Difference between revisions of "Wednesday, September 20, 2017"

From HallCWiki
Jump to navigationJump to search
Line 24: Line 24:
  
 
=== General ===
 
=== General ===
 
+
Dave Gaskell commented: The SHMS Heavy Gas CHerenkov did not behave as expected during KPP, so there exists the possibility of replacing it with a Gas Cherenkov that was used previously.
 
 
  
 
=== Miscellaneous ===
 
=== Miscellaneous ===

Revision as of 09:56, 21 September 2017

Meeting Information

  • Location CC L210A, 11 am
  • DocDB

Blue Jeans Connection Information

  1. Enter Meeting ID: 895800575
  2. Press #

Agenda

  1. Commissioning plan updates from detector systems
  2. Status update from detector owners, calibrations, efficiencies, etc.
    1. Update on new HMS wire chambers — B. Pandey
    2. HV issue with GEM L. Kabir
  3. Review systems owners and update information
  4. Address system specific points of interest for the Fall 2017 run

Minutes

General

Dave Gaskell commented: The SHMS Heavy Gas CHerenkov did not behave as expected during KPP, so there exists the possibility of replacing it with a Gas Cherenkov that was used previously.

Miscellaneous

Beam Line

Trigger/DAQ

The HMS/SHMS 6 trigger input on the TI has been configured to include multiple pre-triggers simultaneously.

HMS

6 GeV Drift Chambers

12 GeV Drift Chambers

Hodoscopes

Aerogel

Heavy Gas Cherenkov

Shower

SHMS

GEM

Nobel Gas Cherenkov

Drift Chambers

Hodoscopes

Heavy Gas Cherenkov

Aerogel Cerenkov

Shower/Pre-shower