* 13:45 (20+20) [https://hallcweb.jlab.org/experiments/ERR/Magnets/Brindza%20ppt/SHMS%20Q2Q3Dipole%20Acceptance%20Test.pptx Acceptance Test Plan & Lessons learned from the previous magnets - P. Brindza]
 
* 13:45 (20+20) [https://hallcweb.jlab.org/experiments/ERR/Magnets/Brindza%20ppt/SHMS%20Q2Q3Dipole%20Acceptance%20Test.pptx Acceptance Test Plan & Lessons learned from the previous magnets - P. Brindza]
 
* 14:25 (20+15) Magnet Documentation (Drawings, Design Calculations, ASME certifications, FEA Analysis, Test and Inspection records - A. Porheil
 
* 14:25 (20+15) Magnet Documentation (Drawings, Design Calculations, ASME certifications, FEA Analysis, Test and Inspection records - A. Porheil
* 15:00 (15+15) Resource loaded Plan for Completion of all 3 magnets - S. Lassiter
+
* 15:00 (15+15) [https://hallcweb.jlab.org/experiments/ERR/Magnets/SHMS_DipoleQ23_ERR_Schedule-RevB.pdf Resource loaded Plan for Completion of all 3 magnets - S. Lassiter]
 
<br>
 
<br>
 
*15:30 (120) Executive Session, Questions, Report Writing
 
*15:30 (120) Executive Session, Questions, Report Writing
Line 37: Line 37:
  
 
==Supplementary Material==
 
==Supplementary Material==
 +
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Lassiter/SHMS_HB_2016-10_IPR_sun.pptx Horizontal Bender Update]
 +
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/HB_Q123_Dipole_Relief_Sizing_updated_2016-3-30-1.docx HB/Q123/Dipol Relief Sizing]
 +
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/JLab%20Q2-Q3%20Relief%20301_1%20He%20Pressure%20Relief.pdf Q2/Q3 Relief]
 +
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3%20Final%20Design%20Review%20for%20ERR/ Q2/Q3 Final Design Review files]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3%20Final%20Design%20Review%20for%20ERR/ Q2/Q3 Final Design Review files]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20Final%20Design%20Review%20for%20ERR/ Dipole Final Design Review files]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20Final%20Design%20Review%20for%20ERR/ Dipole Final Design Review files]
Line 49: Line 53:
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20and%20Q23%20QA%20docs/ DIpole and Q23 QA docs]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20and%20Q23%20QA%20docs/ DIpole and Q23 QA docs]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20contract%20documents/ Dipole contract documents]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Dipole%20contract%20documents/ Dipole contract documents]
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Hall%20C%20ODH%20Analysis/ Hall C ODH Analysis]
+
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/ODH%20Calulation/Hall%20C%20ODH%20Analysis%20RevB.docx Hall C ODH Analysis]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/JLAB%20Tech%20Spec's%20Q2Q3%20&%20Dipole/ JLAB Tech Spec's Q2Q3 & Dipole]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/JLAB%20Tech%20Spec's%20Q2Q3%20&%20Dipole/ JLAB Tech Spec's Q2Q3 & Dipole]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/MISC%20Dipole%20documents%20and%20reports/ MISC Dipole documents and reports]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/MISC%20Dipole%20documents%20and%20reports/ MISC Dipole documents and reports]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3Contract%20Documents/ Q2Q3 Contract Documents]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3Contract%20Documents/ Q2Q3 Contract Documents]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3%20Pressure%20safety%20reports/ Pressure safety reports]
 
* [https://hallcweb.jlab.org/experiments/ERR/Magnets/Q2Q3%20Pressure%20safety%20reports/ Pressure safety reports]

Latest revision as of 13:19, 12 October 2016

12 GeV Superconducting Magnet Review

SHMS Q2,Q3 and Dipole Magnets in Hall C

Time and Location

  • Date: October 12, 2016
  • Location: CEBAF Center L102
  • ERR Charge: (pdf)
  • ERR Committee: Joe Minervini (MIT) - chair, Jonathan Creel (JLab), Bob Flora (FNAL), Ed Folts (JLab) - observer, Probir Ghoshal (JLab), Javier Gomez (JLab) - observer, Bob May (JLab)

Agenda (talks)

Wednesday October 12, 2016


  • 10:25 (15) Coffee Break



  • 11:45 (45) Executive Session: Working Lunch
(Panel Discussion and Requests for Additional Info)


  • 12:30 (75) Tour of Hall-C Magnets & Magnet Systems



  • 15:30 (120) Executive Session, Questions, Report Writing


  • 17:30 (30) Closeout

Supplementary Material