Difference between revisions of "Target Field and Kepco Info"
From HallCWiki
Jump to navigationJump to search(13 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
* March 24th Trouble getting transverse NMR signal. Bad Cable? https://logbooks.jlab.org/entry/3809148 | * March 24th Trouble getting transverse NMR signal. Bad Cable? https://logbooks.jlab.org/entry/3809148 | ||
− | ==Coil Currents | + | ==Coil Currents== |
− | + | [[ Image:D2nCoilCurrent.png |600px |Coil Currents for D2n]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==Labview Program Guide== | ==Labview Program Guide== | ||
Line 80: | Line 24: | ||
==Plan for returning from COVID shutdown== | ==Plan for returning from COVID shutdown== | ||
− | * Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown | + | * Work that can begin immediately (June 10th, 2020) Task 1 in HCLIST (http://devweb.acc.jlab.org/CSUEApps/hclist/atlis.php?load=Task&task_id=1818) |
− | * Measure resistance to ground for both coils | + | ** Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown |
− | * Install latest new power supply, add additional circuitry | + | *** This can be done anywhere, I just need some connectors from Ethan or Jack. Currently the new power supply is in Bill's office. |
− | * Test power supplies in both current and voltage control mode | + | ** Measure resistance to ground for both coils. |
− | * | + | ** Install latest new power supply, add additional circuitry (RLC). |
− | * Test NMR in both voltage and current mode | + | ** Test power supplies in both current and voltage control mode |
− | + | *** MUST check PS output on scope, with and without RF on. | |
+ | *** LIKE to check PS output on scope, with and without sense wires attached. | ||
+ | *** LIKE to check PS output on scope, with and without additional circuity (RLC). | ||
+ | **LABVIEW | ||
+ | *** Determine calibrations: Current to field, field direction equation for epics, function generator output vs PS output, ... | ||
+ | *** Update programs. One for voltage mode, one for current mode | ||
+ | |||
+ | |||
+ | *After the cell is polarized (Task 9 in HCLIST) | ||
+ | ** Test NMR in both voltage and current mode | ||
==Manuals/Documentation== | ==Manuals/Documentation== | ||
* [[Media:KEPCO.pdf|Note on KEPCO power supplies]] | * [[Media:KEPCO.pdf|Note on KEPCO power supplies]] |
Latest revision as of 11:37, 15 June 2020
This page is dedicated to all things Target Field related
Log Entries
- Nov. 26th Kepcos replaced Agilents https://logbooks.jlab.org/entry/3744320
- Dec. 26th V_in vs Current Calibration for two Kepcos in voltage control mode https://logbooks.jlab.org/entry/3747508
- Jan. 4th Swapped out Kepco with another Kepco because it was not stable https://logbooks.jlab.org/entry/3758511
- Jan. 15th Swapped out Kepco with another Kepco because it was running hot and tripping https://logbooks.jlab.org/entry/3764365
- Feb. 9th Field sweep program updated for Agilent https://logbooks.jlab.org/entry/3780264
- Feb. 10th Replaced Kepco with Agilent. Rearranged rack for better cooling https://logbooks.jlab.org/entry/3781492
- Feb. 14th Replaced Agilent with new Kepco. In constant current mode the inductive load option interfered with NMR https://logbooks.jlab.org/entry/3783977
- March 18th In constant voltage mode, coils need time to warm up https://logbooks.jlab.org/entry/3805990
- March 22nd New Kepco had odd behavior in voltage mode. Transverse NMR was not working. Left in current mode. https://logbooks.jlab.org/entry/3807357
- March 22nd Odd behavior explained from above. Noticed possible grounding issues. https://logbooks.jlab.org/entry/3807894
- March 24th Trouble getting transverse NMR signal. Bad Cable? https://logbooks.jlab.org/entry/3809148
Coil Currents
Labview Program Guide
Field Measurements
- A1n Vertical Field Measurement (March 13th, 2019)
https://logbooks.jlab.org/entry/3804362
Plan for returning from COVID shutdown
- Work that can begin immediately (June 10th, 2020) Task 1 in HCLIST (http://devweb.acc.jlab.org/CSUEApps/hclist/atlis.php?load=Task&task_id=1818)
- Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
- This can be done anywhere, I just need some connectors from Ethan or Jack. Currently the new power supply is in Bill's office.
- Measure resistance to ground for both coils.
- Install latest new power supply, add additional circuitry (RLC).
- Test power supplies in both current and voltage control mode
- MUST check PS output on scope, with and without RF on.
- LIKE to check PS output on scope, with and without sense wires attached.
- LIKE to check PS output on scope, with and without additional circuity (RLC).
- LABVIEW
- Determine calibrations: Current to field, field direction equation for epics, function generator output vs PS output, ...
- Update programs. One for voltage mode, one for current mode
- Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
- After the cell is polarized (Task 9 in HCLIST)
- Test NMR in both voltage and current mode