August 10, 2022

From HallCWiki
Jump to: navigation, search

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • Pass change (5->4) completed yesterday.
  • Carbon hole check ok: https://logbooks.jlab.org/entry/4026613
  • Issues with SHMS dipole shortly after beam arrived: https://logbooks.jlab.org/entry/4026678
    • See special instructions below (and on sticky notes in CH) re: SHMS dipole
  • Completed Q2=2.45 W=3.2, middle epsilon, SHMS center
  • Started Q2=2.45 W=3.2, middle epsilon, SHMS left (achieved about 3/4 of reduced statistics goal) - VBV3H08 (big valve downstream of target) closed and would not open.

Current Run Plan

  • Wait for beamline valve fix
  • Rotate SHMS to 5.5 degrees
  • Continue with Q2=2.45 W=3.2, middle epsilon, SHMS right
  • Move on to Q2=3.85, W=3.07, low epsilon: SHMS right, center, left
    • Note: when rotating away from 5.5 degrees after SHMS right setting, will have to contact Steve Lassiter or Amy Comer to enable rotation
  • Have MCC perform arc energy measurement when convenient (sooner is better)
  • Beam off at 6:30 tomorrow for maintenance day

Notices in Effect for Shift Crew

  • If all SHMS magnets crash at the same time, push the SHMS dipole crash button (on the rack above the target heater manual controls and target temperature readbacks).
  • See Jacob's log entry about physics plotting script: https://logbooks.jlab.org/entry/4026914

Current Issues

  • Downstream beamline valve
  • Coffee maker broken! Emergency instant coffee in Counting House.
  • Shifts filled until August 14 - then we have OWL shifts available up to August 19. Lots of openings August 20++.

Planned Accesses to the Hall

  • Access today for valve repair and SHMS rotation
  • Maintenance day still scheduled for Thursday - Controlled Access planned
  • Aerogel change: if all goes extremely well, aerogel change could happen Friday. Otherwise, will take place Monday.

Planned Accelerator Configuration Changes

  • Pass change (4->3) next week. Right now, on the white board for Tuesday, August 16

Special Requests

  • Fix coffee machine, or replace.