RC Meeting Information

Current RC: Iuliia Skorodumina

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

Useful Links

Summary

We got beam back yesterday (03/01) around 10am (https://logbooks.jlab.org/entry/4259268) and since then we have been taking data without major issues or interruptions. The beam delivery was good. We are still in KinC_x36_6 kinematics and planning on staying on it until Monday morning.

Day shift summary (https://logbooks.jlab.org/entry/4259169).

Swing shift summary (https://logbooks.jlab.org/entry/4259288).

Owl shift summary (https://logbooks.jlab.org/entry/4259437).

Yesterday we decided to have an RC meeting on Saturday (today) to discuss if we need to move the NPS for the next kinematic setting and also the background/currents/rates issues. See the following logentry from Charles on the matter (https://logbooks.jlab.org/entry/4258150) and also the logentry from Peter Bosted (https://logbooks.jlab.org/entry/4259621).

We will have an RC meeting today at 11 a.m.

Planned Access to the Hall

n/a

Accelerator

n/a

Current Run Plan

Current Issues

  • Hanjie was concerned that some NPS crates have relatively higher fan temperatures (~95F). We put box fans for those crates. We also asked Facilities if they can lower the AC set point from 68F to 65F (was done on Wed 02/28).
  • Yesterday (03/01) during Swing the heater power for both the loops 1 and 2 dropped to zero and recovered in a few minutes (https://logbooks.jlab.org/entry/4259365).

Future plans

  • Monday (03/04): Sweeper wings off (Walter).
  • Monday (03/04): Spectrometer rotations: To be done after taking the Wings off. HMS-SHMS separation needs to be certified in the hall (Steve L).
  • Moller measurement next week (probably Tuesday)