= Notes =
 
= Notes =
 
* SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.
 
* SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.

Revision as of 10:45, 1 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ


Useful Links


Current Status

  • Still in Restricted access
  • Target Cool down is in process
  • Rough estimate ~6 - 8 pm to finish the cool down (but Dave pointed out that this is a very rough estimate)
    • Update, things are going well. Likely closer to 3 or 4 pm!
  • Handrails around pivot need to be removed and then spectrometer motion enabled (Thanks Burcu!)
    • Techs can remove the handrail and Steve L. can enable spectrometer motion
    • Spoke with Steve and will keep him updated in regards to the timeline
  • Magnet power supplies need to be turned on in the hall
  • Target Operational limits need to be updated (Dave Meekins after cool down?)
  • Need "guard" for hall sweep when transition to Power/Beam permit

Run Plan

  • Move SHMS to 8.00 degrees
  • SHMS momentum to -9.2 GeV
  • Move HMS to 20.00 degree
  • HMS momentum to +3.40 GeV (Positron running)
  • Beam and Target Checkout procedure: https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures
  • Beam checkout
    • Turn on all hodoscope and preshower HV
    • Harp scans --- 5 uA beam, Empty target
  • Position checkout
    • 5-10 uA cw with AL hole
    • 2x2 raster

Notes

  • SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.
  • HMS rotation to 20 deg: There is an increased chance that the rotation will get "stuck" and require expert intervention.
    • When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
    • When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
  • SHMS DAQ work during the Christmas break by Bob Michaels?

To do

  • Begin production data on target ladder 2