Jefferson Lab HALL C Logbook for March 98 - full listing

  • Main INDEX

    Tuesday

  • 5201 03/31/98 23:49 cdaq Beam Time Accounting
  • 5200 03/31/98 22:54 koltenuk HMS scin S2X S2Y HV die again
  • 5199 03/31/98 16:35 cdaq Run 18924: HMS DAQ CHECKOUT at 1-pass, magnets are ramping
  • 5198 03/31/98 16:20 cdaq Run 18923: HMS DAQ CHECKOUT at 1-pass, magnets are ramping
  • 5197 03/31/98 16:12 cdaq Beam Time Accounting
  • 5196 03/31/98 12:25 mack gas inventory
  • 5195 03/31/98 12:23 mack trouble-shooting hms crate 1 (S2) problem
  • 5194 03/31/98 12:12 gaskell HMS scin stuff
  • 5193 03/31/98 12:00 cdaq Run 18922: HMS CHECKOUT TRIGGER=1/4
  • 5192 03/31/98 11:23 gaskell fixed SOS SY6+
  • 5191 03/31/98 10:01 cdaq Run 18921: SOS CHECKOUT TRIGGER=2/4
  • 5190 03/31/98 09:55 cdaq Run 18920: SOS CHECKOUT TRIGGER=1/4
  • 5189 03/31/98 09:53 cdaq Run 18919: SOS CHECKOUT TRIGGER=1/4
  • 5188 03/31/98 08:44 Lung Magnets, HV off
  • 5187 03/31/98 07:06 cdaq Target Shift Checklist
  • 5186 03/31/98 07:00 zihlmann owl shift(again)
  • 5185 03/31/98 07:00 cdaq Beam Time Accounting
  • 5184 03/31/98 06:31 cdaq Run 18918: 3He(e,e') luminosity scan 20A
  • 5183 03/31/98 06:17 cdaq Run 18917: 3He(e,e') luminosity scan 40uA
  • 5182 03/31/98 06:07 cdaq Run 18916: 3He(e,e') luminosity scan 49uA
  • 5181 03/31/98 06:02 cdaq Run 18915: 3He(e,e') luminosity scan 49uA
  • 5180 03/31/98 05:25 cdaq Run 18914: 3He(e,e') luminosity scan 49uA
  • 5179 03/31/98 04:56 cdaq Run 18913: 3He(e,e') luminosity scan
  • 5178 03/31/98 04:07 cdaq Run 18912: 3He(e,e') luminosity scan
  • 5177 03/31/98 04:03 cdaq Run 18911: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5176 03/31/98 03:38 cdaq Run 18910: BCM calibration
  • 5175 03/31/98 03:20 cdaq Run 18909: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5174 03/31/98 02:39 cdaq Run 18908: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5173 03/31/98 02:28 cdaq Run 18907: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5172 03/31/98 02:18 cdaq Run 18906: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5171 03/31/98 01:58 Averys changed He bottle
  • 5170 03/31/98 01:43 danagoulian BPM screen
  • 5169 03/31/98 01:37 cdaq Run 18905: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5168 03/31/98 01:18 cdaq Run 18904: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5167 03/31/98 00:54 cdaq Run 18903: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5166 03/31/98 00:31 cdaq Run 18902: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5165 03/31/98 00:29 cdaq Run 18901: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5164 03/31/98 00:26 cdaq Run 18900: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5163 03/31/98 00:23 danagoulian s2y6+ HV problem
  • 5162 03/31/98 00:16 cdaq Run 18899: 3He(e,e') PI+ w=1.6 ebeam=3.245
  • 5161 03/31/98 00:03 cdaq Beam Time Accounting
  • 5160 03/31/98 00:00 Bryon Shift summary
  • Monday

  • 5159 03/30/98 23:59 Cdaq Beam energy measurement
  • 5158 03/30/98 23:37 Cdaq finished PI- 3.245 W=1.6 point
  • 5157 03/30/98 22:39 cdaq Run 18898: dummy PI- w=1.6 ebeam=3.245
  • 5156 03/30/98 22:09 cdaq Run 18897: 3He(e,e') PI- w=1.6 ebeam=3.245
  • 5155 03/30/98 21:44 cdaq Run 18896: 3He(e,e') PI- w=1.6 ebeam=3.245
  • 5154 03/30/98 21:07 cdaq Run 18895: 3He(e,e') PI- w=1.6 ebeam=3.245
  • 5153 03/30/98 20:21 cdaq Run 18894: 3He(e,e') PI-
  • 5152 03/30/98 20:13 Cdaq shift check list
  • 5151 03/30/98 19:58 cdaq Run 18893: 3He(e,e') PI-
  • 5150 03/30/98 19:53 koltenuk Run 18890 is not JUNK
  • 5149 03/30/98 19:49 koltenuk DAQ problem, Run 18892 could be junk
  • 5148 03/30/98 19:23 cdaq Run 18892: 3He(e,e') PI-
  • 5147 03/30/98 19:12 gaskell bpms
  • 5146 03/30/98 18:58 cdaq Run 18891: 3He(e,e') PI-
  • 5145 03/30/98 18:55 cdaq Run 18890: Junk TEST RUN. beam on.
  • 5144 03/30/98 18:51 cdaq Run 18889: Junk TEST RUN. beam on.
  • 5143 03/30/98 18:29 cdaq Run 18888: TEST RUN BEAM NOT READY.
  • 5142 03/30/98 17:10 Bryon Changed Ethane flow valve.
  • 5141 03/30/98 16:54 cdaq Run 18887: DAQ test run - junk
  • 5140 03/30/98 16:30 cdaq Run 18886: DAQ test run - junk
  • 5139 03/30/98 16:06 cdaq Target Shift Checklist
  • 5138 03/30/98 16:03 cdaq Beam Time Accounting
  • 5137 03/30/98 16:01 Lung HMS/SOS ready for 4-pass beam
  • 5136 03/30/98 14:37 Lung Request energy change
  • 5135 03/30/98 14:11 cdaq Run 18885: 3He(e,e') elastic calibration run
  • 5134 03/30/98 13:49 cdaq Run 18884: 3He(e,e') elastic calibration run
  • 5133 03/30/98 13:45 cdaq Run 18883: 3He(e,e') elastic calibration run
  • 5132 03/30/98 13:38 cdaq Run 18882: 3He(e,e') elastic calibration run
  • 5131 03/30/98 13:19 Lung Correction to header for #18879
  • 5130 03/30/98 13:17 cdaq Run 18881: 3He(e,e') elastic calibration run
  • 5129 03/30/98 13:13 cdaq Run 18880: 3He(e,e') elastic calibration run
  • 5128 03/30/98 13:09 cdaq Run 18879: 3He(e,e') elastic calibration run
  • 5127 03/30/98 12:33 cdaq Run 18878: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5126 03/30/98 11:45 H. Anklin BCM1/2 ratio
  • 5125 03/30/98 11:40 Lung Beam position
  • 5124 03/30/98 11:35 Lung HMS Hodo trip again
  • 5123 03/30/98 11:31 cdaq Run 18877: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5122 03/30/98 11:24 Lung HMS/SOS Trigger Status
  • 5121 03/30/98 10:59 cdaq Run 18876: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5120 03/30/98 10:39 gaskell BPM screen
  • 5119 03/30/98 10:30 cdaq Run 18875: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5118 03/30/98 09:56 Wood Beam Time accounting
  • 5117 03/30/98 09:34 cdaq Run 18874: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5116 03/30/98 09:31 gaskell Runs 18871-3 are junk
  • 5115 03/30/98 09:10 cdaq Run 18873: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5114 03/30/98 09:03 cdaq Run 18872: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5113 03/30/98 09:01 Lung HMS HV Trip
  • 5112 03/30/98 08:59 cdaq Run 18871: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5111 03/30/98 08:44 gaskell W=1.16 GeV sarting w/run 18856
  • 5110 03/30/98 08:43 cdaq Run 18870: W=1.16 GeV ebeam=1.645 3he Pi-plus
  • 5109 03/30/98 07:56 cdaq Beam Time Accounting
  • 5108 03/30/98 07:54 zihlmann owl(eulen) shift
  • 5107 03/30/98 07:40 cdaq Run 18869: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5106 03/30/98 06:43 cdaq Run 18868: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5105 03/30/98 05:43 cdaq BPM medm screen
  • 5104 03/30/98 05:36 cdaq Run 18867: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5103 03/30/98 04:34 cdaq Run 18866: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5102 03/30/98 03:38 cdaq Run 18865: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5101 03/30/98 03:34 zihlmann data disk3 full changed to disk4
  • 5100 03/30/98 03:21 cdaq Run 18864: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5099 03/30/98 03:09 cdaq BPM status
  • 5098 03/30/98 02:20 cdaq Run 18863: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5097 03/30/98 01:54 cdaq Run 18862: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5096 03/30/98 01:14 cdaq Beam Time Accounting
  • 5095 03/30/98 00:53 cdaq Run 18861: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5094 03/30/98 00:49 cdaq Run 18860: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5093 03/30/98 00:48 cdaq Run 18859: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5092 03/30/98 00:44 cdaq Run 18858: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5091 03/30/98 00:40 cdaq Run 18857: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5090 03/30/98 00:35 cdaq Run 18856: W=1.6 GeV ebeam=1.645 3he Pi-plus
  • 5089 03/30/98 00:08 cdaq Run 18855: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5088 03/30/98 00:00 ent runs with lower tracking eff
  • Sunday

  • 5087 03/29/98 23:51 cdaq Target Shift Checklist
  • 5086 03/29/98 23:42 ent shift summary
  • 5085 03/29/98 23:35 cdaq Run 18854: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5084 03/29/98 22:59 cdaq Run 18853: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5083 03/29/98 22:45 cdaq Run 18852: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5082 03/29/98 22:17 cdaq Run 18851: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5081 03/29/98 22:04 danagoulian BPM medm screen
  • 5080 03/29/98 21:51 averys run 18848,18849
  • 5079 03/29/98 21:43 cdaq Run 18850: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5078 03/29/98 21:30 cdaq Run 18849: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5077 03/29/98 21:00 cdaq Run 18848: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5075 03/29/98 20:59 ent runs 18844,18845
  • 5076 03/29/98 20:59 ent gas flow problems
  • 5074 03/29/98 20:48 cdaq Run 18847: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5073 03/29/98 20:46 cdaq Run 18846: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5072 03/29/98 20:00 cdaq Run 18845: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5071 03/29/98 19:14 cdaq Run 18844: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5070 03/29/98 19:12 cdaq Run 18843: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5069 03/29/98 18:13 ent SOS BM02 problem
  • 5068 03/29/98 16:03 cdaq Beam Time Accounting
  • 5067 03/29/98 15:55 gaskell HMS Dipole Craashed
  • 5066 03/29/98 15:28 cdaq Run 18842: W=1.6 GeV ebeam=1.1645 3he Pi-plus
  • 5065 03/29/98 14:59 cdaq Run 18841: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5064 03/29/98 14:54 gaskell Beam Energy=1.644 GeV
  • 5063 03/29/98 13:51 cdaq Run 18840: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5062 03/29/98 13:06 cdaq Run 18839: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5061 03/29/98 12:48 cdaq Run 18838: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5060 03/29/98 12:37 cdaq Run 18837: W=1.6 GeV ebeam=1.1645 3he Pi-plus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5059 03/29/98 12:26 gaskell Beam energy measurement problems
  • 5058 03/29/98 10:29 cdaq Run 18836: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5056 03/29/98 09:50 cdaq Run 18835: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5057 03/29/98 09:50 gaskell HMS S2X and S2Y turned themselves off.
  • 5055 03/29/98 09:02 cdaq Run 18834: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5054 03/29/98 08:07 cdaq Beam Time Accounting
  • 5053 03/29/98 07:59 cdaq Run 18833: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5052 03/29/98 07:22 cdaq beam profile in arc
  • 5051 03/29/98 06:48 cdaq Run 18832: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5050 03/29/98 05:45 cdaq Run 18831: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5049 03/29/98 04:57 cdaq bpm screen
  • 5048 03/29/98 04:44 zihlmann changed from data disk2 to data disk3
  • 5047 03/29/98 04:44 cdaq Run 18830: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5046 03/29/98 04:13 cdaq Run 18829: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5045 03/29/98 03:09 cdaq Run 18828: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5044 03/29/98 02:10 cdaq Run 18827: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5043 03/29/98 01:04 cdaq Run 18826: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5042 03/29/98 00:49 cdaq Run 18825: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • Saturday

