* '''Date:''' November 18 and 19 , 2024
 
* '''Date:''' November 18 and 19 , 2024
 
* '''Location:''' Cebaf Center F-Wing  F324-325
 
* '''Location:''' Cebaf Center F-Wing  F324-325
* '''ERR Charge:''' ([https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1267 Charge pdf])   
+
* '''ERR Charge:''' ([https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1267 Charge pdf])  
 +
* ''' ERR Report:''' [https://hallcweb.jlab.org/DocDB/0012/001285/002/Closeout%20Hall%20C-hypernuclei%20ERR_tw_v6.pdf  ERR report]
 
* ''' ERR Committee:'''   
 
* ''' ERR Committee:'''   
  
 
Chris Keith (Target), Tim Whitlatch (Magnets) chair, Probir Goshal (Magnets), Eugene Pasyuk (Beamline), Yves Roblin (Beam Operation),
 
Chris Keith (Target), Tim Whitlatch (Magnets) chair, Probir Goshal (Magnets), Eugene Pasyuk (Beamline), Yves Roblin (Beam Operation),
 
Hovanes Egiyan (Resources), Raffaella De Vita (Software), Mikhail Kostin (Radiation), Julia Watford (ES&H),  Ed Folts (observer), Neville Malabre-O'Sullivan (observer)
 
Hovanes Egiyan (Resources), Raffaella De Vita (Software), Mikhail Kostin (Radiation), Julia Watford (ES&H),  Ed Folts (observer), Neville Malabre-O'Sullivan (observer)
 +
 +
Monday Zoom link: [https://jlab-org.zoomgov.com/j/1610377881?pwd=1sJldhOVmwltrcE94F4p2XOGw9MJOi.1 Link to zoom]
 +
Tuesday Zoom link: [https://jlab-org.zoomgov.com/j/1601618711 Link to zoom]
 +
  
 
==Agenda ==
 
==Agenda ==
Line 27: Line 32:
 
* 9:05 (10+5) [https://hallcweb.jlab.org/DocDB/0012/001272/002/Hypernuclear-ERR-Nov_2024.pdf Hall C Long term Plans]  - M. Jones
 
* 9:05 (10+5) [https://hallcweb.jlab.org/DocDB/0012/001272/002/Hypernuclear-ERR-Nov_2024.pdf Hall C Long term Plans]  - M. Jones
 
** Short talk to give the long term schedule of Hall C and expected time for running the Hypernuclear experiments.
 
** Short talk to give the long term schedule of Hall C and expected time for running the Hypernuclear experiments.
* 9:20 (15+10) Overview of all experiments - S.N. Nakamura [[File:ERR-SNN-20241111.pdf]]
+
* 9:20 (15+10) Overview of all experiments - S.N. Nakamura [[File:ERR-SNN-20241118.pdf]]
 
** Overview of experiments.
 
** Overview of experiments.
 
** Overview beamline, scattering chamber, PCS1 + High-Resolution Kaon Spectrometer magnets and detectors , PCS2+ High-Resolution Electron Spectrometer magnets and detectors, ENGE.  
 
** Overview beamline, scattering chamber, PCS1 + High-Resolution Kaon Spectrometer magnets and detectors , PCS2+ High-Resolution Electron Spectrometer magnets and detectors, ENGE.  
Line 40: Line 45:
 
** Describe the calculations of the field in the region of the beam line and methods to mitigate the effects of the ENGE and other magnets on the beam. (charge 2)
 
** Describe the calculations of the field in the region of the beam line and methods to mitigate the effects of the ENGE and other magnets on the beam. (charge 2)
 
** Describe the beam commissioning plans and if machine protection systems are sufficient. (Charge 3)
 
** Describe the beam commissioning plans and if machine protection systems are sufficient. (Charge 3)
* 11:00 (15+15) Targets and scattering chamber (Charge 1a,1b) Dave Meekins
+
* 11:00 (15+15) Targets and scattering chamber [https://hallcweb.jlab.org/wiki/index.php/File:HKS_Target.pdf HKS-target] (Charge 1a,1b) Dave Meekins
 
