Difference between revisions of "Wednesday, February 07, 2017"
From HallCWiki
Jump to navigationJump to search (Link to scalers) |
|||
(27 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
− | = | + | == Meeting Information == |
+ | * Location CC L102, 11 am | ||
+ | * [https://hallcweb.jlab.org/doc-private/DocumentDatabase DocDB] | ||
+ | * [https://zimbra.jlab.org/zimbra/h/printappointments?id=13386-13385&tz=America/New_York Brad's Email] | ||
− | == | + | === Blue Jeans Connection Information === |
− | * | + | * https://bluejeans.com/654704307/ |
− | * | + | * Just want to dial in on your phone? |
− | * | + | ** +1.408.740.7256 (US) |
− | * | + | ** +1.888.240.2560 (US Toll Free) |
+ | ** +1.408.317.9253 (Alternate number) | ||
+ | ** http://bluejeans.com/numbers | ||
+ | # Enter Meeting ID: 654704307 | ||
+ | # Press # | ||
− | == SHMS == | + | == Agenda == |
− | * Drift Chambers: E. Christy, D. Biswas | + | # Review systems owners and update information if needed |
− | * Hodoscopes: S. Malace, M. Jones | + | # Point system owners to Wiki's that need to be addressed for the upcoming commissioning run |
− | * Shower/Pre-shower: H. Mkrtchyan, Yerevan | + | # Address system specific points of interest for the upcoming commissioning run |
− | * Aerogel Cerenkov: A. Mkrtchyan, T. Horn | + | |
− | * NGC: D. Day, E. Pooser | + | == System Owners == |
− | * HGC: G. Huber, B. Li | + | |
+ | === HMS === | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/Pre-12_GeV_HMS_Drift_Chambers Drift Chambers]: E. Pooser | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/HMS_Hodoscopes Hodoscopes]: S. Malace, M. Jones | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/HMS_Calorimetry Shower]: H. Mkrtchyan, Yerevan | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/HMS_Cherenkov HGC]: B. Sawatzky | ||
+ | |||
+ | === SHMS === | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Drift_Chambers Drift Chambers]: E. Christy, D. Biswas | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Hodoscopes Hodoscopes]: S. Malace, M. Jones | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Calorimetry Shower/Pre-shower]: H. Mkrtchyan, Yerevan | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Aerogel Aerogel Cerenkov]: A. Mkrtchyan, T. Horn | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Noble_Gas_Cerenkov NGC]: D. Day, E. Pooser | ||
+ | * [https://hallcweb.jlab.org/wiki/index.php/SHMS_Heavy_Gas_Cerenkov HGC]: G. Huber, B. Li | ||
+ | |||
+ | === Other === | ||
+ | * [[Scalers]]: | ||
+ | |||
+ | == Slides == | ||
+ | * | ||
+ | |||
+ | == General Questions to be Addressed by Individual Groups == | ||
+ | # What is the current status on the Hardware? | ||
+ | #* Identify any remaining bad detectors/channels. (Show a quick slide that indicates status?) | ||
+ | #* Are there plans to repair them prior to the KPP run, or after KPP? | ||
+ | # What is the status of the Software associated with your detector? | ||
+ | #* Have you successfully run the analyzer and been able to identify signals for your detector? | ||
+ | #* Have the HV <-> ADC <-> TDC channel mappings all been verified to be correct? | ||
+ | #* Have any relevant survey/position information been updated your detector's PARAM files? | ||
+ | #* Have all calibration constants been updated in the PARAM files (ie. gains, time offsets, etc...)? | ||
+ | #* If beam is needed to finalize these params, is the software chain ready to go to generate them quickly? | ||
+ | # Can you think of anything else that needs to be completed before we take beam? | ||
+ | #* Missing software you need? | ||
+ | #* Missing survey/position information to complete the PARAM files? | ||