  • 5041 03/28/98 23:59 cdaq Beam Time Accounting
  • 5040 03/28/98 23:42 cdaq Run 18824: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5039 03/28/98 22:35 cdaq Run 18823: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5038 03/28/98 22:19 dmckee Shift checklists 3/26 - 3/28
  • 5037 03/28/98 22:09 cdaq BPM screen
  • 5036 03/28/98 21:32 cdaq Run 18822: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5035 03/28/98 20:27 cdaq Run 18821: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5034 03/28/98 19:30 cdaq Run 18820: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=100,ps2=20000,ps3=1,ps4=1
  • 5033 03/28/98 18:32 cdaq Run 18819: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=50,ps2=10000,ps3=1,ps4=1
  • 5032 03/28/98 16:41 cdaq Run 18818: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps1=50,ps2=10000,ps3=1,ps4=1
  • 5031 03/28/98 16:16 cdaq Beam Time Accounting
  • 5030 03/28/98 16:08 cdaq Run 18817: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps1=30,ps2=6000,ps3=1,ps4=1
  • 5029 03/28/98 16:03 cdaq Run 18816: W=1.6 GeV ebeam=1.1645 3he Pi-minus ps1=1200 ps2=6000,ps3=1,ps4=1
  • 5028 03/28/98 14:32 cdaq Run 18815: Production on 3he
  • 5027 03/28/98 14:31 H. Anklin BCM1/BCM2 ratio for all runs
  • 5026 03/28/98 13:46 H. Anklin BCM plots continued
  • 5025 03/28/98 13:46 H. Anklin BCM calibration plots continued
  • 5024 03/28/98 13:45 H. Anklin BCM calibration analysis run: 18797
  • 5023 03/28/98 13:43 gaskell HMS quad hall probe gui dead
  • 5022 03/28/98 13:31 cdaq Run 18814: Production on 3he
  • 5021 03/28/98 12:26 cdaq Run 18813: Production on 3he
  • 5020 03/28/98 11:29 cdaq Run 18812: Production on 3he
  • 5019 03/28/98 10:31 cdaq Run 18811: Production on 3he
  • 5018 03/28/98 09:40 cdaq Run 18810: Production on 3he
  • 5017 03/28/98 09:38 cdaq Run 18809: Production on 3he
  • 5016 03/28/98 08:43 cdaq Run 18808: Production on 3he
  • 5015 03/28/98 08:29 Mharvey HMS Q3 crash
  • 5014 03/28/98 08:21 cdaq Target Shift Checklist
  • 5013 03/28/98 08:08 cdaq Run 18807: Production on 3he
  • 5012 03/28/98 08:05 cdaq Beam Time Accounting
  • 5011 03/28/98 08:04 mharvey bpm screen
  • 5010 03/28/98 07:13 cdaq Run 18806: Production on 3he
  • 5009 03/28/98 06:17 cdaq Run 18805: Production on 3he
  • 5008 03/28/98 05:11 cdaq Run 18804: Production on 3he
  • 5007 03/28/98 04:33 cdaq Run 18803: Production on 3he
  • 5006 03/28/98 04:02 cdaq Run 18802: Production on 3he
  • 5005 03/28/98 03:27 cdaq Run 18801: Production on 3he
  • 5004 03/28/98 02:52 cdaq Run 18800: Production on 3he
  • 5003 03/28/98 02:19 cdaq Run 18799: Production on 3he
  • 5002 03/28/98 01:43 cdaq Run 18798: Production on 3he
  • 5001 03/28/98 01:38 gueye BCM calibration summary
  • 5000 03/28/98 01:09 cdaq Run 18797: BCM CALIBRATION
  • 4999 03/28/98 00:56 gueye BCM calibration - runs 18795-18796
  • 4998 03/28/98 00:55 cdaq Run 18796: BCM CALIBRATION
  • 4997 03/28/98 00:38 gueye BCM calibration
  • 4996 03/28/98 00:36 cdaq Run 18795: BCM CALIBRATION
  • Friday

  • 4995 03/27/98 23:58 cdaq Beam Time Accounting
  • 4994 03/27/98 23:55 cdaq Run 18794: 3he elastic at 40 muA, 18.01 deg
  • 4993 03/27/98 23:51 cdaq Target Shift Checklist
  • 4992 03/27/98 23:39 cdaq Run 18793: 3he elastic at 20 muA, 18.01 deg
  • 4991 03/27/98 23:25 cdaq Run 18792: 3he elastic at 20 muA
  • 4990 03/27/98 23:16 cdaq Run 18791: 3he elastic at 20 muA
  • 4989 03/27/98 23:01 dmckee Preliminary 3He Luminosity scan results
  • 4988 03/27/98 22:23 cdaq Run 18790: luminosity GeV ebeam=1.1645 3 He
  • 4987 03/27/98 22:06 cdaq Run 18789: luminosity GeV ebeam=1.1645 3 He
  • 4986 03/27/98 21:54 cdaq Run 18788: luminosity GeV ebeam=1.1645 3 He
  • 4985 03/27/98 21:49 bpms bpms
  • 4984 03/27/98 21:35 cdaq Run 18787: luminosity GeV ebeam=1.1645 3 He
  • 4983 03/27/98 21:20 ent BPM screen
  • 4982 03/27/98 21:19 cdaq Run 18786: luminosity GeV ebeam=1.1645 3 He
  • 4981 03/27/98 20:58 cdaq Run 18785: luminosity GeV ebeam=1.1645 3 He
  • 4980 03/27/98 20:56 cdaq Run 18784: luminosity GeV ebeam=1.1645 3 He
  • 4979 03/27/98 20:30 cdaq Run 18783: luminosity GeV ebeam=1.1645 3 He
  • 4978 03/27/98 20:25 cdaq Run 18782: luminosity GeV ebeam=1.1645 3 He
  • 4977 03/27/98 20:07 cdaq Run 18781: luminosity GeV ebeam=1.1645 3 He
  • 4976 03/27/98 20:04 cdaq Run 18780: luminosity GeV ebeam=1.1645 3 He
  • 4975 03/27/98 19:58 cdaq Run 18779: luminosity GeV ebeam=1.1645 3 He
  • 4974 03/27/98 19:43 Reinhold for Harp Scan
  • 4973 03/27/98 19:42 cdaq Run 18778: luminosity GeV ebeam=1.1645 3 He
  • 4972 03/27/98 19:28 cdaq Run 18777: luminosity GeV ebeam=1.1645 carbon z=0
  • 4971 03/27/98 17:34 cdaq Run 18776: cosmic test
  • 4970 03/27/98 17:25 cdaq Run 18775: cosmic test
  • 4969 03/27/98 15:34 H. Anklin BCM1/BCM2 for all runs so far
  • 4968 03/27/98 14:46 Cdaq BCM plot cont.
  • 4967 03/27/98 14:45 Cdaq BCM plots cont.
  • 4966 03/27/98 14:44 H. Anklin BCM calibration analysis run 18759
  • 4965 03/27/98 10:23 gaskell replaced helium bottle
  • 4964 03/27/98 08:09 cdaq Beam Time Accounting
  • 4963 03/27/98 03:48 cdaq Run 18773: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4962 03/27/98 03:16 cdaq Run 18772: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4961 03/27/98 03:06 dmckee HMS dipole tripped
  • 4960 03/27/98 02:35 cdaq Run 18771: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4959 03/27/98 02:08 cdaq Run 18770: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4958 03/27/98 01:49 cdaq Run 18769: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4957 03/27/98 01:17 cdaq Run 18768: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4956 03/27/98 01:02 dmckee HMS dipole tripped
  • 4955 03/27/98 00:49 cdaq Run 18767: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4954 03/27/98 00:19 cdaq Run 18766: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4953 03/27/98 00:16 cdaq Run 18765: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4952 03/27/98 00:05 cdaq Run 18764: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4951 03/27/98 00:05 gaskell s2x 6+ (HMS) still acting up
  • Thursday

  • 4950 03/26/98 23:59 cdaq Beam Time Accounting
  • 4949 03/26/98 23:54 cdaq Run 18763: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4948 03/26/98 23:52 cdaq Run 18762: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4947 03/26/98 23:45 cdaq Run 18761: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4946 03/26/98 23:42 cdaq Run 18760: W=1.16 GeV ebeam=1.1645 carbon Pi+ production
  • 4945 03/26/98 20:28 Reinhold Update Run Plan
  • 4944 03/26/98 18:41 gaskell revised run plan
  • 4943 03/26/98 12:53 Reinhold Run Plan March 26
  • 4942 03/26/98 09:07 J. Volmer Luminosity Scan result
  • 4941 03/26/98 08:42 cdaq Beam Time Accounting
  • 4939 03/26/98 08:30 cdaq Run 18759: BCM Calibration
  • 4940 03/26/98 08:30 mharvey BCM Calibration
  • 4938 03/26/98 08:26 gueye Run 18750-18758 comments
  • 4937 03/26/98 08:13 cdaq Run 18758: 4He target
  • 4936 03/26/98 08:00 cdaq Run 18757: 4He target
  • 4934 03/26/98 07:55 cdaq Run 18756: 4He target
  • 4935 03/26/98 07:54 gaskell changed helium bottle
  • 4933 03/26/98 07:46 cdaq Run 18755: 4He target
  • 4932 03/26/98 07:32 cdaq Run 18754: 4He target
  • 4931 03/26/98 07:25 gueye coin_buf mode-Note for S. Wood
  • 4930 03/26/98 07:23 gueye Run 18751-18754 comments
  • 4929 03/26/98 07:20 cdaq Run 18753: 4He target
  • 4928 03/26/98 07:19 cdaq Run 18752: 4He target
  • 4927 03/26/98 07:04 cdaq Run 18751: 4He target
  • 4926 03/26/98 06:50 cdaq Run 18750: 4He target
  • 4925 03/26/98 06:49 cdaq Run 18749: 4He target
  • 4924 03/26/98 06:40 cdaq Run 18748: 4He target
  • 4923 03/26/98 06:32 gueye Superharp scan before luminosity scan
  • 4922 03/26/98 06:18 cdaq Run 18747: 4He target
  • 4921 03/26/98 06:15 cdaq Run 18746: 4He target
  • 4920 03/26/98 06:10 cdaq Run 18745: 4He target
  • 4919 03/26/98 06:07 averys changed disk
  • 4918 03/26/98 06:02 cdaq Run 18744: 4He target
  • 4917 03/26/98 05:52 cdaq Run 18743: test run
  • 4916 03/26/98 05:48 Reinhold Beam! Yeah!
  • Wednesday

  • 4915 03/25/98 23:59 cdaq Beam Time Accounting
  • 4914 03/25/98 23:29 Bryon the DP calls
  • 4913 03/25/98 23:27 Bryon Spectrometer triggers
  • 4912 03/25/98 23:19 Bryon Getting ready for beam in hall
  • 4911 03/25/98 23:19 cdaq Run 18742: cosmic run
  • 4910 03/25/98 22:05 Cdaq This is Joerg's run plan for tonight
  • 4909 03/25/98 19:45 cdaq Run 18741: Cosmic test
  • 4908 03/25/98 17:34 cdaq Run 18740: Cosmic test
  • 4907 03/25/98 17:16 cdaq Run 18739: Cosmic test
  • 4906 03/25/98 16:59 saw Buffered mode
  • 4905 03/25/98 16:50 cdaq Run 18738: DAQ test run
  • 4904 03/25/98 15:17 Reinhold Runplan Swing Shift 3/25
  • 4903 03/25/98 11:39 Vulcan high voltage suppy
  • 4902 03/25/98 10:12 cdaq Run 18728: DAQ test run
  • 4901 03/25/98 09:04 Vulcan Gas sensors
  • 4900 03/25/98 08:42 gaskell Gas bottles open
  • Tuesday

  • 4899 03/24/98 15:58 cdaq Run 18727: DAQ test run
  • 4898 03/24/98 15:48 cdaq Run 18726: DAQ test run
  • 4897 03/24/98 15:36 cdaq Run 18725: DAQ test run
  • 4896 03/24/98 12:54 assamagan/en hcc23 change/PBLM's
  • Monday

  • 4895 03/23/98 11:02 Reinhold Magnets off
  • 4894 03/23/98 10:05 pawel and ga Gases closed and HV off.
  • 4893 03/23/98 06:47 johna Coincidence trigger problem
  • 4892 03/23/98 06:03 cdaq Beam Time Accounting
  • 4891 03/23/98 05:02 cdaq Run 18723: pi+ production on carbon, ebeam=.845 w=1.16
  • 4890 03/23/98 04:05 ent bpm screen
  • 4889 03/23/98 04:02 cdaq Run 18722: pi+ production on carbon, ebeam=.845 w=1.16
  • 4888 03/23/98 02:58 cdaq Run 18721: pi+ production on carbon, ebeam=.845 w=1.16
  • 4887 03/23/98 01:54 cdaq Run 18720: pi+ production on carbon, ebeam=.845 w=1.16
  • 4886 03/23/98 00:48 cdaq Run 18719: pi+ production on carbon, ebeam=.845 w=1.16
  • 4885 03/23/98 00:09 Breuer shift summary
  • 4884 03/23/98 00:07 cdaq Beam Time Accounting
  • Sunday

