= Hall C Hypernuclear Experimental Readiness Review 2024 = | = Hall C Hypernuclear Experimental Readiness Review 2024 = | ||
− | + | ERR for the experiments E12-24-013, E12-24-011, E12-24-003, E12-24-004, and run group E12-20-013A/E12-15-008A. All experiments | |
+ | use a common beamline. target scattering chamber and target ladder. They all use the High-Resolution Electron Spectrometer (HES) and | ||
+ | High-Resolution Kaon Spectrometer (HKS). The HKS and HES magnets, support structure and detectors were used in earlier experiments that ran | ||
+ | Hall C. A new feature is Pair Charge Separation magnets (PCS). There are two of these magnet pairs. One of the PCS will be part of the HES magnet | ||
+ | setup and another PCS is part of the HKS magnet setup. The run group E12-20-013A/E12-15-008A can take data simultaneously with the other experiments | ||
+ | using the ENGE magnet in coincidence with the HKS. | ||
'''Time and Location''' | '''Time and Location''' | ||
* '''Date:''' November 18 and 19 , 2024 | * '''Date:''' November 18 and 19 , 2024 | ||
− | * '''Location:''' | + | * '''Location:''' Cebaf Center F-Wing F324-325 |
− | * '''ERR Charge:''' ([ Charge pdf]) | + | * '''ERR Charge:''' ([https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1267 Charge pdf]) |
− | * ''' ERR Committee:''' | + | * ''' ERR Report:''' [https://hallcweb.jlab.org/DocDB/0012/001285/002/Closeout%20Hall%20C-hypernuclei%20ERR_tw_v6.pdf ERR report] |
+ | * ''' ERR Committee:''' | ||
+ | Chris Keith (Target), Tim Whitlatch (Magnets) chair, Probir Goshal (Magnets), Eugene Pasyuk (Beamline), Yves Roblin (Beam Operation), | ||
+ | Hovanes Egiyan (Resources), Raffaella De Vita (Software), Mikhail Kostin (Radiation), Julia Watford (ES&H), Ed Folts (observer), Neville Malabre-O'Sullivan (observer) | ||
− | = | + | Monday Zoom link: [https://jlab-org.zoomgov.com/j/1610377881?pwd=1sJldhOVmwltrcE94F4p2XOGw9MJOi.1 Link to zoom] |
+ | Tuesday Zoom link: [https://jlab-org.zoomgov.com/j/1601618711 Link to zoom] | ||
− | |||
− | + | ==Agenda == | |
− | + | ||
− | + | ||
− | + | [https://hallcweb.jlab.org/doc-private/DocumentDatabase Document Database] | |
+ | === Monday November 18, 2024 === | ||
+ | ==== 8:30 (30) Executive Session ==== | ||
+ | ==== 9:00 First Morning Session ==== | ||
+ | * 9:00 (5) Opening and Charge - P. Rossi | ||
+ | * 9:05 (10+5) [https://hallcweb.jlab.org/DocDB/0012/001272/002/Hypernuclear-ERR-Nov_2024.pdf Hall C Long term Plans] - M. Jones | ||
+ | ** Short talk to give the long term schedule of Hall C and expected time for running the Hypernuclear experiments. | ||
+ | * 9:20 (15+10) Overview of all experiments - S.N. Nakamura [[File:ERR-SNN-20241118.pdf]] | ||
+ | ** Overview of experiments. | ||
+ | ** Overview beamline, scattering chamber, PCS1 + High-Resolution Kaon Spectrometer magnets and detectors , PCS2+ High-Resolution Electron Spectrometer magnets and detectors, ENGE. | ||
+ | ** Present tables of the beam specification, target specifications, magnet specifications and detector specifications. Overview of the commissioning plan and run plan. Details will be presented in separate talks. | ||
− | * 3: | + | ==== 9:45 Coffee Break ==== |
+ | ==== 10:00 Second Morning Session ==== | ||
+ | * 10:00 (30+30) [https://hallcweb.jlab.org/DocDB/0012/001273/002/hypernuclear_beamline_ERR_v2.pdf Beamline and beam requirements] Dave Gaskell | ||
+ | ** Describe how the beam specification requirements will be met. | ||
+ | ** Describe plans in accelerator to met the goals with timelines. | ||
+ | ** Describe any changes to the present beamline diagnostics. | ||