+ | |||
+ | == Specific Questions to be Addressed == | ||
+ | # HMS & SHMS Drift Chambers | ||
+ | #* Can we acquire tracks from the cosmic data yet? | ||
+ | # NGC | ||
+ | #* Are the HV signal cables hooked up? | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | === General === | ||
+ | |||
+ | * All groups are requested to update documentation on the wiki link | ||
+ | ** We will use these as references for shift crew later. | ||
+ | ** See links under [https://hallcweb.jlab.org/wiki/index.php/Wednesday%2C_February_07%2C_2017#System_Owners System Owners] | ||
+ | ** Use the [https://hallcweb.jlab.org/wiki/index.php/Pre-12_GeV_HMS_Drift_Chambers HMS Drift Chambers] entries as an example | ||
+ | ** Links should point to documents in the DocDB | ||
+ | ** Don't just upload to the wiki. | ||
+ | * Set HW limit on all HV cards to set a reasonable hardware limit | ||
+ | ** Dave Mack volunteered | ||
+ | *** Brad will get him a screwdriver | ||
+ | |||
+ | === HMS === | ||
+ | |||
+ | ==== Drift Chambers ==== | ||
+ | |||
+ | * System Owner: E. Pooser | ||
+ | * Ethane:Argon now in use | ||
+ | * Working on final offsets for alignment params from Survey added to PARAM files | ||
+ | ** Tracking is working though | ||
+ | * A few dead channels(known), no hot channels | ||
+ | * Calibration constants are up-to-date in PARAM files | ||
+ | * Need to recheck deficiencies with the Eth:Ar gas (should happen this week) | ||
+ | |||
+ | ==== Hodoscopes ==== | ||
+ | |||
+ | * System owners: S. Malace, M. Jones] | ||
+ | * Hardware in good shape | ||
+ | * Rough timing calibration is done | ||
+ | * Generally in good shape | ||
+ | |||
+ | ==== Shower ==== | ||
+ | |||
+ | * System Owners: H. Mkrtchyan, Yerevan | ||
+ | * PMTs are powered up, but can't see good signals now | ||
+ | ** Saw signals in the past: see Simona's [https://hallcweb.jlab.org/experiments/ERR/hall_c_err_hms_malace.pdf ERR talk] | ||
+ | ** Needs to be followed up -- not sure what changed | ||
+ | *** Maybe need to check the gains / HVs | ||
+ | |||
+ | ==== Heavy Gas Cherenkov ==== | ||
+ | |||
+ | * System owners: B. Sawatzky, E. Pooser | ||
+ | * Pump and fill with CO2 is in progress now | ||
+ | ** Hopefully complete by end of week | ||
+ | * Signals cables have been patched through from the Hut to the F250's upstairs | ||
+ | * PMTs are showing dark current signals | ||
+ | ** They need to be reconnected to the patch panel in the hut | ||
+ | |||
+ | === SHMS === | ||
+ | |||
+ | ==== Drift Chambers ==== | ||
+ | |||
+ | * System owners: E. Christy, D. Biswas | ||
+ | * Need to get resurveyed (Walter) | ||
+ | * No tracks from the analyzer yet | ||
+ | ** Jure is trying to figure out the PARAM file settings | ||
+ | * Ethane:Argon now in use | ||
+ | * 3 cards of missing data | ||
+ | * Plan to do voltage scan and check efficiency with new Eth:Ar mix | ||
+ | * Need to do drift times and T0 calibration in the software | ||
+ | |||
+ | ==== Hodoscopes ==== | ||
+ | |||
+ | * System Owners: S. Malace, M. Jones] | ||
+ | * Plastic scintillators in good shape | ||
+ | * Gain matching complete | ||
+ | * Quartz plane status | ||
+ | ** Bars 7--16 (middle) are the 'working' bars for now (though bar 16 is poor) | ||
+ | ** 4 of the 9 bars show correlated signal using using course tracking cuts from hodoscopes | ||
+ | ** Real tracking from SHMS chambers will help this analysis when available | ||
+ | ** Another 4 bars are questionable, playing with gains, etc | ||
+ | ** 9th bar (#16) has XP tube on one end which in really bad shape | ||
+ | |||
+ | ==== Shower/Pre-shower ==== | ||
+ | |||
+ | * System owners: H. Mkrtchyan, Yerevan | ||
