Difference between revisions of "Commissioning Plan 2017"
From HallCWiki
Jump to navigationJump to search(84 intermediate revisions by 4 users not shown) | |||
Line 243: | Line 243: | ||
! HMS/SHMS trigger: || 3/4 scin, 3/4 scin | ! HMS/SHMS trigger: || 3/4 scin, 3/4 scin | ||
|- | |- | ||
− | ! HMS angle/momentum || 15 and 22. deg, | + | ! HMS angle/momentum || 15 and 22. deg, |
|- | |- | ||
− | ! SHMS angle/momentum || 15. and 22. deg, | + | ! SHMS angle/momentum || 15. and 22. deg, |
|} | |} | ||
*Series of runs changing target. | *Series of runs changing target. | ||
Line 256: | Line 256: | ||
! Target || HMS angle || HMS momentum || SHMS angle || SHMS momentum || SHMS collimator || Time | ! Target || HMS angle || HMS momentum || SHMS angle || SHMS momentum || SHMS collimator || Time | ||
|- | |- | ||
− | ! 0,+/- 10cm || 15. deg || | + | ! 0,+/- 10cm || 15. deg || -4.0|| 15. deg || -4.0 || Centered Sieve || 30 min |
|- | |- | ||
− | ! 0,+/- 10cm || 15. deg || | + | ! 0,+/- 10cm || 15. deg || -4.0|| 15. deg || -4.0 || Shifted Sieve || 30 min |
|- | |- | ||
− | ! +/- 5cm || 15. deg || | + | ! +/- 5cm || 15. deg || -4.0|| 15. deg || -4.0 || Centered Sieve || 30 min |
|- | |- | ||
− | ! +/- 5cm || 15. deg || | + | ! +/- 5cm || 15. deg || -4.0|| 15. deg || -4.0 || Shifted Sieve || 30 min |
|- | |- | ||
− | ! 0,+/- 10cm || 22. deg || 2 | + | ! 0,+/- 10cm || 22. deg || -3.2|| 22. deg || -3.2 || Centered Sieve || 1.5 hr |
|- | |- | ||
− | ! 0,+/- 10cm || 22. deg || 2 | + | ! 0,+/- 10cm || 22. deg || -3.2|| 22. deg || -3.2 || Shifted Sieve || 1.5 hr |
|} | |} | ||
+ | == Large Ytar: HMS/SHMS Angle and Position Matrix Optimization (9 hours)== | ||
+ | * Experts: | ||
+ | * Expected time: 9 hours. | ||
+ | * Goal: | ||
+ | * Conditions: | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! beam current: || 20 μA | ||
+ | |- | ||
+ | ! fast raster: || off | ||
+ | |- | ||
+ | ! target: || optics targets | ||
+ | |- | ||
+ | ! HMS/SHMS collimator: || Sieve , Centered Sieve | ||
+ | |- | ||
+ | ! HMS/SHMS trigger: || 3/4 scin, 3/4 scin | ||
+ | |- | ||
+ | ! HMS angle/momentum || 30. deg, -2.0 GeV/c | ||
+ | |- | ||
+ | ! SHMS angle/momentum || 30. deg, -2.0 GeV/c | ||
+ | |} | ||
+ | * | ||
== Check of ELREAL/ELCLEAN Trigger ( 1.5 hour)== | == Check of ELREAL/ELCLEAN Trigger ( 1.5 hour)== | ||
* Experts: SImona | * Experts: SImona | ||
Line 294: | Line 316: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! HMS angle/mom || SHMS angle/mom || Target || HMS/SHMS Trigger || | + | ! HMS angle/mom || SHMS angle/mom || Target || HMS/SHMS Trigger || Total DAQ Triggers |
|- | |- | ||
! 25./-3.0 || 25./-3.0 || 10cm LH2 || Only 3/4 scin (prescale trig1=0,trig2=-1,trig3=-1) || 300K | ! 25./-3.0 || 25./-3.0 || 10cm LH2 || Only 3/4 scin (prescale trig1=0,trig2=-1,trig3=-1) || 300K | ||
Line 308: | Line 330: | ||
! 25./-1.4 || 25./-1.4 || 10cm LH2 || ELCLEAN (prescale trig1=-1,trig2=-1,trig3=0) || 300K | ! 25./-1.4 || 25./-1.4 || 10cm LH2 || ELCLEAN (prescale trig1=-1,trig2=-1,trig3=0) || 300K | ||
|} | |} | ||
− | + | == Coincidence Checkout [9 hrs] == | |
− | == | ||
* Experts: | * Experts: | ||
* Expected time: | * Expected time: | ||
Line 316: | Line 337: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || 20 μA | + | ! beam current: || 20-50 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 mm2 |
|- | |- | ||
! target: || 10cm LH2 | ! target: || 10cm LH2 | ||
|- | |- | ||
− | ! HMS/SHMS collimator: || PION , COLLIMATOR | + | ! HMS/SHMS collimator: || PION/SIEVE , COLLIMATOR/CENTERED SIEVE |
|- | |- | ||
! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ||
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || 27.5 deg, -3.609 GeV/c |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || 27.5 deg, +3.609 GeV/c |
|} | |} | ||
− | * | + | * Series of runs with/without collimator on electron side and switch polarities between HMS/SHMS. |
