Difference between revisions of "VCS Instructions for Shift Takers"
From HallCWiki
Jump to navigationJump to search (Created page with "=='''Instructions for VCS Polarizabilities'''== ------------------------------------------------ 1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam...") |
|||
Line 3: | Line 3: | ||
1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady | 1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady | ||
− | + | Check the deadtime and the scaler in the 50k report file which is on: | |
− | + | /home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/ | |
− | |||
− | |||
− | + | 2. Login to cdaql1 machine and go to hallc_replay directory if you are not there already: | |
− | |||
− | |||
− | |||
− | + | > ssh cdaql1 | |
− | |||
− | |||
− | + | > go_analysis | |
− | + | go_analysis will bring you to the vcs2019 directory. | |
− | + | 3. After 50K triggers, check online plots for the detectors | |
+ | |||
+ | For SHMS detector check: ./run_coin_shms.sh <run_number> <last_event> | ||
+ | |||
+ | 4. Fill the run sheet for each run, including junk |
Latest revision as of 15:45, 13 July 2019
Instructions for VCS Polarizabilities
1. Keep an eye on the Hall C Scaler Data GUI and make sure the rates with beam ON are steady
Check the deadtime and the scaler in the 50k report file which is on:
/home/cdaq/vcs2019/hallc_replay_vcs/REPORT_OUTPUT/COIN/PRODUCTION/
2. Login to cdaql1 machine and go to hallc_replay directory if you are not there already:
> ssh cdaql1
> go_analysis
go_analysis will bring you to the vcs2019 directory.
3. After 50K triggers, check online plots for the detectors
For SHMS detector check: ./run_coin_shms.sh <run_number> <last_event>
4. Fill the run sheet for each run, including junk