Overview of run plan
From HallCWiki
CT Experiment (E12-06-107) Run Plan Overview
Kinematics for the run
Q^2 | E_e | \theta_{HMS} | p_{HMS} | \theta_{SHMS} | p_{SHMS} | notes |
GeV^2 | GeV | deg | GeV/c | deg | GeV/c | |
8.01 | 6.4 | 45.07 | 2.131 | 17.13 | 5.122 | overlap with E94139, first 3 pass kinematics, 1% stat |
14.3 | 10.6 | 39.3 | 2.982 | 12.83 | 8.505 | First 5 pass kinematics 2-2.5% stat |
12.43 | 10.6 | 31.5 | 3.978 | 16.08 | 7.502 | Second 5 pass kine, run with 2% stat |
10.02 | 10.6 | 24.48 | 5.259 | 20.55 | 6.209 | Third 5 pass kine, run with 1.4% stat |
10.02 | 10.6 | 24.48 | 5.259 | 17.55 | 6.209 | proton angle scan, 2.5% stat (time permitting) |
10.02 | 10.6 | 24.48 | 5.259 | 23.55 | 6.209 | proton angle scan, 2.5% stat (time permitting) |
All time estimates in the overview assume 50% Hall C + Accelerator efficiency, including configuration change time and a beam current of 65 uA.
- Last shift before Experiment begins:
- All spectrometer magnets on to correct polarity and cycled to initial values. Spectrometers also at initial angles.
- Check that no new obstructions have appeared since the spectrometer angles were certified. For example, ladders, RadCon survey ropes, etc.
- Double-check HMS/SHMS Gas Cerenkov pressure is at correct value.
- Verify there are no obstructions between the detectors (ie, no WC covers, no dangling cables, etc.) on both spectrometers.
- Verify there are no unusual obstructions between the scattering chamber and the spectrometer front windows. Make sure any protective windows on the scattering chamber have been removed.
- Lock up the hall.
- Clean up the counting house. Make sure all terminals, consoles are alive and well.
- Take a cosmic run and look for problems.
- 6.4 GeV data taking: 60 beam hours scheduled, need 8 hrs for calibration and 52 hrs (at 50% eff.) for production.
- Verify Moller Quads (MQE3MO3) is at 180 A.
- Calibrations; 8 hours
- Verify magnets properly cycled - Beam energy measurement - Harp scan
- Detector checkout with 3/4 trigger, and long run for detector calibration
- BCM Calibration (unless one was completed very close to the start of experiment)
- elastic coincidences, (Heepcheck) at Q^2 =4.0 GeV^2, HMS at 4.263 GeV/c, 22.10 deg, SHMS at 2.928 GeV/c, 33.21 deg ,expected rate ~ few Hz \@ 65 uA current. (at least 3 hrs).}
- verify timing of all triggers
- Q^2=8.0 (GeV/c)^2 production, goal: 10000 cnts}
- LH + MT 12 hrs + 4 hrs
- C 36 hrs
- 10.6 GeV data taking: 300 beam hours scheduled, need 8 hrs for calibration and 292 hrs (at 50% eff.) for production.
- Calibrations 8 hours
- Verify magnets properly cycled - Beam energy measurement - Harp scan
- Detector checkout with 3/4 trigger, and long run for detector calibration
- BCM calibration
- elastic coincidences (Heepcheck) at Q^2 =9.5 GeV^2, HMS at 5.5394 GeV/c, 23.20 deg, SHMS at 5.9250 GeV/c, 21.61 deg ,expected rate ~ few Hz \@ 65 uA current. (at least 4 hrs)
- Q^2=14.3 (GeV/c)^2 production, goal: 2000 cnts}
- LH + MT 51 hrs + 17 hrs
- C 122 hrs
configuration change 5 hrs
- Q^2=12.43 (GeV/c)^2 production, goal: 2500 cnts
- LH + MT 12 hrs + 4 hrs
- C 24 hrs
configuration change 5 hrs
- Q^2=10.02 (GeV/c)^2 production, goal: 4500 cnts
- LH + MT 6 hrs + 2 hrs
- C 12.0 hrs
- Q^2=10.02 (GeV/c)^2 proton angle scan, goal: 2500 cnts
- C 12.0 hrs, proton angle scan 1, 2500 cnts
- C 20.0 hrs, proton angle scan 2, 2500 cnts