(Created page with "= RC Meeting Information = <b> RC Daily Meeting at 10:00 am, (remote) </b> * Bluejeans remote connection information: To join the Meeting: https://bluejeans.com/86143992...")
 
(Accelerator Status)
Line 24: Line 24:
  
 
= Accelerator Status =
 
= Accelerator Status =
*2 pass beam delivered to Hall B tagger
+
*Maintenance Day Today, followed by first beam to Hall B
* Box supply testing and turn on will be complete (all Arcs) September 4th
+
* Box supplies 1-7 ready.  8-10 being worked on
 
* 5-pass setup September 2nd - 5th
 
* 5-pass setup September 2nd - 5th
 
* Tune Beam to C September 6th
 
* Tune Beam to C September 6th

Revision as of 09:23, 31 August 2021

RC Meeting Information

RC Daily Meeting at 10:00 am, (remote)

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Accelerator Status

  • Maintenance Day Today, followed by first beam to Hall B
  • Box supplies 1-7 ready. 8-10 being worked on
  • 5-pass setup September 2nd - 5th
  • Tune Beam to C September 6th
  • Expected start of Physics: September 7th

Hall Status

  • Beam dump work completed last week
  • Radcon will need a couple days notice before beam goes to dump
  • SHMS 5.5 degree rotation test completed yesterday
  • SHMS Heavy Gas Cerenkov pumped and filled [1]
  • Checklist need to be completed next week before locking up the Hall (Friday??)
  • Target (cooldown?)

Notices in Effect for Shift Crew

  • Please read safety documentation (https://hallcweb.jlab.org/safety-docs/Fall2021/) and sign in the "yellow binder" in the Counting House
  • In the near future....vaccination cards must be submitted to Occupational Medicine in order to get site access. Or unvaccinated and undeclared users will need to have a negative test with 3 days of arrival to gain access and will need to be tested weekly. Occupation Medicine will be informing the user community as soon as the details are finalized.

Current Issues