Difference between revisions of "Compton Polarimeter"
From PolWiki
Jump to navigationJump to search(49 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
+ | [[Image:layout_2009.gif|800px]] | ||
+ | |||
== Subsystems == | == Subsystems == | ||
− | 1. [[ | + | # [[Compton_Polarimeter/Laser_and_Cavity|Laser and Cavity]] |
+ | # [[Electron Detector]] | ||
+ | # [[Photon Detector]] | ||
+ | # [[Chicane]] | ||
+ | |||
+ | ==Data Acquisition== | ||
+ | |||
+ | The data acquisition for the Compton polarimeter test stand is running on c-compton.jlab.org. There is a VNC server running on this machine using the standard cdaq password. Use <tt>vncviewer c-compton.jlab.org</tt> to access the desktop. | ||
+ | |||
+ | # [[Compton Data Acquisition Overview]] | ||
+ | # [[Electron Detector DAQ]] | ||
+ | # [[Photon Detector DAQ]] | ||
+ | |||
+ | ==Analysis== | ||
+ | |||
+ | 1. [[on-line analysis]] | ||
+ | |||
+ | 2. [[off-line analysis]] | ||
− | + | 3. [[Simulation]] | |
− | |||
− | + | == Procedures == | |
+ | |||
+ | 1. [[Shift crew procedures]] | ||
+ | |||
+ | 2. [[Expert procedures]] | ||
+ | |||
+ | 3. [[Beam off: Compton shut down and restart]] | ||
+ | |||
+ | == Q-weak Running == | ||
+ | |||
+ | # [[Hardware changes]] | ||
+ | |||
+ | # [[Q-weak Runlist]] | ||
== Working Group Meetings == | == Working Group Meetings == | ||
+ | |||
+ | * November 8, 2009: | ||
+ | |||
+ | 9:00 Project Overview and Status (D. Gaskell) -->([http://www.jlab.org/~gaskelld/gaskell_compton_pm_nov2009.pptx pptx]) | ||
+ | 9:20 Dipole and Chicane (DG for E. Ihloff) | ||
+ | 9:40 Laser Status (M. Dalton) --> ([http://www.jlab.org/~dalton/compton/dalton_hallc_compton_laser_8Nov2009.pdf pdf]) | ||
+ | 10:10 Electron Detector Overview (D. Dutta) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_102620/update112009.pdf pdf]) | ||
+ | 10:40 Electron detector readout (A. Narayan) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pptx pptx], [http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pdf pdf]) | ||
+ | 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> ([http://qweak.jlab.org/DocDB/0011/001126/001/photon-detector.pdf pdf]) | ||
+ | 11:30 Polarimeter commissioning (All) |
Latest revision as of 10:20, 14 April 2011
Subsystems
Data Acquisition
The data acquisition for the Compton polarimeter test stand is running on c-compton.jlab.org. There is a VNC server running on this machine using the standard cdaq password. Use vncviewer c-compton.jlab.org to access the desktop.
Analysis
3. Simulation
Procedures
3. Beam off: Compton shut down and restart
Q-weak Running
Working Group Meetings
- November 8, 2009:
9:00 Project Overview and Status (D. Gaskell) -->(pptx) 9:20 Dipole and Chicane (DG for E. Ihloff) 9:40 Laser Status (M. Dalton) --> (pdf) 10:10 Electron Detector Overview (D. Dutta) --> (pdf) 10:40 Electron detector readout (A. Narayan) --> (pptx, pdf) 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> (pdf) 11:30 Polarimeter commissioning (All)