdaq Run 18278: cosmics run
4028 03/06/98 14:19 ent beam dump line still leaks
4027 03/06/98 13:36 beaufait drift chamber hot channel
4026 03/06/98 11:22 saw et al HMS WC fix
4025 03/06/98 11:12 bryon HMS Scintillator base fixed, may have a broken glue joint
4024 03/06/98 11:09 cdaq Run 18277: cosmics run
4023 03/06/98 11:03 cdaq Run 18276: cosmics run
4022 03/06/98 10:50 cdaq Run 18275: cosmic run again
4021 03/06/98 10:28 cdaq Run 18274: cosmics run
4020 03/06/98 10:23 cdaq Run 18273: DAQ restoration test. PMT's on. WC's off.
4019 03/06/98 09:57 cdaq Run 18272: cosmics run.
4018 03/06/98 09:12 cdaq Run 18271: DAQ restoration test. PMT's on. Cosmic Rays Run.
4017 03/06/98 09:06 cdaq Run 18270: DAQ restoration test. PMT's on. Cosmic Rays Run.
4016 03/06/98 08:33 gaskell shift checklist
4015 03/06/98 08:25 cdaq Run 18269: DAQ restoration test. PMT's on. Cosmic Rays Run.
4014 03/06/98 04:09 gabriel Beam pipe purging
4013 03/06/98 01:31 gaskell Re-zeroed HMS hall probes
4012 03/06/98 00:39 gaskell hms quad hall probes
Thursday
4011 03/05/98 23:40 Ketevi Helium leak
4010 03/05/98 17:23 cdaq Run 18268: DAQ restoration test. PMT's on.
4009 03/05/98 16:07 Lassiter SOS small angles
4008 03/05/98 15:47 cdaq Run 18267: Cosmic run. All detector on. 2/4 in HMS only
4007 03/05/98 15:32 Bryon SOS Cerenkov Mirror positions
4006 03/05/98 15:31 cdaq Run 18266: Cosmic run. All detector on. 2/4 in HMS only
4005 03/05/98 15:22 cdaq Run 18265: Cosmic run. All detector on. 2/4 in HMS only
4004 03/05/98 14:44 cdaq Run 18264: Cosmic run. All detector on. 2/4 in HMS only
4003 03/05/98 13:18 Vulcan Gaussmeter
4002 03/05/98 12:46 cdaq Run 18263: Cosmic run. All detector on. 2/4 in HMS and SOS.
4001 03/05/98 12:08 cdaq Run 18262: Cosmic run. All detector on. 2/4 in HMS and SOS.
4000 03/05/98 11:57 saw ROC 4 (SOS WC) gate cable replacement
3999 03/05/98 11:50 cdaq Run 18261: SOS WC (ROC4) gate test.
3998 03/05/98 11:39 cdaq Run 18260: SOS WC (ROC4) gate test.
3997 03/05/98 11:04 mack WC gas inventory
3996 03/05/98 10:14 gaskell SOS HV and SOS scin
3995 03/05/98 09:32 bryon SOS HV problems
Wednesday
3994 03/04/98 23:58 cdaq Run 18259: Cosmic run to look for single pe peak in HMS Cerenkov. All HMS detectors except for the WC turned on. All magnets
3993 03/04/98 23:56 bryon SOS HV problems
3992 03/04/98 23:16 cdaq Run 18258: Cosmic run to look for single pe peak in SOS and HMS
3991 03/04/98 23:13 dmckee Shift checklist
3990 03/04/98 18:53 bryon Changed HMS thresholds file
3989 03/04/98 18:52 cdaq Run 18257: Cosmic run to look for single pe peak in SOS and HMS
3988 03/04/98 18:39 cdaq Run 18256: Cosmic run to look for single pe peak in SOS and HMS
3987 03/04/98 18:13 Bryon More SOS Cerenkov Results
3986 03/04/98 16:40 Potterveld HMS dipole NMR
3985 03/04/98 16:35 bryon more cosmic results
3984 03/04/98 16:12 Potterveld SOS DC1 problems
3983 03/04/98 15:24 Mack let's replace the cable
3982 03/04/98 14:42 cdaq Run 18255: Quick, dirty Cosmic run. All detectors turned on. All
3981 03/04/98 14:28 bryon SOS Cerenkov Calibrations
3980 03/04/98 13:53 saw Target data in epicsLogger event
3979 03/04/98 11:30 Cdaq Raster Epics variables
3978 03/04/98 11:05 bryon results from the Cosmic runs
3977 03/04/98 10:42 cdaq Run 18254: Cosmic run. All detectors turned on. All magnets
3976 03/04/98 09:52 Mack New FR epics variable names.
