  • Moller Measurement yesterday, polarization = 86%
    • Beam recovery after Moller (mostly) smooth
    • Required MCC to reboot an ioc. This caused reboot of MCC ioc's
    • HMS Chamber 2V1 recovery slow (lingering structure in drift distance plot)
      • Chose to take 2 hour cosmic
    • Returned to run plan on LD2


Current Run Plan

Notices in Effect for Shift Crew

  • All shifts should come in as planned.
  • Heidi on vacation 7-13 Dec. Contact Steve L for cryo during that time.
    • cc Heidi on any cryo logbook entry (fansler@jlab.org)
  • Physically verify green led of gas flow and BCM temps in electronics room
  • Restore "Empty Water from Coffee Machine" to Shift Checklist (and do this!)
  • Record data rate (MBy/sec ) for each new run/config
  • Shift Leader: Record HMS (electron) tracking efficiency from each 50K replay report

Current Issues

  • On call list seems incomplete and should be addressed by the Hall: https://logbooks.jlab.org/entry/4230495
  • We need other indications of this interlock. In Hall A, we have it shut off detector HV via the alarm handler, and we have a flow rate alarm. Seems the useful PV values have not been working since 1-Sept.
  • NPS PMT/Base failures are propagating into columns 9 & 10


Planned Access to the Hall

Planned Accelerator Configuration Changes

  • We will run until 07:00 Dec 15.
    • Target will be warmed up and parked.
    • Hall will remain in Controlled Access until 07:00 Dec 19
    • Beam studies (Day Shift) Dec 19 will send beam into hall