** Describe timeline for purchasing target. Describe the target ladder and cooling.
 
** Describe timeline for purchasing target. Describe the target ladder and cooling.
  
 
==== 11:30-12:30 executive session  ====
 
==== 11:30-12:30 executive session  ====
 
==== 12:30 First afternoon session ====
 
==== 12:30 First afternoon session ====
* 12:30 (30+30) Magnets and power supplies and Infrastructure  (Charge 1c,1d)    Steve Lassiter
+
* 12:30 (30+30) [https://hallcweb.jlab.org/DocDB/0012/001271/003/Hall%20C%20HyperNuclear%20ERR%202024.pdf Talk]; [https://hallcweb.jlab.org/doc-private/ShowDocument?docid=1271 All documents on Magnets and power supplies and Infrastructure] (Charge 1c,1d)    Steve Lassiter
 
** Describe the testing of the magnets. Plans and timeline for magnet power supplies and LCW. Describe cycling procedure.  
 
** Describe the testing of the magnets. Plans and timeline for magnet power supplies and LCW. Describe cycling procedure.  
 
** Describe the new beamline, magnets stands, detector stands, bunker enclosures (Charge 1d)
 
** Describe the new beamline, magnets stands, detector stands, bunker enclosures (Charge 1d)
* 1:30 (20+20) HKS+HES  Detectors (charge 4) Toshi Gogami
+
* 1:30 (20+20) [https://hallcweb.jlab.org/DocDB/0012/001278/003/HKS-detectors_Gogami_20241118.pdf HKS+HES  Detectors (charge 4)] Toshi Gogami
 +
 
 
==== 2:10 (15) Coffee Break ====
 
==== 2:10 (15) Coffee Break ====
 
==== 2:25 Second afternoon session ====
 
==== 2:25 Second afternoon session ====
* 2:25 (20+20) Enge Detectors (charge 4) Sho Nagao
+
* 2:25 (20+20) Enge Detectors (charge 4) Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001275/001/Enge%20Detector%20Nagao.pdf PDF]
 
* 3:05 (20+20) Overview of the commissioning plan (charge 4)  Toshi Gogami and Sho Nagao
 
* 3:05 (20+20) Overview of the commissioning plan (charge 4)  Toshi Gogami and Sho Nagao
** Describe the detector commissioning and HES/HKS optics commissioning Toshi Gogami
+
** [https://hallcweb.jlab.org/DocDB/0012/001274/004/HKS_comm_Gogami_20241118.pdf Describe the detector commissioning and HES/HKS optics commissioning] Toshi Gogami
** ENGE calibration with alpha-sources Sho Nagao
+
** ENGE calibration with alpha-sources Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001276/001/Enge%20Commissioning%20Nagao.pdf PDF]
* 3:45 (15+15) Trigger and Data acquisition (charge 4)  Alexandre Camsonne
+
* 3:45 (15+15) [https://jeffersonlab-my.sharepoint.com/:p:/g/personal/camsonne_jlab_org/ESkRhXGGoEVCqLSfS3TWjJMBGQ9gIPhiu11K9WNwNkA7fg?e=A8LuY5 Trigger and Data acquisition] (charge 4)  Alexandre Camsonne
 
** Describe the trigger plans for HES/HKS and ENGE/HKS. Expected data acquisition data rates.
 
** Describe the trigger plans for HES/HKS and ENGE/HKS. Expected data acquisition data rates.
  
Line 62: Line 68:
 
==== 8:30 (30) Executive Session ====
 
==== 8:30 (30) Executive Session ====
 
==== 9:00-9:50 First Morning Session ====
 
==== 9:00-9:50 First Morning Session ====
* 9:00 (15+10) Overview of experiment simulations Sho Nagao
+
* 9:00 (15+10) Overview of experiment simulations Sho Nagao [https://hallcweb.jlab.org/DocDB/0012/001277/001/Simulation%20Nagao.pdf PDF]
 
** Describe the simulation software and clearly explain how the assumed  beam specification, target specifications, magnet specifications and  detector specifications are incorporated into the simulation. (Charge 5)
 