+ | ** Describe the calculations of the field in the region of the beam line and methods to mitigate the effects of the ENGE and other magnets on the beam. (charge 2) | ||
+ | ** Describe the beam commissioning plans and if machine protection systems are sufficient. (Charge 3) | ||
+ | * 11:00 (15+15) Targets and scattering chamber [https://hallcweb.jlab.org/wiki/index.php/File:HKS_Target.pdf HKS-target] (Charge 1a,1b) Dave Meekins | ||
+ | ** Describe timeline for purchasing target. Describe the target ladder and cooling. | ||
− | === | + | ==== 11:30-12:30 executive session ==== |
+ | ==== 12:30 First afternoon session ==== | ||
+ | * 12:30 (30+30) [https://hallcweb.jlab.org/DocDB/0012/001271/003/Hall%20C%20HyperNuclear%20ERR%202024.pdf Talk]; [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1271 All documents on Magnets and power supplies and Infrastructure] (Charge 1c,1d) Steve Lassiter | ||
+ | ** Describe the testing of the magnets. Plans and timeline for magnet power supplies and LCW. Describe cycling procedure. | ||
+ | ** Describe the new beamline, magnets stands, detector stands, bunker enclosures (Charge 1d) | ||
+ | * 1:30 (20+20) [https://hallcweb.jlab.org/DocDB/0012/001278/003/HKS-detectors_Gogami_20241118.pdf HKS+HES Detectors (charge 4)] Toshi Gogami | ||
− | * | + | ==== 2:10 (15) Coffee Break ==== |
+ | ==== 2:25 Second afternoon session ==== | ||
+ | * 2:25 (20+20) Enge Detectors (charge 4) Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001275/001/Enge%20Detector%20Nagao.pdf PDF] | ||
+ | * 3:05 (20+20) Overview of the commissioning plan (charge 4) Toshi Gogami and Sho Nagao | ||
+ | ** [https://hallcweb.jlab.org/DocDB/0012/001274/004/HKS_comm_Gogami_20241118.pdf Describe the detector commissioning and HES/HKS optics commissioning] Toshi Gogami | ||
+ | ** ENGE calibration with alpha-sources Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001276/001/Enge%20Commissioning%20Nagao.pdf PDF] | ||
+ | * 3:45 (15+15) [https://jeffersonlab-my.sharepoint.com/:p:/g/personal/camsonne_jlab_org/ESkRhXGGoEVCqLSfS3TWjJMBGQ9gIPhiu11K9WNwNkA7fg?e=A8LuY5 Trigger and Data acquisition] (charge 4) Alexandre Camsonne | ||
+ | ** Describe the trigger plans for HES/HKS and ENGE/HKS. Expected data acquisition data rates. | ||
− | * 10:25 (15) | + | ==== 4:15 (30) Executive session ==== |
+ | === Tuesday November 19, 2024 === | ||
+ | ==== 8:30 (30) Executive Session ==== | ||
+ | ==== 9:00-9:50 First Morning Session ==== | ||
+ | * 9:00 (15+10) Overview of experiment simulations Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001277/001/Simulation%20Nagao.pdf PDF] | ||
+ | ** Describe the simulation software and clearly explain how the assumed beam specification, target specifications, magnet specifications and detector specifications are incorporated into the simulation. (Charge 5) | ||
+ | * 9:25 (15+10) [https://hallcweb.jlab.org/DocDB/0012/001279/001/Hypernucleus_software_ERR.pdf Overview of Analysis Software] Sanghwa Park | ||
+ | ** Describe the analysis software status. Timeline and personnel for having software ready for experiment. (Charge 5) | ||
− | + | ==== 9:50 (15) Coffee Break ==== | |
+ | ==== 10:05 Second Morning Session ==== | ||
+ | * 10:05 (15+10) Overview of personnel and other resources S.N.Nakamura [[File:ERR-personnel-SNN-20241119.pdf]] | ||
+ | ** Are the manpower and other resources necessary to execute the experiments identified? Are the responsibilities for carrying out each job | ||
+ | assigned? Please provide a detailed and realistic evalution of the available FTE with names if possible. (charge 4) | ||