  • 4883 03/22/98 23:43 cdaq Run 18718: pi+ production on carbon, ebeam=.845 w=1.16
  • 4882 03/22/98 23:33 Breuer move to carbon target
  • 4881 03/22/98 23:15 bpms bpmscreen
  • 4880 03/22/98 22:50 cdaq Run 18717: pi+ production on carbon, ebeam=.845 w=1.16
  • 4879 03/22/98 22:42 johna 18716 is carbon running
  • 4878 03/22/98 22:41 johna Run18716-many pauses.
  • 4877 03/22/98 22:35 averys fans off
  • 4876 03/22/98 22:34 bpms bpms
  • 4875 03/22/98 21:48 cdaq Run 18716: pi+ production on dummy ebeam=.845 w=1.16
  • 4874 03/22/98 21:37 cdaq Run 18715: test run-looking for the carbon target.
  • 4873 03/22/98 21:28 cdaq Run 18714: test run-looking for the carbon target.
  • 4872 03/22/98 21:21 cdaq Run 18713: test run-looking for the carbon target.
  • 4871 03/22/98 21:17 cdaq Run 18712: test run-looking for the carbon target.
  • 4870 03/22/98 20:51 Breuer system checks, current calibrationst,start lN in compressor
  • 4869 03/22/98 20:30 cdaq Run 18711: pi+ production on dummy ebeam=.845 w=1.16
  • 4868 03/22/98 20:05 Reinhold encoder for the carbon target
  • 4867 03/22/98 20:03 Reinhold Raster on dummy target
  • 4866 03/22/98 19:58 cdaq Run 18710: pi+ production on dummy ebeam=.845 w=1.16
  • 4865 03/22/98 19:42 Reinhold Run Plan until Monday 6am
  • 4864 03/22/98 19:26 cdaq Run 18709: pi+ production on dummy ebeam=.845 w=1.16
  • 4863 03/22/98 18:56 cdaq Run 18708: pi+ production on dummy ebeam=.845 w=1.16
  • 4862 03/22/98 18:48 cdaq Run 18707: pi+ production on dummy ebeam=.845 w=1.16
  • 4861 03/22/98 18:26 cdaq Run 18706: pi+ production on dummy ebeam=.845 w=1.16
  • 4860 03/22/98 16:50 cdaq Beam Time Accounting
  • 4859 03/22/98 16:41 cdaq Run 18705: pi+ production on dummy ebeam=.845 w=1.16
  • 4858 03/22/98 16:12 cdaq Run 18704: pi+ production on dummy ebeam=.845 w=1.16
  • 4857 03/22/98 15:58 cdaq Beam Time Accounting
  • 4856 03/22/98 15:57 mueller shift summary
  • 4855 03/22/98 15:40 cdaq Run 18703: pi+ production on dummy ebeam=.845 w=1.16
  • 4854 03/22/98 15:34 bpms BPM screen
  • 4853 03/22/98 15:11 cdaq Run 18702: pi+ production on dummy ebeam=.845 w=1.16
  • 4852 03/22/98 13:21 cdaq Run 18701: pi+ production on dummy ebeam=.845 w=1.16
  • 4851 03/22/98 12:51 cdaq Run 18700: pi+ production on dummy ebeam=.845 w=1.16
  • 4850 03/22/98 12:48 bpms bpm screens
  • 4849 03/22/98 12:21 cdaq Run 18699: pi+ production on dummy ebeam=.845 w=1.16
  • 4848 03/22/98 11:12 Mitchell Beam line valve problems
  • 4847 03/22/98 11:03 Mitchell Target shutdown
  • 4846 03/22/98 10:54 Reinhold Run plan
  • 4845 03/22/98 09:54 Reinhold sdc wiremaps
  • 4844 03/22/98 09:04 cdaq Run 18698: pi+ production LD2 ebeam=.845 w=1.16
  • 4843 03/22/98 08:10 ent bpm screen
  • 4842 03/22/98 08:06 cdaq Target Shift Checklist
  • 4841 03/22/98 08:01 cdaq Beam Time Accounting
  • 4840 03/22/98 08:00 cdaq Run 18697: pi+ production LD2 ebeam=.845 w=1.16
  • 4839 03/22/98 07:05 cdaq Run 18696: pi+ production LD2 ebeam=.845 w=1.16
  • 4838 03/22/98 06:17 cdaq Run 18695: pi+ production LH2 ebeam=.845 w=1.16
  • 4837 03/22/98 05:16 gabriel run 18693 == Junk
  • 4836 03/22/98 05:15 cdaq Run 18694: pi+ production LH2 ebeam=.845 w=1.16
  • 4835 03/22/98 05:07 cdaq Run 18693: pi+ production LH2 ebeam=.845 w=1.16
  • 4834 03/22/98 04:34 cdaq Run 18692: pi+ production LH2 ebeam=.845 w=1.16
  • 4833 03/22/98 03:35 cdaq Run 18691: pi+ production , ebeam=.845 w=1.16
  • 4832 03/22/98 02:12 gabriel problems replaying 18689
  • 4831 03/22/98 02:09 cdaq Run 18690: pi- production , ebeam=.845 w=1.16
  • 4830 03/22/98 01:56 cdaq Run 18689: pi- production , ebeam=.845 w=1.16
  • 4829 03/22/98 01:53 gabriel 18688 == Junk
  • 4828 03/22/98 01:41 cdaq Run 18688: pi- production , ebeam=.845 w=1.16
  • 4827 03/22/98 01:01 cdaq Run 18687: pi- production , ebeam=.845 w=1.16
  • 4826 03/22/98 00:09 cdaq Beam Time Accounting
  • 4825 03/22/98 00:09 breuer summary 16:00-24:00
  • 4824 03/22/98 00:02 cdaq Run 18686: pi- production , ebeam=.845 w=1.16
  • Saturday

  • 4823 03/21/98 23:43 breuer 1 am short interruption possible
  • 4822 03/21/98 23:26 breuer DAQ crash
  • 4821 03/21/98 23:18 cdaq Run 18685: pi- production , ebeam=.845 w=1.16
  • 4820 03/21/98 22:31 breuer 16:00-19:00
  • 4819 03/21/98 22:29 cdaq Run 18684: pi- production , ebeam=.845 w=1.16
  • 4818 03/21/98 22:08 johna Argon Bottle low
  • 4817 03/21/98 21:11 cdaq Run 18683: pi- production , ebeam=.845 w=1.16
  • 4816 03/21/98 20:01 cdaq Run 18682: pi- production , ebeam=.845 w=1.16
  • 4815 03/21/98 19:37 breuer structure in rad.level with dummy target at 800 mev
  • 4814 03/21/98 18:59 cdaq Run 18681: pi- production , ebeam=.845 w=1.16
  • 4813 03/21/98 17:46 cdaq Run 18680: pi- production , ebeam=.845 w=1.16
  • 4812 03/21/98 16:21 cdaq Target Shift Checklist
  • 4811 03/21/98 16:13 cdaq Run 18679: pi- production lD2 ebeam=.845 w=1.16
  • 4810 03/21/98 16:07 bryon shift report
  • 4809 03/21/98 16:07 cdaq Beam Time Accounting
  • 4808 03/21/98 15:08 cdaq Run 18678: pi- production lD2 ebeam=.845 w=1.16
  • 4807 03/21/98 14:57 bryon HMS HV for 2X and 2Y HODO planes shut down
  • 4806 03/21/98 14:27 cdaq Run 18677: pi- production lD2 ebeam=.845 w=1.16
  • 4805 03/21/98 14:14 Cdaq DAQ crashes yet again!!
  • 4804 03/21/98 14:12 cdaq Run 18676: pi- production lD2 ebeam=.845 w=1.16
  • 4803 03/21/98 14:03 bpms BPM screen
  • 4802 03/21/98 13:51 bryon DAQ crashed yet again
  • 4801 03/21/98 13:50 bryon Steve Wood fixed it
  • 4800 03/21/98 13:36 cdaq Run 18675: pi- production lD2 ebeam=.845 w=1.16
  • 4799 03/21/98 13:21 cdaq Target Shift Checklist
  • 4798 03/21/98 13:04 Bryon DAQ crashes, reboot everything and restart
  • 4797 03/21/98 12:52 cdaq Run 18674: pi- production lD2 ebeam=.845 w=1.16
  • 4796 03/21/98 12:44 cdaq Run 18673: pi- production lD2 ebeam=.845 w=1.16
  • 4795 03/21/98 11:46 bryon switched data disks
  • 4794 03/21/98 11:44 cdaq Run 18672: pi- production lD2 ebeam=.845 w=1.16
  • 4793 03/21/98 10:49 cdaq Run 18671: pi- production lD2 ebeam=.845 w=1.16
  • 4792 03/21/98 09:36 cdaq Run 18670: pi- production lD2 ebeam=.845 w=1.16
  • 4791 03/21/98 09:25 bpms bpm screen capture
  • 4790 03/21/98 08:47 Bryon HMS hodo weirdness
  • 4789 03/21/98 08:36 cdaq Target Shift Checklist
  • 4788 03/21/98 08:35 cdaq Run 18669: pi- production lD2 ebeam=.845 w=1.16
  • 4787 03/21/98 08:32 cdaq Run 18668: HMS HODO TEST
  • 4786 03/21/98 08:26 cdaq Run 18667: HMS HODO TEST
  • 4785 03/21/98 08:22 cdaq Run 18666: HMS HODO TEST
  • 4784 03/21/98 08:15 cdaq Run 18665: pi- production lD2 ebeam=.845 w=1.16
  • 4783 03/21/98 07:59 zihlmann shift history
  • 4782 03/21/98 07:59 cdaq Beam Time Accounting
  • 4781 03/21/98 07:52 averys hms hodo turned off
  • 4780 03/21/98 07:43 cdaq Run 18664: pi- production lD2 ebeam=.845 w=1.16
  • 4779 03/21/98 06:53 cdaq Run 18663: pi- production lD2 ebeam=.845 w=1.16
  • 4778 03/21/98 05:56 cdaq Run 18662: pi- production lD2 ebeam=.845 w=1.16
  • 4777 03/21/98 05:42 cdaq Run 18661: pi- production lD2 ebeam=.845 w=1.16
  • 4776 03/21/98 04:43 zihlmann TGT gui problem in loop1 charts
  • 4775 03/21/98 04:30 cdaq Run 18660: pi- production lD2 ebeam=.845 w=1.16
  • 4774 03/21/98 03:47 cdaq Run 18659: pi- production lD2 ebeam=.845 w=1.16
  • 4773 03/21/98 03:40 johna Errors in replay of run 18657
  • 4772 03/21/98 03:35 cdaq Run 18658: pi- production lD2 ebeam=.845 w=1.16
  • 4771 03/21/98 03:21 johna Visual scaler reset signal.
  • 4770 03/21/98 03:19 cdaq Run 18657: pi- production lD2 ebeam=.845 w=1.16
  • 4769 03/21/98 02:59 johna cdaqh1/2 problem
  • 4768 03/21/98 02:39 johna 1st two BCM calibrations are bad.
  • 4767 03/21/98 02:32 cdaq Run 18656: BCM calibration
  • 4766 03/21/98 02:15 cdaq Run 18655: BCM calibration
  • 4765 03/21/98 02:12 zihlmann, ar Run 18654 was a BCM Calibraion
  • 4764 03/21/98 01:52 cdaq Run 18654: pi- production lD2 ebeam=.845 w=1.16
  • 4763 03/21/98 01:19 zihlmann, ar clear signal for visual scalers
  • 4762 03/21/98 01:12 cdaq Run 18653: pi- production lD2 ebeam=.845 w=1.16
  • 4761 03/21/98 01:08 cdaq Run 18652: pi- production lD2 ebeam=.845 w=1.16
  • 4760 03/21/98 00:39 cdaq Run 18651: pi- production lD2 ebeam=.845 w=1.16
  • 4759 03/21/98 00:36 cdaq Run 18650: pi- production lD2 ebeam=.845 w=1.16
  • 4758 03/21/98 00:34 cdaq Run 18649: pi- production lD2 ebeam=.845 w=1.16
  • 4757 03/21/98 00:32 cdaq Run 18648: pi- production lD2 ebeam=.845 w=1.16
  • 4756 03/21/98 00:24 cdaq Run 18647: pi- production lD2 ebeam=.845 w=1.16
  • 4755 03/21/98 00:07 cdaq Beam Time Accounting
  • 4754 03/21/98 00:06 breuer to Joerg: warming up target message
  • 4753 03/21/98 00:03 breuer shift summary 16:00-24:00
  • 4752 03/21/98 00:01 breuer no beam
  • Friday

  • 4751 03/20/98 23:41 segel BPM charts
  • 4750 03/20/98 23:32 breuer 10 min no beam
  • 4749 03/20/98 23:12 johna restored replay.parm
  • 4748 03/20/98 23:01 cdaq Run 18646: pi- production lD2 ebeam=.845 w=1.16
  • 4747 03/20/98 22:56 breuer vmec2 rebooted
  • 4746 03/20/98 22:55 cdaq Run 18645: pi- production lD2 ebeam=.845 w=1.16
  • 4745 03/20/98 22:01 johna cdah1/2 paw++ problems.
  • 4744 03/20/98 21:50 cdaq Run 18644: pi- production lD2 ebeam=.845 w=1.16
  • 4743 03/20/98 20:38 cdaq Run 18643: pi- production lD2 ebeam=.845 w=1.16
  • 4742 03/20/98 20:35 johna No work disks.
  • 4741 03/20/98 20:23 breuer Problems with CDAQH2 and paw
  • 4740 03/20/98 20:18 breuer no beam/ low beam
  • 4739 03/20/98 20:10 cdaq Run 18642: pi- production lD2 ebeam=.845 w=1.16
  • 4738 03/20/98 19:36 sawafta beam back
  • 4736 03/20/98 19:35 cdaq Run 18641: pi- production lD2 ebeam=.845 w=1.16
  • 4737 03/20/98 19:34 breuer beam back
  • 4735 03/20/98 18:00 breuer beam off for system checks
  • 4734 03/20/98 17:21 cdaq Run 18640: pi- production lD2 ebeam=.845 w=1.16
  • 4733 03/20/98 17:14 Reinhold replay crashes
  • 4732 03/20/98 16:10 cdaq Run 18639: pi- production lD2 ebeam=.845 w=1.16
  • 4731 03/20/98 15:57 cdaq Beam Time Accounting
  • 4730 03/20/98 15:56 bryon shift report
  • 4729 03/20/98 15:42 bryon system check
  • 4728 03/20/98 15:37 cdaq Run 18638: pi- production lD2 ebeam=.845 w=1.16
  • 4727 03/20/98 15:18 cdaq Run 18637: pi- production lD2 ebeam=.845 w=1.16
  • 4726 03/20/98 14:57 segel BPM screen
  • 4725 03/20/98 14:51 cdaq Target Shift Checklist
  • 4724 03/20/98 14:47 Mack bscopes restarted
  • 4723 03/20/98 14:24 cdaq Run 18636: pi- production lD2 ebeam=.845 w=1.16
  • 4722 03/20/98 14:08 Mack general Hall C business: Hickson get your email fixed
  • 4721 03/20/98 13:23 bryon DAQ crashes
  • 4720 03/20/98 13:22 cdaq Run 18635: junk test run
  • 4719 03/20/98 12:04 cdaq Run 18634: pi- production lD2 ebeam=.845 w=1.16
  • 4718 03/20/98 11:29 cdaq Run 18633: pi- production lD2 ebeam=.845 w=1.16
  • 4717 03/20/98 10:29 cdaq Run 18632: pi- production lD2 ebeam=.845 w=1.16
  • 4716 03/20/98 10:06 cdaq Target Shift Checklist
  • 4715 03/20/98 09:31 cdaq Run 18631: pi- production lD2 ebeam=.845 w=1.16
  • 4714 03/20/98 08:27 cdaq Run 18630: pi- production lD2 ebeam=.845 w=1.16
  • 4713 03/20/98 08:06 cdaq Target Shift Checklist
  • 4712 03/20/98 08:00 cdaq Beam Time Accounting
  • 4711 03/20/98 07:59 johna Shift Summary, 00:00-08:00
  • 4710 03/20/98 07:35 cdaq Run 18629: pi- production lD2 ebeam=.845 w=1.16
  • 4709 03/20/98 07:28 gaskell bpm screen
  • 4708 03/20/98 06:39 cdaq Run 18628: pi- production lD2 ebeam=.845 w=1.16
  • 4707 03/20/98 05:53 gaskell changed data disk to data5
  • 4706 03/20/98 05:49 cdaq Run 18627: pi- production lD2 ebeam=.845 w=1.16
  • 4705 03/20/98 05:24 pawel Shift checklist
  • 4704 03/20/98 05:00 cdaq Run 18626: pi- production lD2 ebeam=.845 w=1.16
  • 4703 03/20/98 04:14 cdaq Run 18625: pi- production lD2 ebeam=.845 w=1.16
  • 4702 03/20/98 04:04 gaskell bpm screens
  • 4701 03/20/98 03:15 cdaq Run 18624: pi- production lD2 ebeam=.845 w=1.16
  • 4700 03/20/98 03:12 johna Change in HMS trigger.
  • 4699 03/20/98 03:02 cdaq Run 18623: pi- production lD2 ebeam=.845 w=1.16
  • 4698 03/20/98 02:18 cdaq Run 18622: pi- production lD2 ebeam=.845 w=1.16
  • 4697 03/20/98 00:02 sawafta beam off
  • 4696 03/20/98 00:00 cdaq Beam Time Accounting
  • Thursday