+ | * Preshower | ||
+ | ** All channels good | ||
+ | ** Gains are high, can see muons in all channels | ||
+ | ** May need to remove amplifier and replace with passive splitter | ||
+ | *** Be sure to communicate with Brad before doing this | ||
+ | * Shower | ||
+ | ** One bad PMT (pulling too much current) | ||
+ | ** Block is outside acceptance, so maybe fix in summer? | ||
+ | ** Very small signals visible in most channels, could be due to backwards cosmics? | ||
+ | *** Not sure if this is OK or not | ||
+ | |||
+ | ==== Aerogel Cerenkov ==== | ||
+ | |||
+ | * System owners: A. Mkrtchyan, T. Horn | ||
+ | * All signals present in DAQ | ||
+ | * Large attenuation noted between upstairs and downstairs | ||
+ | * Seems to be confusion about summing, splitting upstairs, need to be clarify what we really want -- talk to Brad | ||
+ | * One missing channel, Arthur working on it | ||
+ | * Most channels seem to be OK downstairs but show a lot of noise Counting House, this needs to be solved. | ||
+ | |||
+ | ==== NGC ==== | ||
+ | |||
+ | * System owners: D. Day, E. Pooser | ||
+ | * Tank will be filled with Argon after it is installed | ||
+ | * Waiting for installation into the SHMS stack (presently on the Hall C floor) | ||
+ | * HV and signal cables are run and verified into DAQ upstairs | ||
+ | * Need to remove paper PMT targets | ||
+ | ** Donal will organize for this to happen next week. | ||
+ | |||
+ | ==== HGC ==== | ||
+ | * System owners: G. Huber, B. Li | ||
+ | * Will be filled with CO2 | ||
+ | ** Pump and fill is in progress this week (Brad) | ||
+ | * One dead channel chased to bad cable -- fixed | ||
+ | * All channels look alive | ||
+ | * Hardware and basic software set up is in good shape | ||
+ | * May want to switch FADCs front-end digitizer FSR to 2V later |
Latest revision as of 11:02, 28 February 2017
Meeting Information
- Location CC L102, 11 am
- DocDB
- Brad's Email
Blue Jeans Connection Information
- https://bluejeans.com/654704307/
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 654704307
- Press #
Agenda
- Review systems owners and update information if needed
- Point system owners to Wiki's that need to be addressed for the upcoming commissioning run
- Address system specific points of interest for the upcoming commissioning run
System Owners
HMS
- Drift Chambers: E. Pooser
- Hodoscopes: S. Malace, M. Jones
- Shower: H. Mkrtchyan, Yerevan
- HGC: B. Sawatzky
SHMS
- Drift Chambers: E. Christy, D. Biswas
- Hodoscopes: S. Malace, M. Jones
- Shower/Pre-shower: H. Mkrtchyan, Yerevan
- Aerogel Cerenkov: A. Mkrtchyan, T. Horn
- NGC: D. Day, E. Pooser
- HGC: G. Huber, B. Li
Other
Slides
General Questions to be Addressed by Individual Groups
- What is the current status on the Hardware?
- Identify any remaining bad detectors/channels. (Show a quick slide that indicates status?)
- Are there plans to repair them prior to the KPP run, or after KPP?
- What is the status of the Software associated with your detector?
- Have you successfully run the analyzer and been able to identify signals for your detector?
- Have the HV <-> ADC <-> TDC channel mappings all been verified to be correct?
- Have any relevant survey/position information been updated your detector's PARAM files?
- Have all calibration constants been updated in the PARAM files (ie. gains, time offsets, etc...)?
- If beam is needed to finalize these params, is the software chain ready to go to generate them quickly?
- Can you think of anything else that needs to be completed before we take beam?
- Missing software you need?
- Missing survey/position information to complete the PARAM files?