− | == | + | * Last run is used to evaluate accidentals. |
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! HMS angle || HMS momentum || SHMS angle || HMS collimator || SHMS momentum || SHMS collimator || Time | ||
+ | |- | ||
+ | ! 27.5 deg || +3.609 || 27.5 deg || Pion || -3.609 || Collimator || 30 min (4Hz at 20uA) | ||
+ | |- | ||
+ | ! 27.5 deg || +3.609 || 27.5 deg || Pion || -3.609 || Centered Sieve || 2 hr | ||
+ | |- | ||
+ | ! 27.5 deg || -3.609 || 27.5 deg || Pion || +3.609 || Collimator || 30 min (4Hz at 20uA) | ||
+ | |- | ||
+ | ! 27.5 deg || -3.609 || 27.5 deg || Sieve || +3.609 || Collimator || 2 hr | ||
+ | |- | ||
+ | ! 27.5 deg || -3.609 || 35.0 deg || Pion || +3.609 || Collimator || 1 hr | ||
+ | |} | ||
+ | |||
+ | == Additional Large Ytar: HMS/SHMS Angle and Position Matrix Optimization (6 hours)== | ||
* Experts: | * Experts: | ||
− | * Expected time: | + | * Expected time: 6 hours. |
* Goal: | * Goal: | ||
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 |
|- | |- | ||
− | ! target: || | + | ! target: || optics targets |
|- | |- | ||
− | ! HMS/SHMS collimator: || | + | ! HMS/SHMS collimator: || Sieve , Centered Sieve |
|- | |- | ||
− | ! HMS/SHMS trigger: || | + | ! HMS/SHMS trigger: || 3/4 scin, 3/4 scin |
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || 25.5,22 deg, -2.6,-3.2 GeV/c |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || 30.,22 deg, -2.0,-3.2 GeV/c |
|} | |} | ||
− | * | + | *Run Plan: Time is assuming 65uA. Take one hour long runs. Should take about 5 hours for +/-10cm data and 1 hour for +/-5cm data. |
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! HMS angle || HMS momentum | + | ! Target || HMS angle || HMS momentum || SHMS angle || SHMS momentum || SHMS collimator || Counts |
− | |||
− | |||
|- | |- | ||
− | ! | + | ! 0,+/- 10cm || 25. deg || -2.6|| 30. deg || -2.0 || Centered Sieve || Total of 4.0M SHMS triggers. |
|- | |- | ||
− | ! | + | ! +/- 5cm || 22. deg || -3.2|| 22. deg || -3.2 || Centered Sieve || Total of 1.0M SHMS Triggers. |
− | |||
− | |||
|} | |} | ||
− | + | == Additional Coincidence Checkout [3 hr] == | |
− | == | + | |
− | |||
− | |||
− | |||
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 mm2 |
|- | |- | ||
! target: || 10cm LH2 | ! target: || 10cm LH2 | ||
Line 381: | Line 411: | ||
! HMS/SHMS collimator: || PION , COLLIMATOR | ! HMS/SHMS collimator: || PION , COLLIMATOR | ||
|- | |- | ||
− | ! HMS/SHMS trigger: || | + | ! HMS/SHMS trigger: || Coincidence |
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || Various |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || Various |
|} | |} | ||
− | * | + | *Run Plan: |
− | + | **HMS is detecting electrons and SHMS is detecting protons. | |
− | + | ** Use HMS pion collimator and SHMS collimator. | |
− | * | + | ** Cycle SHMS for each change when raising momentum |
− | * | ||
− | * | ||
− | * | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! | + | ! Target || Prescales || HMS angle || HMS momentum || SHMS angle || SHMS momentum || Time |
|- | |- | ||
− | ! | + | ! LH2 || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 22.0 deg || -4.284 || 33.3 deg || +2.925 || 30 min (65Hz) |
− | |- | ||
− | |||
|- | |- | ||
− | ! | + | ! 0.5% carbon || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 22.0 deg || -4.284 || 33.3 deg || +2.925 || 10min |
|- | |- | ||
− | ! | + | ! 0.5% carbon || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1||35.0 deg || -2.869 || 22.0 deg || +4.38 || 10 min |
+ | |- | ||
+ | ! LH2 || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 ||35.0 deg || -2.869 || 22.0 deg || +4.38 || 30 min (6Hz) | ||
|- | |- | ||
− | ! | + | ! LH2 || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 ||50.0 deg || -1.864 || 15.3 deg || +5.41 || 1.5 hrs (0.6Hz) |
|- | |- | ||
− | ! | + | ! 0.5% carbon || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1||50.0 deg || -1.864 || 15.3 deg || +5.41 || 10 min |