  • 4695 03/19/98 23:57 breuer shift summary 16:00-24:00
  • 4694 03/19/98 23:47 cdaq Run 18621: pi- production lD2 ebeam=.845 w=1.16
  • 4693 03/19/98 23:39 breuer system checks planned after midnight
  • 4692 03/19/98 22:47 breuer no beam period
  • 4691 03/19/98 22:47 cdaq Run 18620: pi- production lD2 ebeam=.845 w=1.16
  • 4690 03/19/98 21:35 cdaq Run 18619: pi- production lD2 ebeam=.845 w=1.16
  • 4689 03/19/98 20:15 cdaq Run 18618: pi- production lD2 ebeam=.845 w=1.16
  • 4688 03/19/98 19:16 cdaq Run 18617: pi- production lD2 ebeam=.845 w=1.16
  • 4687 03/19/98 18:13 breuer BPM repair
  • 4686 03/19/98 18:13 cdaq Run 18616: pi- production lD2 ebeam=.845 w=1.16
  • 4685 03/19/98 18:08 geesaman BPM IOC needs to bbe rebooted
  • 4684 03/19/98 16:49 cdaq Run 18615: pi- production lD2 ebeam=.845 w=1.16
  • 4683 03/19/98 16:21 mueller bpm screen grab
  • 4682 03/19/98 16:07 mueller shift notes
  • 4681 03/19/98 16:07 cdaq Beam Time Accounting
  • 4680 03/19/98 15:46 cdaq Run 18614: pi- production lD2 ebeam=.845 w=1.16
  • 4679 03/19/98 15:46 Mack Regarding Dave McKee's luminosity scan analysis
  • 4678 03/19/98 14:47 cdaq Run 18613: pi- production lD2 ebeam=.845 w=1.16
  • 4677 03/19/98 13:58 Geeesaman Shift Check list
  • 4676 03/19/98 13:48 geesaman bpm screen in checklist
  • 4675 03/19/98 13:45 cdaq Run 18612: pi- production lD2 ebeam=.845 w=1.16
  • 4674 03/19/98 12:49 cdaq Run 18611: pi- production lD2 ebeam=.845 w=1.16
  • 4673 03/19/98 12:47 dmckee Preliminary D2 Luminosity scan, scaler, HMS, SOS
  • 4672 03/19/98 12:44 dmckee Preliminary H2, D2, Luminosity Scan, scalers, HMS, SOS
  • 4671 03/19/98 12:25 cdaq Run 18610: bcm calibration run
  • 4670 03/19/98 11:57 mueller bpm screen caputure
  • 4669 03/19/98 11:42 cdaq Run 18609: pi- production lD2 ebeam=.845 w=1.16
  • 4668 03/19/98 11:38 cdaq Run 18608: pi- production lD2 ebeam=.845 w=1.16
  • 4667 03/19/98 11:37 Mack beam energy has been breathing
  • 4666 03/19/98 11:14 cdaq Run 18607: pi- production lD2 ebeam=.845 w=1.16
  • 4665 03/19/98 10:39 cdaq Run 18606: pi- production lD2 ebeam=.845 w=1.16
  • 4664 03/19/98 09:44 cdaq Run 18605: pi- production lD2 ebeam=.845 w=1.16
  • 4663 03/19/98 08:21 cdaq Target Shift Checklist
  • 4662 03/19/98 08:00 zihlmann Shift notes
  • 4661 03/19/98 07:59 cdaq Beam Time Accounting
  • 4660 03/19/98 07:44 zihlmann beam profile monitors
  • 4659 03/19/98 07:37 cdaq Run 18604: pi- production lD2 ebeam=.845 w=1.16
  • 4658 03/19/98 07:20 gaskell W=1.6 GeV Phase Space
  • 4657 03/19/98 06:40 cdaq Run 18603: pi- production lD2 ebeam=.845 w=1.16
  • 4656 03/19/98 05:40 cdaq Run 18602: pi- production lD2 ebeam=.845 w=1.16
  • 4655 03/19/98 05:22 averys replay error - run 18600
  • 4654 03/19/98 04:40 cdaq Run 18601: pi- production lD2 ebeam=.845 w=1.16
  • 4653 03/19/98 03:51 cdaq Target Shift Checklist
  • 4652 03/19/98 03:00 cdaq Run 18600: pi+ production lD2 ebeam=.845 w=1.16
  • 4651 03/19/98 02:08 cdaq Run 18599: pi+ production lD2 ebeam=.845 w=1.16
  • 4650 03/19/98 00:58 cdaq Run 18598: pi+ production lD2 ebeam=.845 w=1.16
  • 4649 03/19/98 00:55 cdaq Run 18597: pi+ production lD2 ebeam=.845 w=1.16
  • 4648 03/19/98 00:40 johna SOS thresholds vs. singles rates
  • 4647 03/19/98 00:08 koltenuk Pi+ count status
  • 4646 03/19/98 00:07 cdaq Beam Time Accounting
  • 4645 03/19/98 00:07 cdaq Beam Time Accounting
  • 4644 03/19/98 00:06 cdaq Beam Time Accounting
  • 4643 03/19/98 00:04 breuer shift summary 16:00-24:00
  • Wednesday

  • 4642 03/18/98 23:58 koltenuk HMS SOS threshold change
  • 4641 03/18/98 23:54 cdaq Run 18596: pi+ production lD2 ebeam=.845 w=1.16
  • 4640 03/18/98 23:26 Cowley BPM screen
  • 4639 03/18/98 23:06 breuer SOS polarity change postponed to 1:30 am
  • 4638 03/18/98 23:04 cdaq Run 18595: pi+ production lD2 ebeam=.845 w=1.16
  • 4637 03/18/98 22:19 koltenuk HMS SOS threshold change
  • 4636 03/18/98 22:15 cdaq Run 18594: pi+ production lD2 ebeam=.845 w=1.16
  • 4635 03/18/98 22:01 cdaq Run 18593: pi+ production lD2 ebeam=.845 w=1.16
  • 4634 03/18/98 21:01 cdaq Run 18592: pi+ production lD2 ebeam=.845 w=1.16
  • 4633 03/18/98 20:03 cdaq Run 18591: pi+ production lD2 ebeam=.845 w=1.16
  • 4632 03/18/98 19:03 cdaq Run 18590: pi+ production lD2 ebeam=.845 w=1.16
  • 4631 03/18/98 18:50 segal bpm picture for old checklist
  • 4630 03/18/98 18:18 Reinhold D2 40uA running
  • 4629 03/18/98 18:17 johna 'statistics' vs current calculation
  • 4628 03/18/98 18:04 breuer change of beam current
  • 4627 03/18/98 18:03 cdaq Run 18589: pi+ production lD2 ebeam=.845 w=1.16
  • 4626 03/18/98 17:04 cdaq Run 18588: pi+ production lD2 ebeam=.845 w=1.16
  • 4625 03/18/98 16:16 cdaq Beam Time Accounting
  • 4624 03/18/98 16:04 cdaq Run 18587: pi+ production lD2 ebeam=.845 w=1.16
  • 4623 03/18/98 15:04 cdaq Run 18586: pi+ production lD2 ebeam=.845 w=1.16
  • 4622 03/18/98 15:01 gilman statistical uncertainty for large currents
  • 4621 03/18/98 14:10 anon So what happened when Ibeam was increased?
  • 4620 03/18/98 14:04 cdaq Run 18585: pi+ production lD2 ebeam=.845 w=1.16
  • 4619 03/18/98 13:50 mack note bcm calibration was changed around 18400
  • 4618 03/18/98 13:07 cdaq Run 18584: pi+ production lD2 ebeam=.845 w=1.16
  • 4617 03/18/98 12:15 cdaq Run 18583: pi+ production lD2 ebeam=.845 w=1.16
  • 4616 03/18/98 12:06 cdaq Target Shift Checklist
  • 4615 03/18/98 11:27 cdaq Run 18582: pi+ production lD2 ebeam=.845 w=1.16
  • 4614 03/18/98 11:15 anklin DAQ crash
  • 4613 03/18/98 11:12 cdaq Run 18581: pi+ production lD2 ebeam=.845 w=1.16
  • 4612 03/18/98 10:45 Anklin BCM calib. analysis plots cont.
  • 4611 03/18/98 10:45 Anklin BCM calibr. analysis plots cont.
  • 4610 03/18/98 10:43 H. Anklin BCM1/BCM2 ratios for all runs (up to now)
  • 4609 03/18/98 10:43 mack hodo slop parameters nice and loose
  • 4608 03/18/98 10:06 cdaq Target Shift Checklist
  • 4607 03/18/98 09:53 cdaq Run 18580: pi+ production lD2 ebeam=.845 w=1.16
  • 4606 03/18/98 09:33 Anklin BCM calibration analysis run 18571
  • 4604 03/18/98 09:21 Anklin BCM calibr. plots cont.
  • 4605 03/18/98 09:21 Anklin BCM calibr. plots cont.
  • 4603 03/18/98 09:20 Anklin BCM calibration analysis run 18544
  • 4602 03/18/98 08:34 cdaq Run 18579: pi+ production lD2 ebeam=.845 w=1.16
  • 4601 03/18/98 08:25 cdaq Beam Time Accounting
  • 4600 03/18/98 08:06 cdaq Target Shift Checklist
  • 4599 03/18/98 07:35 gaskell 18577 is junk
  • 4598 03/18/98 07:33 cdaq Run 18578: pi+ production lD2 ebeam=.845 w=1.16
  • 4597 03/18/98 07:22 cdaq Run 18577: pi+ production lD2 ebeam=.845 w=1.16
  • 4596 03/18/98 06:45 Dunne Shift Checklist
  • 4595 03/18/98 06:40 cdaq Run 18576: pi+ production lD2 ebeam=.845 w=1.16
  • 4594 03/18/98 06:37 cdaq Run 18575: pi+ production lD2 ebeam=.845 w=1.16
  • 4593 03/18/98 06:33 Dunne BPM screen
  • 4592 03/18/98 06:17 cdaq Run 18574: pi+ production lD2 ebeam=.845 w=1.16
  • 4591 03/18/98 06:02 cdaq Run 18573: pi+ production lD2 ebeam=.845 w=1.16
  • 4590 03/18/98 05:05 cdaq Run 18572: pi+ production lD2 ebeam=.845 w=1.16
  • 4589 03/18/98 04:42 cdaq Run 18571: BCM CALIBRATION
  • 4588 03/18/98 04:10 cdaq Run 18570: pi+ production lD2 ebeam=.845 w=1.16
  • 4587 03/18/98 04:01 cdaq Run 18569: pi+ production lD2 ebeam=.845 w=1.16
  • 4586 03/18/98 02:58 cdaq Run 18568: pi+ production lD2 ebeam=.845 w=1.16
  • 4585 03/18/98 02:00 cdaq Run 18567: pi+ production lD2 ebeam=.845 w=1.16
  • 4584 03/18/98 00:58 cdaq Run 18566: pi+ production lD2 ebeam=.845 w=1.16
  • 4583 03/18/98 00:07 cdaq Run 18565: pi+ production lD2 ebeam=.845 w=1.16
  • 4582 03/18/98 00:06 cdaq Beam Time Accounting
  • 4581 03/18/98 00:04 breuer 22:00 - 24:00
  • Tuesday

