* November 8, 2009:
 +
 +
  -  9:00  Project Overview and Status (D. Gaskell) -->([[http://www.jlab.org/~gaskelld/gaskell_compton_pm_nov2009.pptx pptx]])
 +
  -  9:20  Dipole and Chicane (DG for E. Ihloff)
 +
  -  9:40  Laser Status (M. Dalton) --> ([[http://www.jlab.org/~dalton/compton/dalton_hallc_compton_laser_8Nov2009.pdf pdf]])
 +
  - 10:10 Electron Detector Overview (D. Dutta) --> ([[http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_102620/update112009.pdf pdf]])
 +
  - 10:40 Electron detector readout (A. Narayan) --> ([[http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pptx pptx]], [[http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pdf pdf]])
 +
  - 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> ([[http://qweak.jlab.org/DocDB/0011/001126/001/photon-detector.pdf pdf]])
 +
  - 11:30 Polarimeter commissioning (All)

Revision as of 17:40, 7 January 2010

Layout 2009.gif

Subsystems

1. Laser and Cavity

2. Electron Detector

3. Photon Detector

4. Chicane


Analysis

1. on-line analysis

2. off-line analysis

3. Simulation


Working Group Meetings

  • November 8, 2009:
 -  9:00  Project Overview and Status (D. Gaskell) -->([pptx])
 -  9:20  Dipole and Chicane (DG for E. Ihloff)
 -  9:40  Laser Status (M. Dalton) --> ([pdf])
 - 10:10 Electron Detector Overview (D. Dutta) --> ([pdf])
 - 10:40 Electron detector readout (A. Narayan) --> ([pptx], [pdf])
 - 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> ([pdf])
 - 11:30 Polarimeter commissioning (All)