Specific Questions to be Addressed
- HMS & SHMS Drift Chambers
- Can we acquire tracks from the cosmic data yet?
- NGC
- Are the HV signal cables hooked up?
Minutes
General
- All groups are requested to update documentation on the wiki link
- We will use these as references for shift crew later.
- See links under System Owners
- Use the HMS Drift Chambers entries as an example
- Links should point to documents in the DocDB
- Don't just upload to the wiki.
- Set HW limit on all HV cards to set a reasonable hardware limit
- Dave Mack volunteered
- Brad will get him a screwdriver
- Dave Mack volunteered
HMS
Drift Chambers
- System Owner: E. Pooser
- Ethane:Argon now in use
- Working on final offsets for alignment params from Survey added to PARAM files
- Tracking is working though
- A few dead channels(known), no hot channels
- Calibration constants are up-to-date in PARAM files
- Need to recheck deficiencies with the Eth:Ar gas (should happen this week)
Hodoscopes
- System owners: S. Malace, M. Jones]
- Hardware in good shape
- Rough timing calibration is done
- Generally in good shape
Shower
- System Owners: H. Mkrtchyan, Yerevan
- PMTs are powered up, but can't see good signals now
- Saw signals in the past: see Simona's ERR talk
- Needs to be followed up -- not sure what changed
- Maybe need to check the gains / HVs
Heavy Gas Cherenkov
- System owners: B. Sawatzky, E. Pooser
- Pump and fill with CO2 is in progress now
- Hopefully complete by end of week
- Signals cables have been patched through from the Hut to the F250's upstairs
- PMTs are showing dark current signals
- They need to be reconnected to the patch panel in the hut
SHMS
Drift Chambers
- System owners: E. Christy, D. Biswas
- Need to get resurveyed (Walter)
- No tracks from the analyzer yet
- Jure is trying to figure out the PARAM file settings
- Ethane:Argon now in use
- 3 cards of missing data
- Plan to do voltage scan and check efficiency with new Eth:Ar mix
- Need to do drift times and T0 calibration in the software
Hodoscopes
- System Owners: S. Malace, M. Jones]
- Plastic scintillators in good shape
- Gain matching complete
- Quartz plane status
- Bars 7--16 (middle) are the 'working' bars for now (though bar 16 is poor)
- 4 of the 9 bars show correlated signal using using course tracking cuts from hodoscopes
- Real tracking from SHMS chambers will help this analysis when available
- Another 4 bars are questionable, playing with gains, etc
- 9th bar (#16) has XP tube on one end which in really bad shape
Shower/Pre-shower
- System owners: H. Mkrtchyan, Yerevan
- Preshower
- All channels good
- Gains are high, can see muons in all channels
- May need to remove amplifier and replace with passive splitter
- Be sure to communicate with Brad before doing this
- Shower
- One bad PMT (pulling too much current)
- Block is outside acceptance, so maybe fix in summer?
- Very small signals visible in most channels, could be due to backwards cosmics?
- Not sure if this is OK or not
Aerogel Cerenkov
- System owners: A. Mkrtchyan, T. Horn
- All signals present in DAQ
- Large attenuation noted between upstairs and downstairs
- Seems to be confusion about summing, splitting upstairs, need to be clarify what we really want -- talk to Brad
- One missing channel, Arthur working on it
- Most channels seem to be OK downstairs but show a lot of noise Counting House, this needs to be solved.
NGC
- System owners: D. Day, E. Pooser
- Tank will be filled with Argon after it is installed
- Waiting for installation into the SHMS stack (presently on the Hall C floor)
- HV and signal cables are run and verified into DAQ upstairs
- Need to remove paper PMT targets
- Donal will organize for this to happen next week.
HGC
- System owners: G. Huber, B. Li
- Will be filled with CO2
- Pump and fill is in progress this week (Brad)
- One dead channel chased to bad cable -- fixed
- All channels look alive
- Hardware and basic software set up is in good shape
- May want to switch FADCs front-end digitizer FSR to 2V later