= Hall C Status =
 
= Hall C Status =
# Production status
+
# Taking elastic singles
 +
# Last night downtime caused by:
 +
## Al dummy operational limit exceeded https://logbooks.jlab.org/entry/3938967
 +
## Loss of connection to cdaq, but Brad was able to resolve: https://logbooks.jlab.org/entry/3939223
 +
## Loss of communication with SHMS dipole, Ellen made access early this morning
  
 
= Current Run Plan =
 
= Current Run Plan =
# 3-pass physics run plan: production, elastic singles, delta scan
+
3-pass physics run plan:  
 +
# elastic singles  
 +
# (polarity change)
 +
# Heep coin 2 setting (run 13062) dummy run
 +
# delta scan: begin with SHMS part first
  
 
= Current Issues =
 
= Current Issues =
Line 21: Line 29:
  
 
= Special Requests =
 
= Special Requests =
# Hall Work tomorrow:  
+
Hall Work tomorrow:  
## aerogel change (Vladimir)
+
# aerogel change (Vladimir)
## target training (Greg)
+
# general work (Heidi)
## change to 5-pass (accelerator)
+
# change to 5-pass starting at 8:30 (accelerator)
  
 
= Useful Links =
 
= Useful Links =

Latest revision as of 11:11, 9 November 2021

RC Meeting Information

RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920 There is a 10:00 RC meeting today, 11/03/2021!

Accelerator Status

  1. Running beam to C and D (not sharing slit until after pass change)

Hall C Status

  1. Taking elastic singles
  2. Last night downtime caused by:
    1. Al dummy operational limit exceeded https://logbooks.jlab.org/entry/3938967
    2. Loss of connection to cdaq, but Brad was able to resolve: https://logbooks.jlab.org/entry/3939223
    3. Loss of communication with SHMS dipole, Ellen made access early this morning

Current Run Plan

3-pass physics run plan:

  1. elastic singles
  2. (polarity change)
  3. Heep coin 2 setting (run 13062) dummy run
  4. delta scan: begin with SHMS part first

Current Issues

  1. Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
  2. HMS Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping: https://logbooks.jlab.org/entry/3932992 .
  3. Serious HB LHe low liquid level alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
  4. Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
  5. Still running with no UPS on the SHMS cryo controls - Heidi replaced, but need to check charge https://logbooks.jlab.org/entry/3937512
  6. HCCAM02 not functioning (lift required to replace-Brad is tracking this replacement).

Special Requests

Hall Work tomorrow:

  1. aerogel change (Vladimir)
  2. general work (Heidi)
  3. change to 5-pass starting at 8:30 (accelerator)