Layout 2009.gif

Subsystems

  1. Laser and Cavity
  2. Electron Detector
  3. Photon Detector
  4. Chicane

Data Acquisition

The data acquisition for the Compton polarimeter test stand is running on c-compton.jlab.org. There is a VNC server running on this machine using the standard cdaq password. Use vncviewer c-compton.jlab.org to access the desktop.

  1. Compton Data Acquisition Overview
  2. Electron Detector DAQ
  3. Photon Detector DAQ

Analysis

1. on-line analysis

2. off-line analysis

3. Simulation


Procedures

1. Shift crew procedures

2. Expert procedures

Working Group Meetings

  • November 8, 2009:
   9:00  Project Overview and Status (D. Gaskell) -->(pptx)
   9:20  Dipole and Chicane (DG for E. Ihloff)
   9:40  Laser Status (M. Dalton) --> (pdf)
  10:10  Electron Detector Overview (D. Dutta) --> (pdf)
  10:40  Electron detector readout (A. Narayan) --> (pptx, pdf)
  11:00  Photon Detector, readout, and analysis (W. Deconinck) --> (pdf)
  11:30  Polarimeter commissioning (All)