Line 19: Line 19:
  
 
==Field Measurements==
 
==Field Measurements==
 +
*; A1n Vertical Field Measurement (March 13th, 2019)
 +
https://logbooks.jlab.org/entry/3804362
  
 
==Plan for returning from COVID shutdown==
 
==Plan for returning from COVID shutdown==

Revision as of 21:21, 7 June 2020

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

Labview Program Guide

Field Measurements

  • A1n Vertical Field Measurement (March 13th, 2019)

https://logbooks.jlab.org/entry/3804362

Plan for returning from COVID shutdown

  • Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
  • Measure resistance to ground for both coils
  • Install latest new power supply, add additional circuitry
  • Test power supplies in both current and voltage control mode
  • Look at PS output on scope, with and without RF on.
  • Test NMR in both voltage and current mode
  • Ensure Labview is ready to go for either configuration

Manuals/Documentation