+ | * 10:30 (15+10) Overview of Radiation Levels [https://hallcweb.jlab.org/wiki/images/2/20/Pavel-HKS_ERR_Radiation_Draft.pdf Talk] (Pavel Degtiarenko) | ||
+ | ** Are the radiation levels expected to be generated in the hall acceptable? Is any local shielding required to minimize the effects of radiation in the equipment? (charge 6) | ||
+ | * 10:55 (15+5) Overview of safety documentation S.N.Nakamura [[File:ERR-documents-SNN-20241119.pdf]] | ||
+ | ** What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments? (charge 7) | ||
− | + | ==== 11:15-12:30 Executive Session & Lunch ==== | |
+ | ==== Closeout ==== | ||
== Documentation Drafts == | == Documentation Drafts == | ||
− | * Conduct of Operations (COO) | + | * Conduct of Operations (COO) Ref:[[File:E01-011-COO.pdf]] |
− | * Experiment Safety Assessment Document (ESAD) | + | * Experiment Safety Assessment Document (ESAD) Ref.[[File:E05-115-ESAD.pdf]] |
* Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG) | * Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG) | ||
* Experiment | * Experiment | ||
− | * Radiation Safety Assessment Document | + | * Radiation Safety Assessment Document |
− | + | ||
− | + | ||
− | + | ||
== Miscellaneous Materials == | == Miscellaneous Materials == | ||
* Installation schedule | * Installation schedule |
Latest revision as of 08:36, 22 November 2024
Contents
- 1 Hall C Hypernuclear Experimental Readiness Review 2024
- 1.1 Agenda
- 1.1.1 Monday November 18, 2024
- 1.1.1.1 8:30 (30) Executive Session
- 1.1.1.2 9:00 First Morning Session
- 1.1.1.3 9:45 Coffee Break
- 1.1.1.4 10:00 Second Morning Session
- 1.1.1.5 11:30-12:30 executive session
- 1.1.1.6 12:30 First afternoon session
- 1.1.1.7 2:10 (15) Coffee Break
- 1.1.1.8 2:25 Second afternoon session
- 1.1.1.9 4:15 (30) Executive session
- 1.1.2 Tuesday November 19, 2024
- 1.1.1 Monday November 18, 2024
- 1.2 Documentation Drafts
- 1.3 Miscellaneous Materials
- 1.1 Agenda
Hall C Hypernuclear Experimental Readiness Review 2024
ERR for the experiments E12-24-013, E12-24-011, E12-24-003, E12-24-004, and run group E12-20-013A/E12-15-008A. All experiments use a common beamline. target scattering chamber and target ladder. They all use the High-Resolution Electron Spectrometer (HES) and High-Resolution Kaon Spectrometer (HKS). The HKS and HES magnets, support structure and detectors were used in earlier experiments that ran Hall C. A new feature is Pair Charge Separation magnets (PCS). There are two of these magnet pairs. One of the PCS will be part of the HES magnet setup and another PCS is part of the HKS magnet setup. The run group E12-20-013A/E12-15-008A can take data simultaneously with the other experiments using the ENGE magnet in coincidence with the HKS.
Time and Location
- Date: November 18 and 19 , 2024
- Location: Cebaf Center F-Wing F324-325
- ERR Charge: (Charge pdf)
- ERR Report: ERR report
- ERR Committee:
Chris Keith (Target), Tim Whitlatch (Magnets) chair, Probir Goshal (Magnets), Eugene Pasyuk (Beamline), Yves Roblin (Beam Operation), Hovanes Egiyan (Resources), Raffaella De Vita (Software), Mikhail Kostin (Radiation), Julia Watford (ES&H), Ed Folts (observer), Neville Malabre-O'Sullivan (observer)
Monday Zoom link: Link to zoom Tuesday Zoom link: Link to zoom
Agenda
Monday November 18, 2024
8:30 (30) Executive Session
9:00 First Morning Session
- 9:00 (5) Opening and Charge - P. Rossi
- 9:05 (10+5) Hall C Long term Plans - M. Jones
- Short talk to give the long term schedule of Hall C and expected time for running the Hypernuclear experiments.