  • 4580 03/17/98 23:55 cdaq Run 18564: pi+ production lD2 ebeam=.845 w=1.16
  • 4579 03/17/98 22:53 cdaq Run 18563: pi+ production lD2 ebeam=.845 w=1.16
  • 4578 03/17/98 21:56 breuer 19:40 - 22:00
  • 4577 03/17/98 21:53 cdaq Run 18562: pi+ production lD2 ebeam=.845 w=1.16
  • 4576 03/17/98 21:18 oneill BPM screen
  • 4575 03/17/98 20:43 cdaq Run 18561: pi+ production lD2 ebeam=.845 w=1.16
  • 4574 03/17/98 20:40 koltenuk SOS drift chambers off
  • 4573 03/17/98 20:37 koltenuk SOS scin off
  • 4572 03/17/98 20:30 cdaq Run 18560: pi+ production lD2 ebeam=.845 w=1.16
  • 4571 03/17/98 19:50 cdaq Run 18559: pi+ production lD2 ebeam=.845 w=1.16
  • 4570 03/17/98 19:01 breuer 16:00 to 19:00
  • 4568 03/17/98 16:34 cdaq Run 18557: pi+ production lD2 ebeam=.845 w=1.16
  • 4567 03/17/98 16:03 cdaq Beam Time Accounting
  • 4566 03/17/98 16:02 mack shift summary
  • 4565 03/17/98 15:50 cdaq Run 18556: pi+ production lD2 ebeam=.845 w=1.16
  • 4564 03/17/98 15:13 r gilman bpm screen for shift checklist
  • 4563 03/17/98 15:01 cdaq Run 18555: pi+ production lD2 ebeam=.845 w=1.16
  • 4562 03/17/98 14:17 cdaq Run 18554: pi+ production lD2 ebeam=.845 w=1.16
  • 4561 03/17/98 13:58 cdaq Run 18553: pi+ production lD2 ebeam=.845 w=1.16
  • 4560 03/17/98 13:14 mack homework sheet for sos quad tweak
  • 4559 03/17/98 13:09 mack,avery hms S2 trip
  • 4558 03/17/98 13:07 cdaq Run 18552: pi+ production lD2 ebeam=.845 w=1.16
  • 4557 03/17/98 13:03 mack,reinhol fudged sos quad current as per D Potterveld
  • 4556 03/17/98 13:00 cdaq Run 18551: pi+ production lD2 ebeam=.845 w=1.16
  • 4555 03/17/98 12:17 cdaq Run 18550: pi+ production lD2 ebeam=3.245 w=1.6
  • 4554 03/17/98 11:56 averys runs 18545-18549
  • 4553 03/17/98 11:51 averys run 18548
  • 4552 03/17/98 11:35 cdaq Run 18549: pi+ production lD2 ebeam=3.245 w=1.6
  • 4551 03/17/98 11:26 cdaq Run 18548: pi+ production lD2 ebeam=3.245 w=1.6
  • 4550 03/17/98 11:16 cdaq Run 18547: pi+ production lD2 ebeam=3.245 w=1.6
  • 4549 03/17/98 11:11 cdaq Run 18546: pi+ production lD2 ebeam=3.245 w=1.6
  • 4548 03/17/98 11:08 cdaq Run 18545: pi+ production lD2 ebeam=3.245 w=1.6
  • 4547 03/17/98 10:38 cdaq Run 18544: bc calibration lD2 ebeam=3.245 w=1.6
  • 4547 03/17/98 10:38 cdaq Run 18542: bcm calibration, ebeam=3.245 w=1.6
  • 4545 03/17/98 09:28 fowler spectrometer rotation
  • 4544 03/17/98 07:44 H. Anklin Replaced He-bottle and shift check list
  • 4543 03/17/98 07:11 ddutta shift report
  • 4542 03/17/98 07:08 cdaq Beam Time Accounting
  • 4541 03/17/98 06:38 H. Anklin Q2 tripped
  • 4540 03/17/98 06:36 ddutta Q2 trip
  • 4539 03/17/98 06:31 gaskell Q2 DIES
  • 4538 03/17/98 06:23 H. Anklin BPM medm screen
  • 4537 03/17/98 06:18 cdaq Run 18541: pi+ production lD2 ebeam=3.245 w=1.6
  • 4536 03/17/98 06:06 cdaq Target Shift Checklist
  • 4535 03/17/98 05:48 cdaq Run 18540: pi+ production lD2 ebeam=3.245 w=1.6
  • 4534 03/17/98 05:13 cdaq Run 18539: pi+ production lD2 ebeam=3.245 w=1.6
  • 4533 03/17/98 04:52 gaskell fixed tv cable connector
  • 4532 03/17/98 04:49 gaskell spectrometer rotation gui dead
  • 4531 03/17/98 04:42 cdaq Run 18538: pi+ production lD2 ebeam=3.245 w=1.6
  • 4530 03/17/98 04:40 cdaq Run 18537: pi+ production lD2 ebeam=3.245 w=1.6
  • 4529 03/17/98 04:36 cdaq Run 18536: pi+ production lD2 ebeam=3.245 w=1.6
  • 4528 03/17/98 03:39 gaskell Beam energy
  • 4527 03/17/98 03:36 cdaq Run 18535: pi+ production C-12, ebeam=3.245 w=1.6
  • 4526 03/17/98 03:32 ddutta daq crash
  • 4525 03/17/98 03:29 cdaq Run 18534: pi+ production C-12, ebeam=3.245 w=1.6
  • 4524 03/17/98 03:26 gaskell Carbon coincidences
  • 4523 03/17/98 03:22 gaskell Runs 18522 -18528 are probably junk
  • 4522 03/17/98 02:18 cdaq Run 18533: pi+ production C-12, ebeam=3.245 w=1.6
  • 4521 03/17/98 01:22 cdaq Run 18532: pi+ production C-12, ebeam=3.245 w=1.6
  • 4520 03/17/98 01:10 cdaq Run 18531: pi+ production C-12, ebeam=3.245 w=1.6
  • 4519 03/17/98 01:06 cdaq Run 18530: pi+ production C-12, ebeam=3.245 w=1.6
  • 4517 03/17/98 01:03 cdaq Run 18529: pi+ production C-12, ebeam=3.245 w=1.6
  • 4518 03/17/98 01:02 ddutta SOS hodoscopes
  • 4516 03/17/98 00:43 cdaq Run 18528: pi+ production C-12, ebeam=3.245 w=1.6
  • 4515 03/17/98 00:38 cdaq Run 18527: pi+ production C-12, ebeam=3.245 w=1.6
  • 4514 03/17/98 00:35 cdaq Run 18526: pi+ production C-12, ebeam=3.245 w=1.6
  • 4513 03/17/98 00:33 cdaq Run 18525: pi+ production C-12, ebeam=3.245 w=1.6
  • 4512 03/17/98 00:30 cdaq Run 18524: pi+ production C-12, ebeam=3.245 w=1.6
  • 4511 03/17/98 00:27 cdaq Run 18523: pi+ production C-12, ebeam=3.245 w=1.6
  • 4510 03/17/98 00:22 cdaq Run 18522: pi+ production C-12, ebeam=3.245 w=1.6
  • 4509 03/17/98 00:06 baker End of Shift Report
  • 4508 03/17/98 00:04 cdaq Beam Time Accounting
  • Monday

  • 4506 03/16/98 23:55 koltenuk HMS scin S2X 8+
  • 4507 03/16/98 23:55 koltenuk extra events
  • 4505 03/16/98 23:26 cdaq Run 18521: pi- production C-12, ebeam=3.245 w=1.6
  • 4504 03/16/98 23:24 cdaq Run 18520: pi- production C-12, ebeam=3.245 w=1.6
  • 4503 03/16/98 23:11 koltenuk HMS scin S2X, S2Y
  • 4502 03/16/98 23:11 cdaq Run 18519: pi- production C-12, ebeam=3.245 w=1.6
  • 4501 03/16/98 23:04 koltenuk MCC moves beam
  • 4500 03/16/98 22:51 cdaq Run 18518: pi- production C-12, ebeam=3.245 w=1.6
  • 4499 03/16/98 22:39 cdaq Run 18517: pi- production C-12, ebeam=3.245 w=1.6
  • 4498 03/16/98 22:12 cdaq Run 18516: pi- production C-12, ebeam=3.245 w=1.6
  • 4497 03/16/98 22:05 oneill BPM screen
  • 4496 03/16/98 21:41 cdaq Run 18515: pi- production C-12, ebeam=3.245 w=1.6
  • 4495 03/16/98 21:29 koltenuk HMS dipole problems
  • 4494 03/16/98 20:23 cdaq Run 18514: pi- production C-12, ebeam=3.245 w=1.6
  • 4493 03/16/98 20:22 cdaq Run 18513: pi- production C-12, ebeam=3.245 w=1.6
  • 4492 03/16/98 20:13 cdaq Run 18512: pi- production C-12, ebeam=3.245 w=1.6
  • 4491 03/16/98 19:56 cdaq Run 18511: pi- production C-12, ebeam=3.245 w=1.6
  • 4490 03/16/98 19:42 koltenuk disk space problems,extra events
  • 4489 03/16/98 19:39 koltenuk HMS Q2 problem
  • 4488 03/16/98 19:18 cdaq Run 18510: pi- production LH2, ebeam=3.245 w=1.6
  • 4487 03/16/98 19:15 cdaq Run 18509: pi- production LH2, ebeam=3.245 w=1.6
  • 4486 03/16/98 19:12 cdaq Run 18508: pi- production LH2, ebeam=3.245 w=1.6
  • 4485 03/16/98 18:43 cdaq Run 18507: pi- production LD2, ebeam=3.245 w=1.6
  • 4484 03/16/98 18:27 cdaq Run 18506: pi- production LD2, ebeam=3.245 w=1.6
  • 4483 03/16/98 18:17 cdaq Run 18505: pi- production LD2, ebeam=3.245 w=1.6
  • 4482 03/16/98 18:01 cdaq Run 18504: pi- production LD2, ebeam=3.245 w=1.6
  • 4481 03/16/98 17:50 cdaq Run 18503: pi- production LD2, ebeam=3.245 w=1.6
  • 4480 03/16/98 17:33 cdaq Run 18502: pi- production LD2, ebeam=3.245 w=1.6
  • 4479 03/16/98 17:15 cdaq Run 18501: pi- production LD2, ebeam=3.245 w=1.6
  • 4478 03/16/98 16:53 Papavassilio BPM screen
  • 4477 03/16/98 16:47 gilman run 18499 HMS S2xR+ replay oddity
  • 4476 03/16/98 16:17 koltenuk systems check
  • 4475 03/16/98 16:16 koltenuk HMS scin S2X, S2Y
  • 4474 03/16/98 16:11 mack shift summary
  • 4473 03/16/98 16:09 cdaq Beam Time Accounting
  • 4472 03/16/98 16:03 mack recommend take more data on d(e,e'pi-)
  • 4471 03/16/98 16:01 cdaq Run 18500: pi- production c12, ebeam=3.245 w=1.6
  • 4470 03/16/98 15:42 cdaq Run 18499: 4cm dummy, ebeam=3.245 w=1.6
  • 4469 03/16/98 15:29 cdaq Run 18498: 4cm dummy, ebeam=3.245 w=1.6
  • 4468 03/16/98 15:21 gilman data acq runs 18493 - 18497
  • 4466 03/16/98 15:19 cdaq Run 18497: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4467 03/16/98 15:19 mack downloaded new thresholds
  • 4465 03/16/98 15:01 cdaq Run 18496: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4464 03/16/98 14:53 cdaq Run 18495: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4463 03/16/98 14:50 cdaq Run 18494: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4462 03/16/98 14:31 cdaq Run 18493: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4461 03/16/98 14:21 gilman replay troubles for 18491
  • 4460 03/16/98 14:07 cdaq Run 18492: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4459 03/16/98 13:49 cdaq Run 18491: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4458 03/16/98 13:40 mack hodo pedestal shifts
  • 4457 03/16/98 13:30 saw DAQ down
  • 4456 03/16/98 12:30 cdaq Run 18490: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4455 03/16/98 12:10 Wood, Gueye, HV troubles and h1x16+ undervoltage
  • 4454 03/16/98 12:09 cdaq Run 18489: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4453 03/16/98 10:45 mack bcm calibration using bcmcal_v3.pcm
  • 4452 03/16/98 10:12 Lassiter SOS rotation set to 50 degrees
  • 4451 03/16/98 09:53 cdaq Run 18488: entry in progress. taking a long unser zero run.
  • 4450 03/16/98 09:36 cdaq Target Shift Checklist
  • 4449 03/16/98 08:53 H. Anklin shift check list
  • 4448 03/16/98 08:44 H. Anklin Wrong angles in run18487 comment file
  • 4447 03/16/98 08:22 H. Anklin HMS Dipole trip
  • 4446 03/16/98 08:20 gaskell changed sos thresholds file
  • 4445 03/16/98 08:08 ddutta shift report
  • 4444 03/16/98 08:01 cdaq Beam Time Accounting
  • 4443 03/16/98 07:38 H. Anklin Bad O-Ring
  • 4442 03/16/98 07:33 H. Anklin He bottle and He flux
  • 4441 03/16/98 07:27 cdaq Run 18487: pi- production on lD2 target, ebeam=3.245 w=1.6
  • 4440 03/16/98 07:25 H. Anklin BPM medm screen
  • 4439 03/16/98 07:07 gaskell rebuilding our ntuple collection
  • 4438 03/16/98 06:53 cdaq Run 18486: BCM calibration
  • 4437 03/16/98 06:33 gaskell HMS dipole fix
  • 4436 03/16/98 06:22 cdaq Run 18485: JUNK!!
  • 4435 03/16/98 06:18 gaskell HMS epics HV
  • 4434 03/16/98 05:34 ddutta Warning lights on the HMS dipole
  • 4433 03/16/98 04:11 ddutta nuked a partition
  • 4432 03/16/98 03:56 cdaq Run 18484: pi+ production on CARBON target, ebeam=3.245, w=1.6
  • 4431 03/16/98 03:16 cdaq Run 18483: pi+ production on CARBON target, ebeam=3.245, w=1.6
  • 4430 03/16/98 02:42 cdaq Run 18482: pi+ production on CARBON target, ebeam=3.245, w=1.6
  • 4429 03/16/98 02:04 oneill HMS Q2 crash
  • 4428 03/16/98 01:43 cdaq Run 18481: pi+ production on CARBON target, ebeam=3.245, w=1.6
  • 4427 03/16/98 01:37 cdaq Run 18480: pi+ production on CARBON target, ebeam=3.245, w=1.6
  • 4426 03/16/98 01:23 ddutta extra events
  • 4425 03/16/98 01:19 ddutta unusual extra event message
  • 4424 03/16/98 01:07 oneill HMS dipole recovered
  • 4423 03/16/98 01:01 cdaq Run 18479: pi+ production on dummy target, ebeam=3.245, w=1.6
  • 4422 03/16/98 00:44 oneill HMS dipole trip
  • 4421 03/16/98 00:36 cdaq Target Shift Checklist
  • 4420 03/16/98 00:33 cdaq Run 18478: pi+ production on dummy target, ebeam=3.245, w=1.6
  • 4419 03/16/98 00:30 cdaq Run 18477: pi+ production on dummy target, ebeam=3.245, w=1.6
  • 4418 03/16/98 00:27 cdaq Run 18476: pi+ production on dummy target, ebeam=3.245, w=1.6
  • 4417 03/16/98 00:12 cdaq Beam Time Accounting
  • Sunday

