Difference between revisions of "RC Meeting, Wednesday, October 27 , 2021"

From HallCWiki
Jump to: navigation, search
(Hall C Status)
(Hall C Status)
 
(14 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
 
= Hall C Status =
 
= Hall C Status =
# Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)
+
Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)
# On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018  https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit.  
+
 
# End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. (NOTE TO SELF: ARE THEIR INSTRUCTIONS FOR THIS ON THE WIKI? IT WOULD NEVER OCCUR TO ME TO CLICK ON THE HEARTBEAT.)
+
On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018  https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit.  
# Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750  https://logbooks.jlab.org/entry/3932747
+
 
# Number of good pions is ????.
+
End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. I didn't see this mentioned on our Wiki, so I added it, and listed it under Useful Links as well.  
 +
 
 +
Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750  https://logbooks.jlab.org/entry/3932747
 +
 
 +
Number of good pions is 5483.
  
 
= Current Run Plan =
 
= Current Run Plan =
 
# Day shift only: <span style="color:red"> ''' Try to take 1 hour of Dummy target each day. (a 100% live hour) ''' </span>
 
# Day shift only: <span style="color:red"> ''' Try to take 1 hour of Dummy target each day. (a 100% live hour) ''' </span>
# Tentatively scheduled: a BCM calibration on Wednesday mid-afternoon.      
+
# BCM calibration: I would like to push this to Thursday, if the PD and other halls are willing. We'd really, really like 60+ muA so we can keep the errors on the fitted gains small, but I have no confidence the accelerator can do that today.  
 
# Continue data taking until early Nov
 
# Continue data taking until early Nov
  
Line 30: Line 34:
  
 
= Useful Links =
 
= Useful Links =
*  [https://logbooks.jlab.org/entry/3928364 Abbreviated beam restoration procedure]
+
*  [https://logbooks.jlab.org/entry/3928364 How the harp scans and carbon hole target should look (see links):]
 +
* [https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures carbon hole target beam centering procedure:]
 +
* [https://logbooks.jlab.org/entry/3933073 Resetting the "ioc heartbeat epics communications" (start by clicking on the heart at upper left of the magnet controls screen]
 
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT Fall 2021 Shift Schedule]
 
* [https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=HALLC-PIONLT Fall 2021 Shift Schedule]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Live Status]
 
* [https://hallcweb.jlab.org/live_status/snapshots_controls/ Hall-C Live Status]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://logbooks.jlab.org/book/hallc Hall-C Logbook]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC White Board]

Latest revision as of 11:07, 27 October 2021


RC Meeting Information

RC Daily Meetings are at 10 am, remote connection link: https://bluejeans.com/861439920

Accelerator Status

  1. Beam delivery back to Halls B,C,D on owl shift.

Hall C Status

Back in production at 42 muA on late swing. (Some beam early on swing, but mostly tuning for Hall B.)

On late swing, alarms due to dropping HB LHe levels. We have our good days, but they always come back. Steve L intervened. https://logbooks.jlab.org/entry/3933018 https://logbooks.jlab.org/entry/3933051 He's set it so the HB is now over-filling a bit.

End of swing, SHMS Q2 Interlock plus some sort of communication reset required on a screen I haven't seen before. https://logbooks.jlab.org/entry/3933073 Also Steve L. Recovery by 00:30 on owl. I didn't see this mentioned on our Wiki, so I added it, and listed it under Useful Links as well.

Earlier in the day, when there was no beam, Q3 slow dumped due to a communication failure. It took more than the usual power cycle to get it back: a small power supply had died and was replaced by Joe B and Steve L(?). https://logbooks.jlab.org/entry/3932750 https://logbooks.jlab.org/entry/3932747

Number of good pions is 5483.

Current Run Plan

  1. Day shift only: Try to take 1 hour of Dummy target each day. (a 100% live hour)
  2. BCM calibration: I would like to push this to Thursday, if the PD and other halls are willing. We'd really, really like 60+ muA so we can keep the errors on the fitted gains small, but I have no confidence the accelerator can do that today.
  3. Continue data taking until early Nov

Current Issues

  1. Replace flow switches for (HMS?) magnet power supplies: next opportunistic access (Joe Beaufait) ( PENDING )
  2. HMS Q3 insulating vacuum spikes generating annoyance alarms that take minutes to recover. https://logbooks.jlab.org/entry/3930175 Noise levels on transducers look OK, but Junaid's plot indicates Q3 is burping: https://logbooks.jlab.org/entry/3932992 .
  3. Serious HB LHe low liquid level alarms. https://logbooks.jlab.org/entry/3933051 Always seems to start with a subtle, simultaneous increase in level in Q1/2/3. https://logbooks.jlab.org/entry/3929152 .
  4. Target ladder camera was identified to be bad: Joe Beaufait will order camera ( PENDING )
  5. Still running with no UPS on the SHMS cryo controls - Steve L. has ordered batteries and UPS. ( PENDING )
  6. HCCAM02 not functioning (lift required to replace).

Special Requests

Useful Links