|} | |} | ||
− | * | + | * Run until 8am when Jay Benesch in MCC will do the beam energy measurement. |
== Beam Energy Measurement (3 hours)== | == Beam Energy Measurement (3 hours)== | ||
− | * Experts: MCC, | + | * Experts: MCC, Jay Benesch |
* Expected time: 3 hours | * Expected time: 3 hours | ||
* Goal: Measure beam energy for elastics | * Goal: Measure beam energy for elastics | ||
Line 426: | Line 453: | ||
|} | |} | ||
*MCC procedure | *MCC procedure | ||
− | + | == Target LH2/LD2 boiling study== | |
− | + | * Experts: Eric Pooser | |
− | == Target LH2/LD2 boiling study | + | * Expected time: |
− | * Experts: Eric | ||
− | * Expected time: | ||
* Goal: Measure target boiling. | * Goal: Measure target boiling. | ||
− | * Conditions: | + | * Conditions: |
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current (uA): || | + | ! beam current (uA): || 2, 7, 10, 20, 30, 40, 50, 60, 65 |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2mm |
|- | |- | ||
− | ! target: || 10cm LH2, 10cm LD2, 0.5% Carbon | + | ! target: || 10cm LH2, 10cm LD2, 0.5% Carbon, *Al 10 cm Dummy only at 20 and 40 muA* |
|- | |- | ||
− | ! SHMS/HMS collimator: || PION | + | ! SHMS/HMS collimator: || Collimator/PION |
|- | |- | ||
− | ! SHMS/HMS trigger: || SCIN 3/4 | + | ! SHMS trigger: || SCIN 3/4 |
+ | |- | ||
+ | ! SHMS angle/momentum: || 15 deg / -3 GeV/c | ||
+ | |- | ||
+ | ! HMS trigger: || SCIN 3/4 | ||
+ | |- | ||
+ | ! HMS angle/momentum: || 15 deg / -3 GeV/c | ||
|- | |- | ||
− | ! | + | |} |
+ | * Run Plan: | ||
+ | ** Set spectrometers to above settings | ||
+ | ** For each target, do nine separate runs for each current and take 200,000 events. | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! Target || Trigger || Currents | ||
+ | |- | ||
+ | !10cm LH2 || ps1=#, rest to -1, Set # so deadtime is 20% || 2, 7, 10, 20, 30, 40, 50, 60, 65 | ||
+ | |- | ||
+ | !10cm LD2 || ps1=#, rest to -1, Set # so deadtime is 20% || 2, 7, 10, 20, 30, 40, 50, 60, 65 | ||
+ | |- | ||
+ | !0.5% carbon || ps1=#, rest to -1, Set # so deadtime is 20% || 2, 7, 10, 20, 30, 40, 50, 60, 65 | ||
+ | |- | ||
+ | !10 cm dummy || ps1=#, rest to -1, Set # so deadtime is 20% || 20,40 | ||
|} | |} | ||
− | == | + | == Final Checkout of SHMS ELREAL/ELCLEAN Trigger ( 3 hour)== |
− | * Experts: | + | * Experts: Simona Malace |
− | * Expected time: | + | * Expected time: 3 hr |
− | * Goal: | + | * Goal: |
− | * | + | ** Take data to determine thresholds. |
− | * | + | **Sanity check of electron triggers. |
+ | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2mm |
+ | |- | ||
+ | ! target: || 10cm LH2 | ||
|- | |- | ||
− | ! | + | ! SHMS collimator: || Collimator |
|- | |- | ||
− | + | ! SHMS trigger: || Various triggers | |
|- | |- | ||
− | + | ! SHMS angle/momentum || 25. deg, -3.0 GeV/c, -1.4 | |
|} | |} | ||
− | == | + | * Run Plan |
− | * | + | |
− | * | + | ** Take run with 3/4 and threshold at 10mV |
− | * | + | ** Take run with 3/4 and thresholds at: SHMS (PRLO = 10 mV, PRHI = 15 mV, CER = 10 mV) |
− | * | + | ** Take run with ELREAL only trigger |
+ | ** Take run with ELCLEAN trigger | ||
+ | ** Analyze results and confirm that expected efficiencies are achieved. | ||
+ | ** Lower spectrometer momentum to -1.4 GeV to increase pi/e ratio. | ||
+ | ** Repeat all of above | ||
+ | |||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! | + | ! SHMS angle/mom || Target || SHMS Trigger || Trigger Thresholds || Total DAQ Triggers |
+ | |- | ||
+ | ! 25./-3.0 || 10cm LH2 || Only 3/4 trigger || All PID legs to 10mV || 300K | ||
+ | |- | ||
+ | ! 25./-3.0 || 10cm LH2 || Only 3/4 trigger || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K | ||
|- | |- | ||
− | ! | + | ! 25./-3.0 || 10cm LH2 || Only ELREAL || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K |
|- | |- | ||