  • 4416 03/15/98 23:44 cdaq Run 18475: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4415 03/15/98 23:33 koltenuk HMS thresholds
  • 4414 03/15/98 23:24 cdaq Run 18474: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4413 03/15/98 23:07 koltenuk HMS thresholds
  • 4412 03/15/98 23:04 cdaq Run 18473: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4411 03/15/98 23:03 gaskelld coin ntuples written directly to work disk - for real!!!
  • 4410 03/15/98 22:28 cdaq Run 18472: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4409 03/15/98 22:07 cdaq Run 18471: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4408 03/15/98 21:59 oneill BPM screen
  • 4407 03/15/98 21:49 cdaq Run 18470: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4406 03/15/98 21:37 koltenuk HMS thresholds
  • 4405 03/15/98 21:30 cdaq Run 18469: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4404 03/15/98 21:26 cdaq Run 18468: pi+ production on LD2 target, ebeam=3.245, w=1.6
  • 4403 03/15/98 21:16 koltenuk HMS thresholds
  • 4402 03/15/98 21:03 koltenuk DAQ problem
  • 4401 03/15/98 21:02 cdaq Run 18467: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4400 03/15/98 20:55 cdaq Run 18466: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4399 03/15/98 20:41 cdaq Run 18465: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4398 03/15/98 20:26 cdaq Run 18464: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4397 03/15/98 19:33 cdaq Run 18463: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4396 03/15/98 19:27 cdaq Run 18462: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4395 03/15/98 19:25 cdaq Run 18461: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4394 03/15/98 19:19 cdaq Run 18460: pi+ production on LH2 target, ebeam=3.245, w=1.6
  • 4393 03/15/98 17:33 koltenuk deuterium data, Monte Carlo simulation
  • 4392 03/15/98 16:46 Reinhold Smart Move !?!?
  • 4391 03/15/98 16:06 cdaq Target Shift Checklist
  • 4390 03/15/98 16:04 cdaq Beam Time Accounting
  • 4389 03/15/98 14:16 CRJackson He usage
  • 4388 03/15/98 13:36 johna HDC1y2 wire map.
  • 4387 03/15/98 13:31 cdaq Run 18459: mini-bcm calibration ps1=1200, ps2=2000,ps3=1,ps4=1
  • 4386 03/15/98 13:04 cdaq Run 18458: 4cm dummy, ebeam=1.645, w=1.16
  • 4385 03/15/98 12:51 cdaq Run 18457: pi+ production on lD2 target, ebeam=1.645, w=1.16
  • 4384 03/15/98 12:18 cdaq Run 18456: pi+ production on lD2 target, ebeam=1.645, w=1.16
  • 4383 03/15/98 12:17 johna HMS HV Alarm
  • 4382 03/15/98 12:03 cdaq Run 18455: pi+ production on lD2 target, ebeam=1.645, w=1.16
  • 4381 03/15/98 11:23 gueye DAQ problem
  • 4380 03/15/98 11:22 cdaq Run 18454: pi+ production on lD2 target, ebeam=1.645, w=1.16
  • 4379 03/15/98 11:12 cdaq Run 18453: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4378 03/15/98 10:35 cdaq Run 18452: pi+ production on lD2 target, ebeam=1.645, w=1.16
  • 4377 03/15/98 09:58 cdaq Run 18451: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4376 03/15/98 09:36 cdaq Run 18450: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4375 03/15/98 08:52 cdaq Run 18449: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4374 03/15/98 08:06 cdaq Beam Time Accounting
  • 4373 03/15/98 07:54 cdaq Run 18448: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4372 03/15/98 07:48 gaskell HMS HV:The saga coninues
  • 4371 03/15/98 07:46 cdaq Run 18447: pi+ production on lH2 target, ebeam=1.645, w=1.16
  • 4370 03/15/98 07:43 cdaq Run 18446: BCM calibration 12C 2pass
  • 4369 03/15/98 07:39 cdaq Run 18445: HMS hodo checkout
  • 4368 03/15/98 07:33 cdaq Run 18444: HMS hodo checkout
  • 4367 03/15/98 07:31 cdaq Run 18443: HMS hodo checkout
  • 4366 03/15/98 07:27 ddutta The HV epic(s) saga.
  • 4365 03/15/98 03:05 johna HV alarm disabled
  • 4364 03/15/98 00:36 J. Volmer HMS DC TDC cable adjustment
  • 4363 03/15/98 00:34 johna Pictures for entry 4362.
  • 4362 03/15/98 00:25 johna HDC1X2 (and maybe 1y2) cabling problem.
  • 4361 03/15/98 00:13 koltenuk HMS scin HV problems
  • 4360 03/15/98 00:09 volmer shift checklist BPM screens
  • 4359 03/15/98 00:05 cdaq Beam Time Accounting
  • Saturday

  • 4358 03/14/98 23:51 cdaq Target Shift Checklist
  • 4357 03/14/98 22:39 johna HDC1X2 cabling problem.
  • 4356 03/14/98 20:42 cdaq Run 18442: BCM calibration 12C 2pass
  • 4355 03/14/98 20:06 cdaq Run 18441: BCM calibration 4cm 12C 2pass
  • 4353 03/14/98 18:55 cdaq Run 18440: Pi- production w=1.16 4cm 12C 2pass
  • 4354 03/14/98 18:55 Reinhold BCM calibrations
  • 4352 03/14/98 18:53 cdaq Run 18439: Pi- production w=1.16 4cm 12C 2pass
  • 4351 03/14/98 18:16 cdaq Run 18438: Pi- production w=1.16 4cm LH2 2pass
  • 4350 03/14/98 17:36 cdaq Run 18437: Pi- production w=1.16 4cm LH2 2pass
  • 4349 03/14/98 17:35 johna BCM visual display
  • 4348 03/14/98 17:27 cdaq Run 18436: Pi- production w=1.16 4cm LH2 2pass
  • 4347 03/14/98 16:32 koltenuk MCC takes beam
  • 4346 03/14/98 16:21 cdaq Target Shift Checklist
  • 4345 03/14/98 15:59 cdaq Beam Time Accounting
  • 4344 03/14/98 15:57 cdaq Run 18435: Pi- production w=1.16 4cm dummy 2pass
  • 4343 03/14/98 15:27 johna jul98 kinematics file.
  • 4342 03/14/98 15:15 cdaq Run 18434: Pi- production w=1.16 lD2 target 2pass
  • 4341 03/14/98 14:43 cdaq Run 18433: Pi- production w=1.16 lD2 target 2pass
  • 4340 03/14/98 14:33 mack PLEASE. TWO BCM CALIBRATIONS PER WEEK
  • 4339 03/14/98 14:31 Tang BCM Calibration
  • 4338 03/14/98 14:24 cdaq Run 18432: Pi- production w=1.16 lD2 target 2pass
  • 4337 03/14/98 14:04 averys bpm screen
  • 4336 03/14/98 13:26 cdaq Run 18431: Pi- production w=1.16 lD2 target 2pass
  • 4335 03/14/98 12:56 cdaq Run 18430: Pi- production w=1.16 lD2 target 2pass
  • 4334 03/14/98 10:36 cdaq Run 18429: 4cm dummy 2pass
  • 4333 03/14/98 09:51 cdaq Run 18428: Pi- production w=1.6 lD2 target 2pass
  • 4332 03/14/98 08:51 cdaq Run 18427: Pi- production w=1.6 lD2 target 2pass
  • 4331 03/14/98 08:25 dutta shift summary
  • 4330 03/14/98 07:54 cdaq Beam Time Accounting
  • 4329 03/14/98 07:53 cdaq Run 18426: Pi- production w=1.6 lD2 target 2pass
  • 4328 03/14/98 06:51 cdaq Run 18425: Pi- production w=1.6 lD2 target 2pass
  • 4327 03/14/98 05:50 cdaq Run 18424: Pi- production w=1.6 lD2 target 2pass
  • 4326 03/14/98 05:27 gaskell can't do it!
  • 4325 03/14/98 04:57 Cvxwrks BPM screen
  • 4324 03/14/98 04:51 gaskell lots of spare channels...
  • 4323 03/14/98 04:49 gaskell coin ntuples written directly to work
  • 4322 03/14/98 04:49 cdaq Run 18423: Pi- production w=1.6 lD2 target 2pass
  • 4321 03/14/98 03:40 cdaq Run 18422: Pi- production w=1.6 lD2 target 2pass
  • 4320 03/14/98 03:31 cdaq Run 18421: Pi- production w=1.6 lD2 target 2pass
  • 4319 03/14/98 03:19 gaskell dead scintillators
  • 4318 03/14/98 02:17 cdaq Run 18420: Pi- production w=1.6 lD2 target 2pass
  • 4317 03/14/98 02:16 cdaq Run 18419: Pi- production w=1.6 lD2 target 2pass
  • 4316 03/14/98 02:05 cdaq Run 18418: Pi- production w=1.6 lD2 target 2pass
  • 4315 03/14/98 02:03 cdaq Run 18417: Pi- production w=1.6 lD2 target 2pass
  • 4314 03/14/98 01:58 cdaq Run 18416: Pi- production w=1.6 lD2 target 2pass
  • 4313 03/14/98 01:32 cdaq Run 18415: JUNK
  • 4312 03/14/98 00:00 cdaq Beam Time Accounting
  • Friday

  • 4311 03/13/98 22:56 Cvxwrks BPM screen
  • 4310 03/13/98 22:10 koltenuk SOS trip
  • 4309 03/13/98 22:09 koltenuk MCC takes beam
  • 4308 03/13/98 21:11 cdaq Run 18414: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4307 03/13/98 21:10 koltenuk Q2 trip
  • 4306 03/13/98 20:25 cdaq Run 18413: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4305 03/13/98 19:26 koltenuk HMS dipole trip
  • 4304 03/13/98 19:24 cdaq Run 18412: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4303 03/13/98 18:55 cdaq Run 18411: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4302 03/13/98 17:53 cdaq Run 18410: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4301 03/13/98 17:29 cdaq Beam Time Accounting
  • 4300 03/13/98 17:10 cdaq Run 18409: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4299 03/13/98 17:08 oneill shift checklist
  • 4298 03/13/98 16:58 Cvxwrks BPM screen
  • 4297 03/13/98 16:35 cdaq Run 18408: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4296 03/13/98 16:23 cdaq Run 18407: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4295 03/13/98 16:21 johna hdc1x2 drifttime problem
  • 4294 03/13/98 16:08 johna Spikes in paw ntuples.
  • 4293 03/13/98 16:06 cdaq Target Shift Checklist
  • 4292 03/13/98 16:01 saw Shift summary
  • 4291 03/13/98 16:00 cdaq Beam Time Accounting
  • 4290 03/13/98 15:45 cdaq Run 18406: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4289 03/13/98 15:31 averys target encoder for z=0
  • 4288 03/13/98 15:19 cdaq Run 18405: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4287 03/13/98 14:56 cdaq Run 18404: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4286 03/13/98 14:47 cdaq Run 18403: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4285 03/13/98 14:40 Reinhold beam current on dummy
  • 4284 03/13/98 14:18 cdaq Run 18402: Pi+ production w=1.6 C12 (C4, z=0) 2pass
  • 4283 03/13/98 14:02 cdaq Run 18401: Pi+ production w=1.6 4cm dummy 2pass
  • 4282 03/13/98 13:47 cdaq Run 18400: Pi+ production w=1.6 4cm dummy 2pass
  • 4281 03/13/98 13:09 johna Change of drift chamber timing
  • 4280 03/13/98 11:58 saw Beam down
  • 4279 03/13/98 11:55 Reinhold New gscalers.param.18316
  • 4278 03/13/98 11:54 saw DAQ sync error run 18398
  • 4277 03/13/98 11:18 cdaq Run 18399: Pi+ production w=1.6 4cm dummy 2pass
  • 4276 03/13/98 10:43 cdaq Run 18398: Pi+ production w=1.6 4cm dummy 2pass
  • 4275 03/13/98 10:39 cdaq Run 18397: Pi+ production w=1.6 4cm dummy 2pass
  • 4274 03/13/98 10:31 saw Dummy run
  • 4273 03/13/98 08:51 cdaq Run 18396: Pi+ production w=1.6 LD 2pass
  • 4272 03/13/98 08:15 Reinhold Comment: Shift report
  • 4271 03/13/98 08:01 gaskell Shift Report
  • 4270 03/13/98 08:01 cdaq Beam Time Accounting
  • 4269 03/13/98 07:44 cdaq Run 18395: Pi+ production w=1.6 LD 2pass
  • 4268 03/13/98 07:36 cdaq Target Shift Checklist
  • 4267 03/13/98 07:34 cdaq Run 18394: Pi+ production w=1.6 LD 2pass
  • 4266 03/13/98 07:32 gaskell RunControl funny business
  • 4265 03/13/98 07:27 cdaq Run 18393: Pi+ production w=1.6 LD 2pass
  • 4264 03/13/98 07:07 gaskell BPM screen
  • 4263 03/13/98 07:05 gaskell ntuples and histos moved to work disk
  • 4262 03/13/98 06:45 gaskell Physicists in the mist:the sequel
  • 4261 03/13/98 06:34 cdaq Run 18392: Pi+ production w=1.6 LD 2pass
  • 4260 03/13/98 06:09 cdaq Run 18391: Pi+ production w=1.6 LD 2pass
  • 4259 03/13/98 04:04 gaskell changed Helium bottle
  • 4258 03/13/98 03:12 gaskell update
  • 4257 03/13/98 02:04 cdaq Run 18390: Pi+ production w=1.6 LD 2pass
  • 4256 03/13/98 02:03 cdaq Run 18389: Pi+ production w=1.6 LD 2pass
  • 4255 03/13/98 01:51 cdaq Run 18388: Pi+ production w=1.6 LD 2pass
  • 4254 03/13/98 01:28 gaskell Q3 trip
  • 4253 03/13/98 00:58 gaskell Runs 18380-18386 are H2 Pi+
  • 4252 03/13/98 00:51 cdaq Run 18387: Pi+ production w=1.6 LD 2pass
  • 4250 03/13/98 00:27 cdaq Run 18386: ps1=120 ps2=8000 ps3=1
  • 4251 03/13/98 00:27 gaskell changed hms thresholds
  • Thursday

