Difference between revisions of "RC Meeting, Monday, September 13, 2021"

From HallCWiki
Jump to: navigation, search
(Useful Links)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
  
 
= Useful Links =
 
= Useful Links =
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-SPRING-2019 Summer 2019 Shift Schedule]
+
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT Autumn 2021 Shift Schedule]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Controls]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
Line 58: Line 58:
 
* Coverage on the RC phone in the counting house/hall sucks
 
* Coverage on the RC phone in the counting house/hall sucks
 
** Anyone on Sprint - How's your signal in those areas?
 
** Anyone on Sprint - How's your signal in those areas?
 +
* We need the cameras for the other halls back up on the screen
 +
** Need a shortcut for this on cvideo3?
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =

Latest revision as of 09:54, 13 September 2021

RC Meeting Information

RC Daily Meetings at 10:00, remote

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Weekend Status

  • Frustrating weekend
    • Lots of downtime due to accelerator issues
    • Good beam when we actually had it
  • Rotated SHMS to 6.26 degrees
    • Rates are high
    • 960 kHz S1X and 400k SHMS 3/4 at 10uA beam for positive polarity

Current Status

  • Down due to Hall D startup work
  • Should expect beam late evening/early morning

Current Run Plan

  • ~ 62k out of 100k from LD2+ run done
  • Need another 4 hours or so of beam on data
  • Switch to negative polarity after
    • To the spokespeople - Decisions to be made for negative polarity running, rates will be higher

Current Issues

  • Ongoing low HGC light issue
    • Software issue?
      • hcana "GoodHit" definitions?
      • FADC changes?
      • Other analyser updates?
    • Hardware issue?
      • Gas pressure?
      • Gas contamination?
      • Light leak?
  • Can try to address potential hardware causes today during downtime
  • Coverage on the RC phone in the counting house/hall sucks
    • Anyone on Sprint - How's your signal in those areas?
  • We need the cameras for the other halls back up on the screen
    • Need a shortcut for this on cvideo3?

Planned Accesses to the Hall

  • Controlled access from ~9am
  • Joe B will try to get the target camera going
  • Larry C wanted to take some measurements
  • From above, work to be done to rule out/fix a potential hardware cause for our HGC woes