  • Andy Kenyon
    • Anaconda work
    • Vent A-can and pump down again
    • Checked with Radcon about the hot material on the HMS. Radcon would prefer not to move it. Should be fine to contact radcon when needed to access valves.
  • Mike Fowler - SOTR
    • Welded first two pieces together. Check by contractor welding inspector. Need to be improved.
    • After that do continue with next pieces.
  • Steve Lassiter - Engineering
    • Work on corrector magnets and shielding for the Compton beamline
    • work on cryo line, detector shield hut and chamber gas lines for SHMS.
    • Eric Sun working on dipole FEA
    • Paul Brindza will visit Q2/3 vendor this week.
  • Joe Beaufait
    • Needed to reorder the clamps for the HMS cable tray cover.
    • Work on replacing long power strips in damaged racks.