− | ! | + | ! 25./-3.0 || 10cm LH2 || Only ELCLEAN || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K |
|- | |- | ||
− | ! | + | ! 25./-1.4 || 10cm LH2 || Only 3/4 trigger || All PID legs to 10mV || 300K |
|- | |- | ||
− | ! | + | ! 25./-1.4 || 10cm LH2 || Only 3/4 trigger || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K |
|- | |- | ||
− | ! | + | ! 25./-1.4 || 10cm LH2 || Only ELREAL || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K |
|- | |- | ||
− | ! | + | ! 25./-1.4 || 10cm LH2 || Only ELCLEAN || SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV || 300K |
− | |} | + | |- |
− | + | |} | |
− | == | + | == SHMS Elastic Single arm Checkout Additional angles (4 hours) == |
* Experts: | * Experts: | ||
* Expected time: | * Expected time: | ||
Line 497: | Line 554: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65uA |
− | |||
− | |||
|- | |- | ||
− | ! | + | ! fast raster: || 2x2mm2 |
|- | |- | ||
− | ! | + | ! target: || 0.5% carbon, 10cm LH2 |
|- | |- | ||
− | ! | + | ! SHMS collimator: || PION , COLLIMATOR |
|- | |- | ||
− | ! | + | ! SHMS trigger: || SCIN 3/4, SCIN 3/4 |
|- | |- | ||
− | ! SHMS angle/momentum || 20. | + | ! SHMS angle/momentum || 16,20 ,30,35 deg / 5.074,4.522,3.349,2.869 GeV |
|} | |} | ||
− | * | + | *Run plan |
+ | ** Take 15 min run with 0.5% carbon. Run LH2 for 10,000 events in elastic W for SHMS at 16 deg. | ||
+ | ** Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 20 deg | ||
+ | ** Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 30 deg | ||
+ | ** Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 35 deg | ||
− | == | + | == CT Physics [53 hrs] == |
− | + | ||
− | |||
− | |||
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 mm2 |
|- | |- | ||
! target: || 10cm LH2 | ! target: || 10cm LH2 | ||
Line 528: | Line 585: | ||
! HMS/SHMS collimator: || PION , COLLIMATOR | ! HMS/SHMS collimator: || PION , COLLIMATOR | ||
|- | |- | ||
− | ! HMS/SHMS trigger: || | + | ! HMS/SHMS trigger: || Coincidence |
+ | |- | ||
+ | ! HMS angle/momentum || Various | ||
+ | |- | ||
+ | ! SHMS angle/momentum || Various | ||
+ | |} | ||
+ | *Run Plan: | ||
+ | **HMS is detecting electrons and SHMS is detecting protons. | ||
+ | ** Use HMS pion collimator and SHMS collimator. | ||
+ | ** Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 10000 events each for LH2 and Carbon | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! Target || Prescales || HMS angle || HMS momentum || SHMS angle || SHMS momentum || Time | ||
+ | |- | ||
+ | ! LH2 || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 45.1 deg || -2.131 || 17.1 deg || +5.122 || 12 hrs | ||
+ | |- | ||
+ | ! LH2 || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 45.1 deg || -2.131 || 17.1 deg || +5.122 || 30 min | ||
|- | |- | ||
− | ! | + | ! Al. Dummy || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 45.1 deg || -2.131 || 17.1 deg || +5.122 || 4 hrs |
|- | |- | ||
− | ! | + | ! 6% C || ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 || 45.1 deg || -2.131 || 17.1 deg || +5.122 || 36 hrs |
+ | |- | ||
+ | ! 6% C || ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 || 45.1 deg || -2.131 || 17.1 deg || +5.122 || 30 min | ||
|} | |} | ||
− | * | + | * If possible after completing the LH2 and Dummy we can move to F2 Physics program and come back to the Carbon after the F2 physics program |
+ | |||
+ | == F2 Physics == | ||
+ | *[https://hallcweb.jlab.org/wiki/index.php/Main_Page#F2_Experiment_.28E12-10-002.29_L.2FT_measurement_Run_Plan Run plan] | ||
− | == | + | == Remaining Commissioning == |
+ | === SHMS Elastic Single arm Checkout Additional angles (4 hours) === | ||
* Experts: | * Experts: | ||
* Expected time: | * Expected time: | ||
− | * Goal: | + | * Goal: |
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65uA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2mm2 |
|- | |- | ||
− | ! target: || | + | ! target: || 10cm LH2 |
