Difference between revisions of "Compton Polarimeter"
From PolWiki
Jump to navigationJump to searchLine 26: | Line 26: | ||
* November 8, 2009: | * November 8, 2009: | ||
− | + | 9:00 Project Overview and Status (D. Gaskell) -->([http://www.jlab.org/~gaskelld/gaskell_compton_pm_nov2009.pptx pptx]) | |
− | + | 9:20 Dipole and Chicane (DG for E. Ihloff) | |
− | + | 9:40 Laser Status (M. Dalton) --> ([http://www.jlab.org/~dalton/compton/dalton_hallc_compton_laser_8Nov2009.pdf pdf]) | |
− | + | 10:10 Electron Detector Overview (D. Dutta) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_102620/update112009.pdf pdf]) | |
− | + | 10:40 Electron detector readout (A. Narayan) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pptx pptx], [http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pdf pdf]) | |
− | + | 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> ([http://qweak.jlab.org/DocDB/0011/001126/001/photon-detector.pdf pdf]) | |
− | + | 11:30 Polarimeter commissioning (All) |
Revision as of 18:01, 7 January 2010
Subsystems
4. Chicane
Analysis
3. Simulation
Working Group Meetings
- November 8, 2009:
9:00 Project Overview and Status (D. Gaskell) -->(pptx) 9:20 Dipole and Chicane (DG for E. Ihloff) 9:40 Laser Status (M. Dalton) --> (pdf) 10:10 Electron Detector Overview (D. Dutta) --> (pdf) 10:40 Electron detector readout (A. Narayan) --> (pptx, pdf) 11:00 Photon Detector, readout, and analysis (W. Deconinck) --> (pdf) 11:30 Polarimeter commissioning (All)