Difference between revisions of "Compton Polarimeter"

From PolWiki
Jump to navigationJump to search
Line 26: Line 26:
 
* November 8, 2009:
 
* November 8, 2009:
  
    9:00  Project Overview and Status (D. Gaskell) -->([http://www.jlab.org/~gaskelld/gaskell_compton_pm_nov2009.pptx pptx])
+
    9:00  Project Overview and Status (D. Gaskell) -->([http://www.jlab.org/~gaskelld/gaskell_compton_pm_nov2009.pptx pptx])
    9:20  Dipole and Chicane (DG for E. Ihloff)
+
    9:20  Dipole and Chicane (DG for E. Ihloff)
    9:40  Laser Status (M. Dalton) --> ([http://www.jlab.org/~dalton/compton/dalton_hallc_compton_laser_8Nov2009.pdf pdf])
+
    9:40  Laser Status (M. Dalton) --> ([http://www.jlab.org/~dalton/compton/dalton_hallc_compton_laser_8Nov2009.pdf pdf])
 
   10:10  Electron Detector Overview (D. Dutta) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_102620/update112009.pdf pdf])
 
   10:10  Electron Detector Overview (D. Dutta) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_102620/update112009.pdf pdf])
 
   10:40  Electron detector readout (A. Narayan) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pptx pptx], [http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pdf pdf])
 
   10:40  Electron detector readout (A. Narayan) --> ([http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pptx pptx], [http://qweak.jlab.org/elog/DAQ+%26+Analysis/091108_095141/CP_WG_Nov_'09_2.pdf pdf])
 
   11:00  Photon Detector, readout, and analysis (W. Deconinck) --> ([http://qweak.jlab.org/DocDB/0011/001126/001/photon-detector.pdf pdf])
 
   11:00  Photon Detector, readout, and analysis (W. Deconinck) --> ([http://qweak.jlab.org/DocDB/0011/001126/001/photon-detector.pdf pdf])
 
   11:30  Polarimeter commissioning (All)
 
   11:30  Polarimeter commissioning (All)

Revision as of 14:27, 8 January 2010

Layout 2009.gif

Subsystems

1. Laser and Cavity

2. Electron Detector

3. Photon Detector

4. Chicane


Analysis

1. on-line analysis

2. off-line analysis

3. Simulation


Working Group Meetings

  • November 8, 2009:
   9:00  Project Overview and Status (D. Gaskell) -->(pptx)
   9:20  Dipole and Chicane (DG for E. Ihloff)
   9:40  Laser Status (M. Dalton) --> (pdf)
  10:10  Electron Detector Overview (D. Dutta) --> (pdf)
  10:40  Electron detector readout (A. Narayan) --> (pptx, pdf)
  11:00  Photon Detector, readout, and analysis (W. Deconinck) --> (pdf)
  11:30  Polarimeter commissioning (All)