March 20, 2024
From HallCWiki
Contents
RC Meeting Information
Current RC: Rachel Montgomery (rmontgom@jlab.org)
RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)
- Zoom connection link: https://jlab-org.zoomgov.com/j/1617015555?pwd=L09IQ216dml6ZmM5ODExVjFsMX
- Meeting ID: 161 701 5555
- Passcode: 288953
Useful Links
- Short term run plan [1]
- Shift Signup (Read only)
- Hall-C Controls
- Hall-C Logbook
- MCC White Board
- Daily RC Reports
Summary
RC update 20th March: https://logbooks.jlab.org/entry/4269634
Planned Access to the Hall
Accelerator
MOmod tests were cancelled this morning due to a hardware issue. They won't plan to try it again any time soon (maybe in something like a couple of weeks).
Run Plan
- By beam off for Hall C laser issue, we had almost cycled through both b and a settings for KinC_x50_0. We are just missing the last coin run on LD2 for a.
- Charles then updated the run plan for the plan after beam return. See new short term run plan (it is updated online)
- Continue with at 3m and 14.4deg until change to new x60_1 setting.
- x50_0 ends Saturday morning.
- Discussion took place about whether to put NPS at 3m, 3.5m or 4m on Sat.
- Have option of taking 4m data at one angle of an and b to give reference to what is happening to crystals. Will do 3 m until tomorrow or fri then go to 4m and then sat change to next setting. Start next setting at 3m at angle close to now and think about 3.5m.
Requests for shift crew
- Please post screen shots to HCLOG as prompted in the run plan and of anything else appropriate that happens on shift.
Shift schedule
Looks good until Monday 25th March.