|- | |- | ||
− | ! SHMS collimator: || | + | ! SHMS collimator: || COLLIMATOR/Center sieve |
|- | |- | ||
− | ! SHMS trigger: || 3/4 | + | ! SHMS trigger: || SCIN 3/4 |
|- | |- | ||
− | ! SHMS angle/momentum || 25. | + | ! SHMS angle/momentum || 25 ,30 / -3.911,-3.349 |
|} | |} | ||
− | *Run | + | *Run plan |
+ | **Take data at SHMS angle = 25 and momentum = -3.911 with collimator for 30 minutes. | ||
+ | **Take data at SHMS angle = 25 and momentum = -3.911 with centered Sieve for 1 hour. | ||
+ | **Take data at SHMS angle = 25 and momentum = -3.6 with collimator for 30 minutes. | ||
+ | **Take data at SHMS angle = 25 and momentum = -3.349 with collimator for 30 minutes. | ||
+ | **Take data at SHMS angle = 30 and momentum = -3.349 with collimator for 1 hour. | ||
+ | **Take data at SHMS angle = 30 and momentum = -3.349 with centered sieve for 2 hour. | ||
+ | |||
+ | |||
+ | |||
+ | |||
− | == | + | ===22 deg Ytar: SHMS Angle and Position Matrix Optimization (1 hours)=== |
* Experts: | * Experts: | ||
− | * Expected time: | + | * Expected time: 1 hours. |
− | * Goal: | + | * Goal: Need more optics data for SHMS at large angles. |
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 |
|- | |- | ||
− | ! target: || | + | ! target: || 0,+/- 10cm |
|- | |- | ||
− | ! | + | ! SHMS collimator: || Centered Sieve,Shifted Sieve |
|- | |- | ||
− | ! | + | ! SHMS trigger: || ELREAL |
+ | |- | ||
+ | ! SHMS angle/momentum || 22 deg, -3.2 GeV/c | ||
+ | |} | ||
+ | *Run Plan: Take during switch in HMS polarity. Time is assuming 65uA. | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | ! Target || SHMS angle || SHMS momentum || SHMS collimator || Time | ||
|- | |- | ||
− | ! | + | ! 0,+/- 10cm || 22. deg || -3.2 || Centered Sieve || 30 minutes |
|- | |- | ||
− | ! | + | ! 0,+/- 10cm || 22. deg || -3.2 || Shifted Sieve || 30 minutes |
|} | |} | ||
− | |||
− | = | + | === SHMS Low momentum electrons and large angle (3 hours)=== |
− | + | * Experts: Eric Christy | |
− | == | + | * Expected time: 3 hours. |
− | * Experts: | + | * Goal: |
− | * Expected time: | ||
− | * Goal: | ||
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA, 40uA (Aluminum dummy) |
+ | |- | ||
+ | ! fast raster: || 2x2 | ||
+ | |- | ||
+ | ! target: || 10cm Lh2, 10cm Al dummy | ||
+ | |- | ||
+ | ! SHMS collimator: || collimator | ||
+ | |- | ||
+ | ! SHMS trigger: || ELREAL | ||
+ | |- | ||
+ | ! SHMS angle/momentum || 35 deg, -2.6 GeV/c | ||
+ | |} | ||
+ | *Run Plan: Take while HMS with positive polarity is taken. Time is assuming 65uA. | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | ! Target || SHMS angle || SHMS momentum || Time | ||
|- | |- | ||
− | ! | + | !10cm Lh2 || 35. deg || -2.6 || 2 hours |
|- | |- | ||
− | ! | + | ! 10cm || 35. deg || -2.6 || 20 minutes |
|} | |} | ||
− | + | ||
− | == SHMS | + | ===30 deg Ytar: HMS/SHMS Angle and Position Matrix Optimization (3 hours)=== |
* Experts: | * Experts: | ||
− | * Expected time: | + | * Expected time: 3 hours. |
− | * Goal: | + | * Goal: Need more optics data for SHMS at large angles. |
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || 65 μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 |
|- | |- | ||
− | ! target: || | + | ! target: || optics targets |
|- | |- | ||
− | ! | + | ! SHMS collimator: || Centered Sieve |
|- | |- | ||
− | ! | + | ! SHMS trigger: || ELREAL |
|- | |- | ||
− | ! | + | ! SHMS angle/momentum || 30. deg, -2.0 GeV/c |
+ | |} | ||
+ | *Run Plan: Time is assuming 65uA. Take one hour long runs. | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | ! Target || SHMS angle || SHMS momentum || SHMS collimator || Time | ||
|- | |- | ||
− | ! | + | ! 0,+/- 10cm || 30. deg || -2.0 || Centered Sieve || 3 hours |
|} | |} | ||
− | |||
− | |||
− | |||
+ | === Repeat Target LH2 boiling study with new SHMS sheilding=== | ||
+ | * Experts: | ||
+ | * Expected time: | ||