  • 4248 03/12/98 23:56 cdaq Beam Time Accounting
  • 4249 03/12/98 23:55 baker Shift Report
  • 4247 03/12/98 23:51 cdaq Target Shift Checklist
  • 4246 03/12/98 23:46 cdaq Run 18385: ps1=120 ps2=8000 ps3=1
  • 4245 03/12/98 23:25 gaskell W=1.16 GeV Phase Space
  • 4244 03/12/98 22:49 cdaq Run 18384: ps1=120 ps2=8000 ps3=1
  • 4243 03/12/98 22:33 cdaq Run 18383: ps1=120 ps2=8000 ps3=1
  • 4242 03/12/98 22:21 cdaq Run 18382: ps1=120 ps2=8000 ps3=1
  • 4241 03/12/98 21:43 cdaq Run 18381: ps1=60 ps2=4000 ps3=1 first try at beam after maintenance day. 25 microamps of beam
  • 4240 03/12/98 21:27 cdaq Run 18380: ps1=20 ps2=40 ps3=1 first try at beam after maintenance day. 10 microamps of beam
  • 4239 03/12/98 16:14 saw Shift report
  • 4238 03/12/98 16:12 cdaq Beam Time Accounting
  • 4237 03/12/98 13:55 gaskell target temp camera
  • 4236 03/12/98 13:00 Mack ethane bottle changes
  • 4235 03/12/98 12:44 gaskell replaced ethane bottle
  • 4234 03/12/98 11:23 oneill Ethane running low
  • 4233 03/12/98 10:20 saw Target Checklist to elog restored
  • 4232 03/12/98 10:06 cdaq Target Shift Checklist
  • 4231 03/12/98 09:32 oneill HMS scint HV trip
  • 4230 03/12/98 08:12 ddutta shift report
  • 4229 03/12/98 00:13 baker shift summary
  • Wednesday

  • 4228 03/11/98 21:41 gaskell Restored HMS trigger to electron
  • 4227 03/11/98 20:33 Reinhold ups!
  • 4226 03/11/98 19:46 Reinhold F...!
  • 4225 03/11/98 19:40 Reinhold missing mass acceptance
  • 4224 03/11/98 19:30 johna paw output for online replay
  • 4223 03/11/98 16:46 johna Trigger change for cosmics run
  • 4222 03/11/98 15:36 cdaq Run 18379: Cosmic ray test run, ps1=1,ps2=1,ps3=1,ps4=1
  • 4221 03/11/98 15:11 beaufait aux heater controle target heaters
  • 4220 03/11/98 14:29 mack Old arc energy measurements: letter to students
  • 4219 03/11/98 14:21 saw Radiation Area boundary
  • 4218 03/11/98 12:17 Lassiter Carriage Rotation controls
  • 4217 03/11/98 12:06 Lassiter do not rotate HMS !!!
  • 4216 03/11/98 10:58 averys dipole trip problem.
  • 4215 03/11/98 10:48 averys hms dipole tripped
  • 4214 03/11/98 06:17 ddutta shift checklist
  • 4213 03/11/98 00:11 baker Physicists in the Mist!
  • Tuesday

  • 4212 03/10/98 23:45 gaskell shift checklist
  • 4211 03/10/98 15:49 Mack SOS ytarget reconstruction problem
  • 4210 03/10/98 12:14 Volmer ARC beam energy measurement
  • 4209 03/10/98 10:52 Mack Pre-Fpi arc energy errors. PRELIMINARY
  • 4208 03/10/98 07:05 Cha shift checklist
  • 4207 03/10/98 06:55 Ddutta Shift summary
  • 4206 03/10/98 06:48 cdaq Beam Time Accounting
  • 4205 03/10/98 06:43 H. Anklin BCM ratios cont.
  • 4204 03/10/98 06:39 H. Anklin BCM ratios
  • 4203 03/10/98 06:24 cdaq Run 18378: Pion coincidence data on Dummy, 20 muA
  • 4201 03/10/98 05:49 cdaq Run 18377: Pion coincidence data on LD2, 25 muA
  • 4202 03/10/98 05:49 Zihlmann dac problems
  • 4200 03/10/98 05:39 cdaq Run 18376: Pion coincidence data on LD2, 25 muA
  • 4199 03/10/98 05:27 cdaq Run 18375: Pion coincidence data on LD2, 25 muA
  • 4198 03/10/98 05:10 Anklin BCM drifts and paper chart
  • 4197 03/10/98 04:44 cdaq Run 18374: Pion coincidence data on LD2, 25 muA
  • 4196 03/10/98 03:56 cdaq Run 18373: Pion coincidence data on LD2, 25 muA
  • 4195 03/10/98 03:36 cdaq Run 18372: Pion coincidence data on LD2, 25 muA
  • 4194 03/10/98 03:17 Zihlmann HMS Q2 trip
  • 4193 03/10/98 03:10 Tadevosyan The BCM1/BCM2 ratio for Runs #18348-18366
  • 4192 03/10/98 03:03 Tadevosyan BCM1/BCM2 for Runs # 18348 -- 18366
  • 4191 03/10/98 02:58 Zihlmann dac crash
  • 4190 03/10/98 02:56 cdaq Run 18371: Pion coincidence data on LD2, 25 muA
  • 4189 03/10/98 02:42 cdaq Run 18370: Pion coincidence data on LD2, 25 muA
  • 4188 03/10/98 02:20 cdaq Run 18369: Pion coincidence data on LD2, 25 muA
  • 4187 03/10/98 01:54 V.Tadevosyan BCM1/BCM2 ratios for runs #18348-18366
  • 4186 03/10/98 01:44 cdaq Run 18368: Pion coincidence data on LH2, 25 muA
  • 4185 03/10/98 00:14 cdaq Run 18367: Pion coincidence data on LH2, 25 muA
  • 4184 03/10/98 00:04 Volmer Shift Summary
  • Monday

  • 4183 03/09/98 23:59 cdaq Beam Time Accounting
  • 4182 03/09/98 23:33 cdaq Run 18366: Pion coincidence data on LH2, 25 muA
  • 4181 03/09/98 22:56 cdaq Run 18365: Pion coincidence data on dummy, 25 muA
  • 4180 03/09/98 22:52 cdaq Run 18364: Pion coincidence data on dummy, prescaler test, 25 muA
  • 4179 03/09/98 22:40 Volmer ARC measurement postponed
  • 4178 03/09/98 22:19 cdaq Run 18363: Pion coincidence data on LH2, 25 muA
  • 4177 03/09/98 21:39 cdaq Run 18362: Pion coincidence data on LH2, 25 muA
  • 4176 03/09/98 20:44 cdaq Run 18361: Pion coincidence data on LH2, 25 muA
  • 4175 03/09/98 20:07 cdaq Run 18360: Pion coincidence data on D
  • 4174 03/09/98 19:56 J. Arrington Additinal missing HMS scalers
  • 4173 03/09/98 19:53 J. Arrington HMS hEL30 scaler change
  • 4172 03/09/98 19:48 cdaq Run 18359: Pion coincidence data on D
  • 4171 03/09/98 19:25 cdaq Run 18358: Pion coincidence data on D
  • 4170 03/09/98 18:39 cdaq Run 18357: Pion coincidence data on D
  • 4169 03/09/98 18:38 Volmer Run 18356: beam position jumped around
  • 4168 03/09/98 18:34 Pat BPM medm screen
  • 4167 03/09/98 18:29 cdaq Run 18356: Pion coincidence data on D
  • 4166 03/09/98 18:02 cdaq Run 18355: Pion coincidence data on D
  • 4165 03/09/98 17:45 cdaq Run 18354: Pion coincidence data on D
  • 4164 03/09/98 17:22 cdaq Run 18353: Pion coincidence data on D
  • 4163 03/09/98 16:15 Geesaman Shift Summary
  • 4162 03/09/98 16:13 cdaq Run 18352: Pion coincidence data on D
  • 4161 03/09/98 16:13 Volmer changed Ar bottle
  • 4160 03/09/98 16:07 cdaq Beam Time Accounting
  • 4159 03/09/98 16:06 cdaq Run 18351: Pion coincidence data on D
  • 4158 03/09/98 15:49 cdaq Run 18350: Pion coincidence data on D
  • 4157 03/09/98 15:46 cdaq Run 18349: Pion coincidence data on D
  • 4156 03/09/98 14:53 cdaq Run 18348: Pion coincidence data on H
  • 4155 03/09/98 14:40 cdaq Run 18347: Pion coincidence data on H
  • 4154 03/09/98 13:16 Cha Scaler analysis of target luminosity dependence
  • 4153 03/09/98 13:03 H. Anklin BCM1/BCM2 for the whole experiment
  • 4152 03/09/98 12:58 J. Arrington SOS trigger change
  • 4151 03/09/98 12:50 J. Arrington HMS SOS angles and momenta
  • 4150 03/09/98 12:00 H. Anklin BCM offsets and gains compared to recent calibration
  • 4149 03/09/98 11:34 cdaq Run 18346: Luminosity scan, 4cm LD2; 50muA, FR 1.5mm
  • 4147 03/09/98 11:10 H. Anklin BCM calibration analysis plots
  • 4146 03/09/98 11:10 cdaq Run 18345: Luminosity scan, 4cm LD2; 40muA, FR 1.5mm
  • 4148 03/09/98 11:10 H. Anklin BCM calibration analysis plots cont.
  • 4145 03/09/98 11:08 H. Anklin BCM Calibration analysis (run: 18316)
  • 4144 03/09/98 10:36 cdaq Run 18344: Luminosity scan, 4cm LD2; 30muA, FR 1.5mm
  • 4143 03/09/98 10:21 H. Anklin DAQ failure
  • 4142 03/09/98 10:07 cdaq Run 18343: Luminosity scan, 4cm LD2; 10 muA, FR 1.5mm
  • 4141 03/09/98 09:55 cdaq Run 18342: Luminosity scan, 4cm LH2, 19 deg; 50 muA, FR 1.5mm
  • 4140 03/09/98 09:23 cdaq Run 18341: Luminosity scan, 4cm LH2, 19 deg,0 muA, FR 1.5mm
  • 4139 03/09/98 08:51 cdaq Run 18340: Luminosity scan, 4cm LH2, 50 muA, FR 1.5mm
  • 4138 03/09/98 08:24 cdaq Run 18339: Luminosity scan, 4cm LH2, 40 muA, FR 1.5mm
  • 4137 03/09/98 08:13 ddutta shift report
  • 4136 03/09/98 07:58 cdaq Beam Time Accounting
  • 4135 03/09/98 07:57 H. Anklin Shift Check list and Argon pressure
  • 4134 03/09/98 07:57 cdaq Run 18338: Luminosity scan, 4cm LH2, 30 muA, FR 1.5mm
  • 4133 03/09/98 07:45 ddutta lD2 runs marked as lH2
  • 4132 03/09/98 07:41 H. Anklin He-flow
  • 4131 03/09/98 07:29 cdaq Run 18337: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4130 03/09/98 07:10 H. Anklin BPM medm screen
  • 4129 03/09/98 07:07 cdaq Run 18336: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4128 03/09/98 06:38 cdaq Run 18335: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4127 03/09/98 06:36 ddutta HMS hodo high voltage
  • 4126 03/09/98 03:39 cdaq Run 18334: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4125 03/09/98 02:57 cdaq Run 18333: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4124 03/09/98 02:33 cdaq Run 18332: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4123 03/09/98 02:28 cdaq Run 18331: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4122 03/09/98 01:51 cdaq Run 18330: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4121 03/09/98 01:16 cdaq Run 18329: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4120 03/09/98 01:05 cdaq Run 18328: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4119 03/09/98 00:36 cdaq Beam Time Accounting
  • 4118 03/09/98 00:27 cdaq Run 18327: Luminosity scan, 4cm LH2, 20 muA, FR 1.5mm
  • 4117 03/09/98 00:24 tadevosyan target lifting offset.
  • 4116 03/09/98 00:05 cdaq Run 18326: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
  • Sunday

