Hall C Weekly Meeting - April 8, 2013

From HallCWiki
Jump to: navigation, search
  • Steven Smith
    • Gave a presentation on safety culture based on quarterly survey results
  • Andy Kenyon
    • Moving S4 green blocks out of hall and rebuilding electronics shield wall with larger S2 blocks.
    • Welding rod for cryo work is here. Starting to do welding work on C-can
  • Mike Fowler
    • Structure SOTR:
      • Structure contractor chosen but not awarded yet
      • Target platform delivered
      • Flexible Cryo line supports delivered
    • Design Projects:
      • SHMS spectrometer vacuum system
      • Swing & Barn door hardware
      • SHMS Cryo system
      • Paul at the the 12 GeV Temple review
  • Stephen Wood
    • Next Hall C User meeting will be in August. Users and staff can express date preferences at the doodle poll.

A discussion of the possibility of simplifying the 12 GeV cryogenics routing was held.