** Describe the simulation software and clearly explain how the assumed  beam specification, target specifications, magnet specifications and  detector specifications are incorporated into the simulation. (Charge 5)
* 9:25 (15+10) Overview of Analysis Software Sanghwa Park
+
* 9:25 (15+10) [https://hallcweb.jlab.org/DocDB/0012/001279/001/Hypernucleus_software_ERR.pdf Overview of Analysis Software] Sanghwa Park
 
** Describe the analysis software status. Timeline and personnel for having software ready for experiment. (Charge 5)
 
** Describe the analysis software status. Timeline and personnel for having software ready for experiment. (Charge 5)
 +
 
==== 9:50 (15) Coffee Break ====
 
==== 9:50 (15) Coffee Break ====
 
==== 10:05 Second Morning Session ====
 
==== 10:05 Second Morning Session ====
* 10:05 (15+10) Overview of personnel and other resources
+
* 10:05 (15+10) Overview of personnel and other resources S.N.Nakamura [[File:ERR-personnel-SNN-20241119.pdf]]
 
** Are the manpower and other resources necessary to execute the experiments identified? Are the responsibilities for carrying out each job  
 
** Are the manpower and other resources necessary to execute the experiments identified? Are the responsibilities for carrying out each job  
 
assigned?  Please provide  a detailed and realistic evalution of the  available FTE with names if possible. (charge 4)
 
assigned?  Please provide  a detailed and realistic evalution of the  available FTE with names if possible. (charge 4)
* 10:30 (15+10) Overview of Radiation Levels (Pavel Degtiarenko)
+
* 10:30 (15+10) Overview of Radiation Levels [https://hallcweb.jlab.org/wiki/images/2/20/Pavel-HKS_ERR_Radiation_Draft.pdf Talk] (Pavel Degtiarenko)
 
** Are the radiation levels expected to be generated in the hall acceptable? Is any local shielding required to minimize the effects of radiation in the equipment? (charge 6)
 
** Are the radiation levels expected to be generated in the hall acceptable? Is any local shielding required to minimize the effects of radiation in the equipment? (charge 6)
* 10:55 (15+5) Overview of safety documentation  
+
* 10:55 (15+5) Overview of safety documentation S.N.Nakamura [[File:ERR-documents-SNN-20241119.pdf]]
 
** What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments? (charge 7)
 
** What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments? (charge 7)
  
Line 81: Line 88:
 
== Documentation Drafts ==
 
== Documentation Drafts ==
  
* Conduct of Operations (COO)
+
* Conduct of Operations (COO)   Ref:[[File:E01-011-COO.pdf]]
*  Experiment Safety Assessment Document (ESAD)
+
*  Experiment Safety Assessment Document (ESAD)   Ref.[[File:E05-115-ESAD.pdf]]
 
*  Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
 
*  Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
 
* Experiment   
 
* Experiment   
*  Radiation Safety Assessment Document  
+
*  Radiation Safety Assessment Document
 
+
 
+
 
+
  
 
== Miscellaneous Materials ==
 
== Miscellaneous Materials ==
 
* Installation schedule
 
* Installation schedule

Latest revision as of 08:36, 22 November 2024

Hall C Hypernuclear Experimental Readiness Review 2024

ERR for the experiments E12-24-013, E12-24-011, E12-24-003, E12-24-004, and run group E12-20-013A/E12-15-008A. All experiments use a common beamline. target scattering chamber and target ladder. They all use the High-Resolution Electron Spectrometer (HES) and High-Resolution Kaon Spectrometer (HKS). The HKS and HES magnets, support structure and detectors were used in earlier experiments that ran Hall C. A new feature is Pair Charge Separation magnets (PCS). There are two of these magnet pairs. One of the PCS will be part of the HES magnet setup and another PCS is part of the HKS magnet setup. The run group E12-20-013A/E12-15-008A can take data simultaneously with the other experiments using the ENGE magnet in coincidence with the HKS.

