Difference between revisions of "Compton Polarimeter"

From PolWiki
Jump to navigationJump to search
Line 29: Line 29:
  
 
2. [[Expert procedures]]
 
2. [[Expert procedures]]
 +
 +
3. [[Compton re-start after beam off]]
  
 
== Q-weak Running ==
 
== Q-weak Running ==

Revision as of 10:07, 14 April 2011

Layout 2009.gif

Subsystems

  1. Laser and Cavity
  2. Electron Detector
  3. Photon Detector
  4. Chicane

Data Acquisition

The data acquisition for the Compton polarimeter test stand is running on c-compton.jlab.org. There is a VNC server running on this machine using the standard cdaq password. Use vncviewer c-compton.jlab.org to access the desktop.

  1. Compton Data Acquisition Overview
  2. Electron Detector DAQ
  3. Photon Detector DAQ

Analysis

1. on-line analysis

2. off-line analysis

3. Simulation


Procedures

1. Shift crew procedures

2. Expert procedures

3. Compton re-start after beam off

Q-weak Running

  1. Hardware changes
  1. Q-weak Runlist

Working Group Meetings

  • November 8, 2009:
   9:00  Project Overview and Status (D. Gaskell) -->(pptx)
   9:20  Dipole and Chicane (DG for E. Ihloff)
   9:40  Laser Status (M. Dalton) --> (pdf)
  10:10  Electron Detector Overview (D. Dutta) --> (pdf)
  10:40  Electron detector readout (A. Narayan) --> (pptx, pdf)
  11:00  Photon Detector, readout, and analysis (W. Deconinck) --> (pdf)
  11:30  Polarimeter commissioning (All)