+ | * Goal: With new SHMS shielding reconfiguration, repeat LH2 measurement and see if background reduced. | ||
+ | * Conditions: | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! beam current (uA): || 10, 30 , 65 | ||
+ | |- | ||
+ | ! fast raster: || 2x2mm | ||
+ | |- | ||
+ | ! target: || 10cm LH2 | ||
+ | |- | ||
+ | ! SHMS/HMS collimator: || Collimator/PION | ||
+ | |- | ||
+ | ! SHMS trigger: || SCIN 3/4 | ||
+ | |- | ||
+ | ! SHMS angle/momentum: || 15 deg / -3 GeV/c | ||
+ | |||
+ | |} | ||
+ | * Run Plan: | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! Target || Trigger || Currents | ||
+ | |- | ||
+ | !10cm LH2 || ps1=#, rest to -1, Set # so deadtime is 20% || 10, 30, 65 | ||
+ | |} | ||
+ | == Lower priority == | ||
= Beam energy of 10.6 GeV = | = Beam energy of 10.6 GeV = | ||
Line 639: | Line 774: | ||
*MCC procedure | *MCC procedure | ||
− | |||
− | == SHMS Tune Verification == | + | == HMS/SHMS Tune Verification == |
* Experts: | * Experts: | ||
* Expected time: | * Expected time: | ||
* Goal: | * Goal: | ||
+ | **Mix of ep elastic data, and carbon data to check SHMS tune. | ||
+ | **Also LH2 inelastic to calibrate the calorimeter. | ||
* Conditions: | * Conditions: | ||
{|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
|- | |- | ||
− | ! beam current: || | + | ! beam current: || max current μA |
|- | |- | ||
− | ! fast raster: || | + | ! fast raster: || 2x2 |
|- | |- | ||
− | ! target: || | + | ! target: || 1.5% carbon, 10 LH2 |
|- | |- | ||
− | ! HMS/SHMS collimator: || PION , COLLIMATOR | + | ! HMS/SHMS collimator: || PION/SIEVE , COLLIMATOR/Centered Sieve |
|- | |- | ||
! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ! HMS/SHMS trigger: || SCIN 3/4, SCIN 3/4 | ||
|- | |- | ||
− | ! HMS angle/momentum || | + | ! HMS angle/momentum || see table |
|- | |- | ||
− | ! SHMS angle/momentum || | + | ! SHMS angle/momentum || see table |
|} | |} | ||
+ | *Run Plan | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! Target || HMS angle || HMS momentum|| HMS collimator || SHMS angle || SHMS momentum || SHMS collimator || Time | ||
+ | |- | ||
+ | ! LH2 || 18.5 deg || -6.693 || pion || 8.5 deg || -9.430 || Collimator || 30 min | ||
+ | |- | ||
+ | ! LH2 || 18.5 deg || -6.693 || Pion || 8.5 deg || -7.3 || Collimator || 30 min | ||
+ | |- | ||
+ | ! 1.5% carbon || 18.5 deg || -5.816 || Sieve || 8.5 deg || -7.3 || Centered Sieve || 1 hr | ||
+ | |- | ||
+ | ! LH2 || 18.5 deg || -5.816 || Pion || 16.5 deg || -7.234 || Collimator || 1 hr | ||
+ | |- | ||
+ | ! LH2 || 18.5 deg || -5.816 || Pion || 16.5 deg || -5.5 || Collimator || 1 hr | ||
+ | |- | ||
+ | ! 1.5% carbon || 18.5 deg || -5.816 || Sieve || 16.5 deg || -5.5 || Centered Sieve || 2 hr | ||
+ | |} | ||
+ | |||
+ | == BCM Calibration ( 1 hour) == | ||
* | * | ||
+ | |||
+ | == Use GEM to check out SHMS optics == | ||
+ | * Experts: Latif | ||
+ | * Expected time: | ||
+ | * Goal: | ||
+ | * Conditions: | ||
+ | {|class="wikitable" style="margin-left: 60px; margin-right: auto; border: none;" | ||
+ | |- | ||
+ | ! beam current: || <1 μA | ||
+ | |- | ||
+ | ! fast raster: || off | ||
+ | |- | ||
+ | ! target: || optics targets | ||
+ | |- | ||
+ | ! SHMS collimator: || Collimator | ||
+ | |- | ||
+ | ! SHMS trigger: || 3/4 Scin + Cer | ||
+ | |- | ||
+ | ! SHMS angle/momentum || 25. deg, -2.0 GeV/c | ||
+ | |} | ||
+ | *Run Plan: |
Latest revision as of 14:53, 29 January 2018
Beam energy of 2.2 GeV
Beam energy of 6.4 GeV
Initial conditions
- HMS/SHMS Conditions:
HMS/SHMS collimator: | PION , COLLIMATOR |
---|---|
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Beam Checkout with Superharps and Beam Position Monitors (3 hours)
- Experts: Mark Jones, Deb Biswas, Thir Guatam
- Expected time: 3 hours
- Goals: Initial measurement of beam spot size. Followed by calibration of girder BPMs at 5,30 and 60uA. Measure raster size with superharps.