Time and Location

  • Date: November 18 and 19 , 2024
  • Location: Cebaf Center F-Wing F324-325
  • ERR Charge: (Charge pdf)
  • ERR Report: ERR report
  • ERR Committee:

Chris Keith (Target), Tim Whitlatch (Magnets) chair, Probir Goshal (Magnets), Eugene Pasyuk (Beamline), Yves Roblin (Beam Operation), Hovanes Egiyan (Resources), Raffaella De Vita (Software), Mikhail Kostin (Radiation), Julia Watford (ES&H), Ed Folts (observer), Neville Malabre-O'Sullivan (observer)

Monday Zoom link: Link to zoom Tuesday Zoom link: Link to zoom


Agenda

Document Database

Monday November 18, 2024

8:30 (30) Executive Session

9:00 First Morning Session

  • 9:00 (5) Opening and Charge - P. Rossi
  • 9:05 (10+5) Hall C Long term Plans - M. Jones
    • Short talk to give the long term schedule of Hall C and expected time for running the Hypernuclear experiments.
  • 9:20 (15+10) Overview of all experiments - S.N. Nakamura File:ERR-SNN-20241118.pdf
    • Overview of experiments.
    • Overview beamline, scattering chamber, PCS1 + High-Resolution Kaon Spectrometer magnets and detectors , PCS2+ High-Resolution Electron Spectrometer magnets and detectors, ENGE.
    • Present tables of the beam specification, target specifications, magnet specifications and detector specifications. Overview of the commissioning plan and run plan. Details will be presented in separate talks.

9:45 Coffee Break

10:00 Second Morning Session

  • 10:00 (30+30) Beamline and beam requirements Dave Gaskell
    • Describe how the beam specification requirements will be met.
    • Describe plans in accelerator to met the goals with timelines.
    • Describe any changes to the present beamline diagnostics.
    • Describe the calculations of the field in the region of the beam line and methods to mitigate the effects of the ENGE and other magnets on the beam. (charge 2)
    • Describe the beam commissioning plans and if machine protection systems are sufficient. (Charge 3)
  • 11:00 (15+15) Targets and scattering chamber HKS-target (Charge 1a,1b) Dave Meekins
    • Describe timeline for purchasing target. Describe the target ladder and cooling.

11:30-12:30 executive session

12:30 First afternoon session

2:10 (15) Coffee Break

2:25 Second afternoon session

4:15 (30) Executive session

Tuesday November 19, 2024

8:30 (30) Executive Session

9:00-9:50 First Morning Session

  • 9:00 (15+10) Overview of experiment simulations Sho Nagao PDF
    • Describe the simulation software and clearly explain how the assumed beam specification, target specifications, magnet specifications and detector specifications are incorporated into the simulation. (Charge 5)
  • 9:25 (15+10) Overview of Analysis Software Sanghwa Park
    • Describe the analysis software status. Timeline and personnel for having software ready for experiment. (Charge 5)

9:50 (15) Coffee Break

10:05 Second Morning Session

  • 10:05 (15+10) Overview of personnel and other resources S.N.Nakamura File:ERR-personnel-SNN-20241119.pdf
    • Are the manpower and other resources necessary to execute the experiments identified? Are the responsibilities for carrying out each job

assigned? Please provide a detailed and realistic evalution of the available FTE with names if possible. (charge 4)

  • 10:30 (15+10) Overview of Radiation Levels Talk (Pavel Degtiarenko)
    • Are the radiation levels expected to be generated in the hall acceptable? Is any local shielding required to minimize the effects of radiation in the equipment? (charge 6)
  • 10:55 (15+5) Overview of safety documentation S.N.Nakamura File:ERR-documents-SNN-20241119.pdf
    • What is the status of the specific documentation and procedures (COO, ESAD, RSAD, ERG, OSP’s, operation manuals, etc.) to run the experiments? (charge 7)

11:15-12:30 Executive Session & Lunch

Closeout

Documentation Drafts

  • Conduct of Operations (COO) Ref:File:E01-011-COO.pdf
  • Experiment Safety Assessment Document (ESAD) Ref.File:E05-115-ESAD.pdf
  • Hall C Worker Safety Awareness Training (SAF112)/Emergency Response Guidelines (ERG)
  • Experiment
  • Radiation Safety Assessment Document

Miscellaneous Materials

  • Installation schedule