Tuesday
3975 03/03/98 22:08 dmckee Shift checklists 3/2 - 3/3
3974 03/03/98 21:25 Ioana another shift checklist
3973 03/03/98 19:56 bryon More Cosmics
3972 03/03/98 19:53 cdaq Run 18253: Cosmic run. All detectors but WC urned on. All magnets
3971 03/03/98 19:03 Bryon Cosmic run
3970 03/03/98 18:55 cdaq Run 18252: Cosmic run. All detectors turned on. All magnets off.
3969 03/03/98 16:59 saw Shift checklist
3968 03/03/98 16:44 saw DAQ restored
3967 03/03/98 16:42 cdaq Run 18251: DAQ restoration test. PMT's on. WC's off.
3966 03/03/98 16:27 saw More DAQ trouble and question for run coordinator
3965 03/03/98 15:42 cdaq Run 18250: SFI DAQ tests
3964 03/03/98 15:20 saw DAQ problem (vmec7 not booting)
3963 03/03/98 15:17 cdaq Run 18249: SFI DAQ tests
3962 03/03/98 15:16 Potterveld SOS quad hall probe history
3961 03/03/98 15:11 cdaq Run 18248: SFI DAQ tests
3960 03/03/98 15:09 cdaq Run 18247: SFI DAQ tests
3959 03/03/98 11:51 bryon Returned SOS trigger and turned off SOS Cerenkov HV
3958 03/03/98 10:47 cdaq Run 18246: SOS Cerenkov cosmic test
3957 03/03/98 10:24 cdaq Run 18245: SOS Cerenkov LED test
3956 03/03/98 10:19 cdaq Run 18244: SOS Cerenkov LED test
3955 03/03/98 10:16 cdaq Run 18243: SOS Cerenkov LED test
3954 03/03/98 10:11 cdaq Run 18242: SOS Cerenkov LED test
3953 03/03/98 10:00 cdaq Run 18241: SOS Cerenkov LED test
3952 03/03/98 09:52 cdaq Run 18240: SOS Cerenkov LED test
3951 03/03/98 08:32 gaskell shift checklist
Monday
3950 03/02/98 23:12 dmckee Shift checklist, HMS fridge thermometer
3949 03/02/98 23:02 bryon SOS Cerenkov HV on, Trigger changed
3948 03/02/98 21:45 cdaq Run 18239: SOS Cerenkov LED test
3947 03/02/98 21:38 cdaq Run 18238: SOS Cerenkov LED test
3946 03/02/98 20:05 cdaq Run 18237: SOS Cerenkov LED test
3945 03/02/98 19:52 cdaq Run 18236: SOS Cerenkov LED test
3944 03/02/98 19:41 cdaq Run 18235: SOS Cerenkov LED test
3943 03/02/98 18:18 Bryon Changed sos_thresholds.dat
3942 03/02/98 17:27 Bryon shift check list
3941 03/02/98 16:58 J. Volmer did checklist (gas)
3940 03/02/98 15:09 Reinhold target survey 1/30 & 2/25
3939 03/02/98 09:00 gaskell shift checklist
Sunday
3938 03/01/98 22:32 dmckee Shift Checklists
3937 03/01/98 21:57 Volmer shift checklist continuity