Current Status

From HallCWiki
Jump to: navigation, search


2 Beam energy of 2.2 GeV

Done To Be Done

   2.1 Initial conditions
   2.2 Beam Checkout with Superharps and Beam Position Monitors
   2.3 Center beam on C-hole target
   2.4 Initial HMS/SHMS Detector Checkout
       2.4.1 Wire Chamber
       2.4.2 Shower Counter
       2.4.3 Scintillator
       2.4.4 Cerenkov
       2.4.5 Aerogel
   2.5 Initial checkout of SHMS/HMS tune
   2.6 Beam Energy Measurement
   2.7 Carbon 4.4 inelastic with HMS
   2.8 Fine tune SHMS with Carbon 4.4 inelastic -- Mark may wish to repeat this.
   2.9 SHMS Delta checkout with Carbon Elastic ground state -- in progress (Monday 11-Dec) using Carbon 4.4 inelastic
   2.10 SHMS/HMS Delta Matrix calibration
   2.11 1H(eep) Coincidence SHMS (proton) and HMS (electron)
   2.12 1H(eep) Coincidence SHMS (electron) and HMS (proton)
   2.13 SHMS Angle and Position Matrix Optimization

3 Beam energy of 6.4 GeV

   3.1 Initial conditions
   3.2 Superharp Scan
   3.3 SHMS Tune Verification
   3.4 Detailed Detector Checkout
       3.4.1 Wire Chamber
       3.4.2 Shower Counter Calibration Run
       3.4.3 Scintillator
       3.4.4 Cerenkov
       3.4.5 Aerogel
   3.5 Set Discriminator Thresholds for PID Trigger
   3.6 Defocused Tune for SHMS
   3.7 BCM Calibration
   3.8 Target boiling study
   3.9 Beam Energy Measurement
   3.10 1H or 12C(eep) [3 hr]
   3.11 1H or 12C(e, e’ π) [2 hr]
   3.12 1H(e’K) and 1H(e, e’K) [3 hr]
   3.13 Coincidence Checkout [16 hrs]
   3.14 Elastic p(ep) Checkout
   3.15 HMS/SHMS Angle and Position Matrix Optimization
   3.16 HMS Angle and position matrix optimization for large ytgt
   3.17 Use GEM to check out SHMS optics
   3.18 Check spectrometer pointing