- Conditions:
beam current: | 5,30 and 60 μA |
---|---|
fast raster: | off |
target: | none |
- Runplan: pdf file
- Ask MCC to do superharp scan with superharps IHA3H07A and IHA3H07B and put entry in ELOG. Record the 3 BPMs positions (3H07A,3H07B,3H07C) during scan.
- Want beam spot with sigma_x and sigma_y below 200 um ( beam pass 1-4) and below 300 um for beam pass 5.
- Verify Girder BPM position to Harp positions.
Center beam on C-hole target ( 1 hour)
- Experts:
- Expected time: 1 hour
- Goal: Center beam on carbon hole target
- Conditions:
beam current: | 5 μA |
---|---|
fast raster: | 3x3mm |
target: | carbon hole |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
- Run plan: Procedure
- Once hole is found, take 20 minutes run at 20uA for good statistics
Detailed Detector Checkout ( 2 hour)
- Experts:
- Expected time: 2 hour
- Prerequisite: Eric Pooser will do invasive checkout of HMS/SHMS trigger with beam.
- Conditions:
beam current: | 20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Trigger
- Set HMS/SHMS trigger threshold for PID trigger section to 10 mV.
- Software cuts can be placed on trigger ADC data to study efficiencies.
Cerenkov
- SHMS Noble Gas Run Plan: Scan of HV ( Eric Pooser)
Run 1 HV Settings: PMT1 = 2200 V, PMT2 = 2230 V, PMT3 = 2115, PMT4 = 2030 Run 2 HV Settings: PMT1 = 2300 V, PMT2 = 2320 V, PMT3 = 2215, PMT4 = 2130
- These are the spring 2017 KPP HV settings for reference: NGC1 : 2255 V, NGC2 : 2280 V, NGC3 : 2165 V, NGC4 : 2087 V
- We will also need to check the NGCER sum the PID trigger circuit to ensure that we are not saturating the FADC channel
- Run plan (series of 15 minutes runs)
Run | HMS DAQ | SHMS DAQ | Comments |
---|---|---|---|
1 | No data taking | Only 3/4 scin trigger | Checkout of HMS 3/4 trigger ; SHMS NGC HV NGC1 : 2255 V, NGC2 : 2280 V, NGC3 : 2165 V, NGC4 : 2087 V |
2 | Only 3/4 scin trigger | No data taking | Checkout of SHMS 3/4 trigger |
3 | Only 3/4 scin trigger | Only 3/4 scin trigger | Checkout of HMS ELCLEAN/ELREAL trigger; SHMS NGC HV PMT1 = 2200 V, PMT2 = 2230 V, PMT3 = 2115, PMT4 = 2030 |
4 | Only 3/4 scin trigger | Only 3/4 scin trigger | Checkout of HMS ELCLEAN/ELREAL trigger ; SHMS NGC HV PMT1 = 2300 V, PMT2 = 2320 V, PMT3 = 2215, PMT4 = 2130 |
5 | Only ELCLEAN trigger | Only 3/4 scin trigger | Checkout of SHMS ELCLEAN/ELREAL trigger |
6 | Only ELREAL trigger | Only 3/4 scin trigger | Checkout of SHMS ELCLEAN/ELREAL trigger |
7 | ELREAL trigger, prescale 3/4 SCIN | Only ELCLEAN | |
8 | ELCLEAN trigger, prescale 3/4 SCIN | Only ELREAL | |
9 | ELCLEAN trigger, different prescale 3/4 SCIN | ELREAL, prescale 3/4 scin |
Checkout of SHMS/HMS focal plane tune ( 1 hour)
- Experts:
- Expected time: 1 hour
- Goal: Look at focal plane with sieve to check tune
- Conditions:
beam current: | 20 μA |
---|---|
fast raster: | off |
target: | 0.5% carbon |
HMS/SHMS collimator: | SIEVE , Centered sieve |
HMS/SHMS trigger: | SCIN 3/4,SCIN 3/4 |
HMS angle/momentum | 15 deg, -3.0 GeV/c |
SHMS angle/momentum | 15 deg, -3.0 GeV/c |
Different Pi/e ratios ( 1.5 hour)
- Experts: SImona
- Expected time: 1.5 hr
- Goal:
- Runs with different central momentum and different pi/e ratios.