  • 4115 03/08/98 23:39 cdaq Run 18325: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
  • 4114 03/08/98 23:37 Volmer cleared data disk 2
  • 4113 03/08/98 23:19 cdaq Run 18324: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
  • 4112 03/08/98 23:14 cdaq Run 18323: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
  • 4111 03/08/98 23:08 cdaq Run 18322: Luminosity scan, 4cm LH2, 10 muA, FR 1.5mm
  • 4110 03/08/98 22:44 cdaq Run 18321: FR mystery take 3, FR .5mm
  • 4109 03/08/98 22:39 cdaq Run 18320: FR mystery take 2, FR 1mm
  • 4108 03/08/98 22:28 gaskell harp scan: fast raster on
  • 4107 03/08/98 22:13 cdaq Run 18319: FR mystery
  • 4106 03/08/98 22:06 cdaq Run 18318: Run during Harp Scan, FR on?
  • 4105 03/08/98 21:21 Cuevas Target Fast Raster
  • 4104 03/08/98 20:35 ent SOS ytarget reconstruction
  • 4103 03/08/98 20:02 gaskell harp scans
  • 4102 03/08/98 19:28 cdaq Run 18317: Run during Harp Scan
  • 4101 03/08/98 18:45 Dunne Targets
  • 4100 03/08/98 17:28 Volmer HMS DC1x2 drift time problem
  • 4099 03/08/98 17:24 Volmer BCM calibration
  • 4098 03/08/98 16:55 cdaq Run 18316: BCM calibration, for real this time.
  • 4097 03/08/98 16:49 cdaq Run 18315: BCM calib
  • 4096 03/08/98 16:30 cdaq Run 18314: Short singles run to check spectrometers after beam
  • 4095 03/08/98 16:24 Geesaman Shift Summary
  • 4094 03/08/98 16:13 cdaq Run 18313: Short singles run to check spectrometers after beam
  • 4093 03/08/98 16:03 cdaq Beam Time Accounting
  • 4092 03/08/98 15:58 cdaq Run 18312: Short singles run to check spectrometers after beam
  • 4091 03/08/98 15:56 gaskell sos and hms thresholds
  • 4090 03/08/98 15:49 cdaq Run 18311: Short singles run to check spectrometers after beam
  • 4089 03/08/98 15:42 cdaq Run 18310: Short singles run to check spectrometers after beam
  • 4088 03/08/98 15:37 cdaq Run 18309: Short singles run to check spectrometers after beam
  • 4087 03/08/98 15:29 cdaq Run 18308: Short singles run to check spectrometers after beam
  • 4086 03/08/98 15:26 cdaq Run 18307: Short singles run to check spectrometers after beam
  • 4085 03/08/98 15:11 Geesaman Ready for beam
  • 4084 03/08/98 15:04 Dunne Target Warm Encoder Positions
  • 4083 03/08/98 13:57 Geesaman SOS angle limit switch moved,
  • 4082 03/08/98 12:54 dmckee Shift checklist
  • 4081 03/08/98 11:14 Reinhold DON'T FORGET TO LOG THE BPM SCREEN
  • 4080 03/08/98 10:09 GEESAMAN Sweep
  • 4079 03/08/98 08:51 cdaq Run 18306: production running 10 muA, target 12C z=0cm
  • 4078 03/08/98 08:25 zihlmann warm target positions
  • 4077 03/08/98 08:18 cdaq Beam Time Accounting
  • 4076 03/08/98 08:07 GEESAMAN Reboot HMS Q3 controller
  • 4075 03/08/98 08:04 GEESAMAN HMS Q3 trip
  • 4074 03/08/98 07:27 cdaq Run 18305: production running 20 muA, target 12C z=0cm
  • 4073 03/08/98 07:23 cdaq Run 18304: production running 10 muA, target 12C z=0cm
  • 4072 03/08/98 07:15 cdaq Run 18303: production running 10 muA, target 12C z=0cm
  • 4071 03/08/98 06:58 cdaq Run 18302: sieve slit, 20 muA, target 12C z=-6cm
  • 4070 03/08/98 06:35 averys sos limit switch
  • 4069 03/08/98 03:53 cdaq Run 18301: sieve slit, 20 muA, target 12C z=-6cm
  • 4068 03/08/98 03:42 cdaq Run 18300: sieve slit, 20 muA, target 12C z=+6cm
  • 4067 03/08/98 03:33 cdaq Run 18299: sieve slit, 20 muA, target 12C z=+4cm
  • 4066 03/08/98 03:22 cdaq Run 18298: sieve slit, 20 muA, target 12C z=0cm
  • 4065 03/08/98 02:36 cdaq Run 18297: sieve slit, 20 muA, target 12C z=0cm
  • 4064 03/08/98 02:27 cdaq Run 18296: sieve slit, 20 muA, target 12C z=+4cm
  • 4063 03/08/98 02:17 cdaq Run 18295: sieve slit, 20 muA, target 12C z=+6cm
  • 4062 03/08/98 02:03 cdaq Run 18294: sieve slit, 20 muA, target 12C z=-6cm
  • 4061 03/08/98 01:55 cdaq Run 18293: sieve slit, 20 muA, target 12C z=-4cm
  • 4060 03/08/98 01:53 cdaq Run 18292: sieve slit, 20 muA, target 12C z=-4cm
  • 4059 03/08/98 01:31 cdaq Run 18291: sieve slit, 20 muA, target 12C z=-4cm
  • 4057 03/08/98 00:32 cdaq Run 18290: sieve slit, 10 muA, target 12C z=+0cm
  • 4058 03/08/98 00:31 Volmer Shift Summary
  • 4056 03/08/98 00:29 Volmer new Fast Raster policy
  • 4055 03/08/98 00:18 cdaq Run 18289: HMS only electron singles, sieve slit, 10 muA, target 12C z=+6cm
  • 4054 03/08/98 00:07 cdaq Beam Time Accounting
  • 4053 03/08/98 00:02 cdaq Run 18288: HMS SOS electron singles, sieve slits, 20 muA, target 12C z=+4cm
  • Saturday

  • 4052 03/07/98 23:46 Reinhold D2 tank colt trap refilled
  • 4051 03/07/98 23:44 ZIHLMANN HMS SLIT PROBLEM
  • 4050 03/07/98 23:30 cdaq Run 18287: HMS only electron singles, sieve slit, 10 muA, target 12C z=+4cm
  • 4049 03/07/98 23:12 cdaq Run 18286: HMS only electron singles, sieve slit, 10 muA, target 12C z=-4cm
  • 4048 03/07/98 22:55 cdaq Run 18285: HMS only electron singles, sieve slit, 10 muA, target 12C z=-6 cm
  • 4047 03/07/98 22:53 Reinhold Runplan
  • 4046 03/07/98 22:52 cdaq Run 18284: HMS only electron singles, sieve slit, 10 muA, target 12C z=-6 cm
  • 4045 03/07/98 22:49 Reinhold Trigger Status
  • 4044 03/07/98 22:46 Reinhold Runplan 3/7-3/8
  • 4043 03/07/98 22:18 cdaq Run 18283: HMS only electron singles, sieve slit, 10 muA, target 12C z=0
  • 4042 03/07/98 21:53 cdaq Run 18282: electron singles, large colls, 10 muA, target 12C z=0
  • 4041 03/07/98 21:47 cdaq Run 18281: electron singles, large colls, 10 muA, target 12C z=0
  • 4040 03/07/98 18:18 Lassiter SOS rotation problem
  • 4039 03/07/98 17:27 gueye Superharp BLMs high voltage
  • 4038 03/07/98 16:04 geesaman Shift Summary Day Shift 7 March
  • 4037 03/07/98 15:54 geesaman Change SOS and HMS trigger
  • 4036 03/07/98 15:12 geesaman Ready to Close up Hall
  • 4035 03/07/98 09:38 cdaq Run 18280: cosmics run
  • 4034 03/07/98 09:06 Bryon Shift check list
  • Friday

  • 4033 03/06/98 21:30 Volmer Shift Summary
  • 4032 03/06/98 21:18 ent beam dump line o.k. again
  • 4031 03/06/98 16:48 bryon fixed a second base in HMS hodoscope plane
  • 4030 03/06/98 16:14 cdaq Run 18279: cosmics run
  • 4029 03/06/98 14:57 cdaq Run 18278: cosmics run
  • 4028 03/06/98 14:19 ent beam dump line still leaks
  • 4027 03/06/98 13:36 beaufait drift chamber hot channel
  • 4026 03/06/98 11:22 saw et al HMS WC fix
  • 4025 03/06/98 11:12 bryon HMS Scintillator base fixed, may have a broken glue joint
  • 4024 03/06/98 11:09 cdaq Run 18277: cosmics run
  • 4023 03/06/98 11:03 cdaq Run 18276: cosmics run
  • 4022 03/06/98 10:50 cdaq Run 18275: cosmic run again
  • 4021 03/06/98 10:28 cdaq Run 18274: cosmics run
  • 4020 03/06/98 10:23 cdaq Run 18273: DAQ restoration test. PMT's on. WC's off.
  • 4019 03/06/98 09:57 cdaq Run 18272: cosmics run.
  • 4018 03/06/98 09:12 cdaq Run 18271: DAQ restoration test. PMT's on. Cosmic Rays Run.
  • 4017 03/06/98 09:06 cdaq Run 18270: DAQ restoration test. PMT's on. Cosmic Rays Run.
  • 4016 03/06/98 08:33 gaskell shift checklist
  • 4015 03/06/98 08:25 cdaq Run 18269: DAQ restoration test. PMT's on. Cosmic Rays Run.
  • 4014 03/06/98 04:09 gabriel Beam pipe purging
  • 4013 03/06/98 01:31 gaskell Re-zeroed HMS hall probes
  • 4012 03/06/98 00:39 gaskell hms quad hall probes
  • Thursday

  • 4011 03/05/98 23:40 Ketevi Helium leak
  • 4010 03/05/98 17:23 cdaq Run 18268: DAQ restoration test. PMT's on.
  • 4009 03/05/98 16:07 Lassiter SOS small angles
  • 4008 03/05/98 15:47 cdaq Run 18267: Cosmic run. All detector on. 2/4 in HMS only
  • 4007 03/05/98 15:32 Bryon SOS Cerenkov Mirror positions
  • 4006 03/05/98 15:31 cdaq Run 18266: Cosmic run. All detector on. 2/4 in HMS only
  • 4005 03/05/98 15:22 cdaq Run 18265: Cosmic run. All detector on. 2/4 in HMS only
  • 4004 03/05/98 14:44 cdaq Run 18264: Cosmic run. All detector on. 2/4 in HMS only
  • 4003 03/05/98 13:18 Vulcan Gaussmeter
  • 4002 03/05/98 12:46 cdaq Run 18263: Cosmic run. All detector on. 2/4 in HMS and SOS.
  • 4001 03/05/98 12:08 cdaq Run 18262: Cosmic run. All detector on. 2/4 in HMS and SOS.
  • 4000 03/05/98 11:57 saw ROC 4 (SOS WC) gate cable replacement
  • 3999 03/05/98 11:50 cdaq Run 18261: SOS WC (ROC4) gate test.
  • 3998 03/05/98 11:39 cdaq Run 18260: SOS WC (ROC4) gate test.
  • 3997 03/05/98 11:04 mack WC gas inventory
  • 3996 03/05/98 10:14 gaskell SOS HV and SOS scin
  • 3995 03/05/98 09:32 bryon SOS HV problems
  • Wednesday

  • 3994 03/04/98 23:58 cdaq Run 18259: Cosmic run to look for single pe peak in HMS Cerenkov. All HMS detectors except for the WC turned on. All magnets
  • 3993 03/04/98 23:56 bryon SOS HV problems
  • 3992 03/04/98 23:16 cdaq Run 18258: Cosmic run to look for single pe peak in SOS and HMS
  • 3991 03/04/98 23:13 dmckee Shift checklist
  • 3990 03/04/98 18:53 bryon Changed HMS thresholds file
  • 3989 03/04/98 18:52 cdaq Run 18257: Cosmic run to look for single pe peak in SOS and HMS
  • 3988 03/04/98 18:39 cdaq Run 18256: Cosmic run to look for single pe peak in SOS and HMS
  • 3987 03/04/98 18:13 Bryon More SOS Cerenkov Results
  • 3986 03/04/98 16:40 Potterveld HMS dipole NMR
  • 3985 03/04/98 16:35 bryon more cosmic results
  • 3984 03/04/98 16:12 Potterveld SOS DC1 problems
  • 3983 03/04/98 15:24 Mack let's replace the cable
  • 3982 03/04/98 14:42 cdaq Run 18255: Quick, dirty Cosmic run. All detectors turned on. All
  • 3981 03/04/98 14:28 bryon SOS Cerenkov Calibrations
  • 3980 03/04/98 13:53 saw Target data in epicsLogger event
  • 3979 03/04/98 11:30 Cdaq Raster Epics variables
  • 3978 03/04/98 11:05 bryon results from the Cosmic runs
  • 3977 03/04/98 10:42 cdaq Run 18254: Cosmic run. All detectors turned on. All magnets
  • 3976 03/04/98 09:52 Mack New FR epics variable names.
  • Tuesday

  • 3975 03/03/98 22:08 dmckee Shift checklists 3/2 - 3/3
  • 3974 03/03/98 21:25 Ioana another shift checklist
  • 3973 03/03/98 19:56 bryon More Cosmics
  • 3972 03/03/98 19:53 cdaq Run 18253: Cosmic run. All detectors but WC urned on. All magnets
  • 3971 03/03/98 19:03 Bryon Cosmic run
  • 3970 03/03/98 18:55 cdaq Run 18252: Cosmic run. All detectors turned on. All magnets off.
  • 3969 03/03/98 16:59 saw Shift checklist
  • 3968 03/03/98 16:44 saw DAQ restored
  • 3967 03/03/98 16:42 cdaq Run 18251: DAQ restoration test. PMT's on. WC's off.
  • 3966 03/03/98 16:27 saw More DAQ trouble and question for run coordinator
  • 3965 03/03/98 15:42 cdaq Run 18250: SFI DAQ tests
  • 3964 03/03/98 15:20 saw DAQ problem (vmec7 not booting)
  • 3963 03/03/98 15:17 cdaq Run 18249: SFI DAQ tests
  • 3962 03/03/98 15:16 Potterveld SOS quad hall probe history
  • 3961 03/03/98 15:11 cdaq Run 18248: SFI DAQ tests
  • 3960 03/03/98 15:09 cdaq Run 18247: SFI DAQ tests
  • 3959 03/03/98 11:51 bryon Returned SOS trigger and turned off SOS Cerenkov HV
  • 3958 03/03/98 10:47 cdaq Run 18246: SOS Cerenkov cosmic test
  • 3957 03/03/98 10:24 cdaq Run 18245: SOS Cerenkov LED test
  • 3956 03/03/98 10:19 cdaq Run 18244: SOS Cerenkov LED test
  • 3955 03/03/98 10:16 cdaq Run 18243: SOS Cerenkov LED test
  • 3954 03/03/98 10:11 cdaq Run 18242: SOS Cerenkov LED test
  • 3953 03/03/98 10:00 cdaq Run 18241: SOS Cerenkov LED test
  • 3952 03/03/98 09:52 cdaq Run 18240: SOS Cerenkov LED test
  • 3951 03/03/98 08:32 gaskell shift checklist
  • Monday

  • 3950 03/02/98 23:12 dmckee Shift checklist, HMS fridge thermometer
  • 3949 03/02/98 23:02 bryon SOS Cerenkov HV on, Trigger changed
  • 3948 03/02/98 21:45 cdaq Run 18239: SOS Cerenkov LED test
  • 3947 03/02/98 21:38 cdaq Run 18238: SOS Cerenkov LED test
  • 3946 03/02/98 20:05 cdaq Run 18237: SOS Cerenkov LED test
  • 3945 03/02/98 19:52 cdaq Run 18236: SOS Cerenkov LED test
  • 3944 03/02/98 19:41 cdaq Run 18235: SOS Cerenkov LED test
  • 3943 03/02/98 18:18 Bryon Changed sos_thresholds.dat
  • 3942 03/02/98 17:27 Bryon shift check list
  • 3941 03/02/98 16:58 J. Volmer did checklist (gas)
  • 3940 03/02/98 15:09 Reinhold target survey 1/30 & 2/25
  • 3939 03/02/98 09:00 gaskell shift checklist
  • Sunday

  • 3938 03/01/98 22:32 dmckee Shift Checklists
  • 3937 03/01/98 21:57 Volmer shift checklist continuity

  • This file generated by /net/fs1/home/cdaq/hclog/src/hclogscript version HC1.4
    If you have any comments or problems, please contact:
    Jochen Volmer
    volmer@cebaf.gov
    (757) 269-5195