December 1, 2022

From HallCWiki
Jump to: navigation, search

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ


Useful Links


Current Status

  • Still in Restricted access
  • Target Cool down is in process
  • Rough estimate ~6 - 8 pm to finish the cool down (but Dave pointed out that this is a very rough estimate)
    • Update, things are going well. Likely closer to 3 or 4 pm!
  • Handrails around pivot need to be removed and then spectrometer motion enabled (Thanks Burcu!)
    • Techs can remove the handrail and Steve L. can enable spectrometer motion
    • Spoke with Steve and will keep him updated in regards to the timeline
  • Magnet power supplies need to be turned on in the hall
  • Target Operational limits need to be updated (Dave Meekins after cool down?)
  • Need "guard" for hall sweep when transition to Power/Beam permit

Run Plan

  • Move SHMS to 8.00 degrees
  • SHMS momentum to -9.2 GeV
  • Move HMS to 20.00 degree
  • HMS momentum to +3.40 GeV (Positron running)
  • Beam and Target Checkout procedure: https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures
  • Beam checkout
    • Turn on all hodoscope and preshower HV
    • Harp scans --- 5 uA beam, Empty target
  • Position checkout
    • 5-10 uA cw with AL hole
    • 2x2 raster
  • After Beam and target checkout
    • Turn of SHMS S1x (1-7) and S2x (1-7) left and right hodoscope paddles
    • 4.15.2 Setting 1 ---- Swing Shift

Notes

  • SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.
  • HMS rotation to 20 deg: There is an increased chance that the rotation will get "stuck" and require expert intervention.
    • When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
    • When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
  • SHMS DAQ work during the Christmas break by Bob Michaels?

To do

  • Begin production data on target ladder 2