- 9:20 (15+10) Overview of all experiments - S.N. Nakamura File:ERR-SNN-20241118.pdf
- Overview of experiments.
- Overview beamline, scattering chamber, PCS1 + High-Resolution Kaon Spectrometer magnets and detectors , PCS2+ High-Resolution Electron Spectrometer magnets and detectors, ENGE.
- Present tables of the beam specification, target specifications, magnet specifications and detector specifications. Overview of the commissioning plan and run plan. Details will be presented in separate talks.
9:45 Coffee Break
10:00 Second Morning Session
- 10:00 (30+30) Beamline and beam requirements Dave Gaskell
- Describe how the beam specification requirements will be met.
- Describe plans in accelerator to met the goals with timelines.
- Describe any changes to the present beamline diagnostics.
- Describe the calculations of the field in the region of the beam line and methods to mitigate the effects of the ENGE and other magnets on the beam. (charge 2)
- Describe the beam commissioning plans and if machine protection systems are sufficient. (Charge 3)
- 11:00 (15+15) Targets and scattering chamber HKS-target (Charge 1a,1b) Dave Meekins
- Describe timeline for purchasing target. Describe the target ladder and cooling.
11:30-12:30 executive session
12:30 First afternoon session
- 12:30 (30+30) Talk; All documents on Magnets and power supplies and Infrastructure (Charge 1c,1d) Steve Lassiter
- Describe the testing of the magnets. Plans and timeline for magnet power supplies and LCW. Describe cycling procedure.
- Describe the new beamline, magnets stands, detector stands, bunker enclosures (Charge 1d)
- 1:30 (20+20) HKS+HES Detectors (charge 4) Toshi Gogami
2:10 (15) Coffee Break
2:25 Second afternoon session
- 2:25 (20+20) Enge Detectors (charge 4) Sho Nagao PDF
- 3:05 (20+20) Overview of the commissioning plan (charge 4) Toshi Gogami and Sho Nagao
- Describe the detector commissioning and HES/HKS optics commissioning Toshi Gogami
- ENGE calibration with alpha-sources Sho Nagao PDF
- 3:45 (15+15) Trigger and Data acquisition (charge 4) Alexandre Camsonne
- Describe the trigger plans for HES/HKS and ENGE/HKS. Expected data acquisition data rates.
4:15 (30) Executive session
Tuesday November 19, 2024
8:30 (30) Executive Session
9:00-9:50 First Morning Session
- 9:00 (15+10) Overview of experiment simulations Sho Nagao PDF
- Describe the simulation software and clearly explain how the assumed beam specification, target specifications, magnet specifications and detector specifications are incorporated into the simulation. (Charge 5)
- 9:25 (15+10) Overview of Analysis Software Sanghwa Park
- Describe the analysis software status. Timeline and personnel for having software ready for experiment. (Charge 5)
9:50 (15) Coffee Break
10:05 Second Morning Session
- 10:05 (15+10) Overview of personnel and other resources S.N.Nakamura File:ERR-personnel-SNN-20241119.pdf
- Are the manpower and other resources necessary to execute the experiments identified? Are the responsibilities for carrying out each job
assigned? Please provide a detailed and realistic evalution of the available FTE with names if possible. (charge 4)
- 10:30 (15+10) Overview of Radiation Levels Talk (Pavel Degtiarenko)
- Are the radiation levels expected to be generated in the hall acceptable? Is any local shielding required to minimize the effects of radiation in the equipment? (charge 6)
- 10:55 (15+5) Overview of safety documentation S.N.Nakamura File:ERR-documents-SNN-20241119.pdf
- What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments? (charge 7)
11:15-12:30 Executive Session & Lunch
Closeout
Documentation Drafts
- Conduct of Operations (COO) Ref:File:E01-011-COO.pdf
- Experiment Safety Assessment Document (ESAD) Ref.File:E05-115-ESAD.pdf
- Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
- Experiment
- Radiation Safety Assessment Document
Miscellaneous Materials
- Installation schedule