- Two runs with LH2 and one with LD2
- Take each setting with only 3/4 scin trigger and for 30 minutes
- Set PID tirgger thresholds to 10 mV. Offline will determine thresholds to test later.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2, 10cm LD2 |
HMS/SHMS collimator: | Pion/Collimator |
HMS/SHMS trigger: | SCIN 3/4 / SCIN 3/4 |
SHMS/HMS angle/momentum | 25. deg, -3.0 GeV/c, -1.4 |
- Run Plan
HMS angle/mom | SHMS angle/mom | Target | HMS/SHMS Trigger |
---|---|---|---|
25./-3.0 | 25./-3.0 | 10cm LH2 | Only 3/4 scin |
25./-1.4 | 25./-1.4 | 10cm LH2 | Only 3/4 scin |
25./-1.4 | 25./-1.4 | 10cm LD2 | Only 3/4 scin |
Defocused Tune for SHMS/HMS ( 1 hour)
- Experts: Hamlet
- Expected time: 1 hr
- Goal: Have a wider y_fp to calibrate the calorimeter over regions that are not usually hit with the standard hourglass tune.
- Conditions:
beam current: | 5-20 μA |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2 |
HMS/SHMS collimator: | Pion/Collimator |
HMS/SHMS trigger: | SCIN 3/4 / SCIN 3/4 |
SHMS/HMS angle/momentum | 25. deg, -3.0 GeV/c, Q2 at 1.2 times normal |
- Run Plan:Documents
Elastic p(ep) Checkout Small angle (2 hours)
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 10 μA |
---|---|
fast raster: | 1x1mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 13.5/16. deg / 5.398/5.074 GeV |
SHMS angle/momentum | 8.,10.,13.5 deg / 6.017,5.814,5.398 GeV |
- Run plan
HMS Angle/Mom | HMS rate | SHMS Angle/Mom | SHMS rate | Run time |
---|---|---|---|---|
13.5/5.398 | 300 | 8./6.017 | 3300 Hz | 15 minutes |
13.5/5.398 | 300 | 10./5.817 | 1000 | 30 minutes |
16.0/5.074 | 100 | 13.5/5.398 | 150 | 60 minutes |
HMS/SHMS Angle and Position Matrix Optimization (5 hours)
- Experts:
- Expected time: 5 hours.
- Goal:
- Conditions:
beam current: | 20 μA ( more is better) |
---|---|
fast raster: | off |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered/Shifted Sieve |
HMS/SHMS trigger: | 3/4 scin, 3/4 scin |
HMS angle/momentum | 15 and 22. deg, |
SHMS angle/momentum | 15. and 22. deg, |
- Series of runs changing target.
- SHMS has two sieves with the holes shifted in the horizontal.
- HMS has only one sieve which will always be used.
- No raster.
- Time is assuming 20uA.
Target | HMS angle | HMS momentum | SHMS angle | SHMS momentum | SHMS collimator | Time |
---|---|---|---|---|---|---|
0,+/- 10cm | 15. deg | -4.0 | 15. deg | -4.0 | Centered Sieve | 30 min |
0,+/- 10cm | 15. deg | -4.0 | 15. deg | -4.0 | Shifted Sieve | 30 min |
+/- 5cm | 15. deg | -4.0 | 15. deg | -4.0 | Centered Sieve | 30 min |
+/- 5cm | 15. deg | -4.0 | 15. deg | -4.0 | Shifted Sieve | 30 min |
0,+/- 10cm | 22. deg | -3.2 | 22. deg | -3.2 | Centered Sieve | 1.5 hr |
0,+/- 10cm | 22. deg | -3.2 | 22. deg | -3.2 | Shifted Sieve | 1.5 hr |
Large Ytar: HMS/SHMS Angle and Position Matrix Optimization (9 hours)
- Experts:
- Expected time: 9 hours.
- Goal:
- Conditions:
beam current: | 20 μA |
---|---|
fast raster: | off |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered Sieve |
HMS/SHMS trigger: | 3/4 scin, 3/4 scin |
HMS angle/momentum | 30. deg, -2.0 GeV/c |
SHMS angle/momentum | 30. deg, -2.0 GeV/c |
Check of ELREAL/ELCLEAN Trigger ( 1.5 hour)
- Experts: SImona
- Expected time: 1.5 hr
- Goal:
- Use threshold determined form previous LD2 running
- Sanity check of electron triggers.
- Conditions:
beam current: | 20 μA |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2 |
HMS/SHMS collimator: | Pion/Collimator |
HMS/SHMS trigger: | Electron triggers |
SHMS/HMS angle/momentum | 25. deg, -3.0 GeV/c, -1.4 |
- Run Plan
HMS angle/mom | SHMS angle/mom | Target | HMS/SHMS Trigger | Total DAQ Triggers |
---|---|---|---|---|
25./-3.0 | 25./-3.0 | 10cm LH2 | Only 3/4 scin (prescale trig1=0,trig2=-1,trig3=-1) | 300K |
25./-3.0 | 25./-3.0 | 10cm LH2 | ELREAL (prescale trig1=-1,trig2=0,trig3=-1) | 300K |
25./-3.0 | 25./-3.0 | 10cm LH2 | ELCLEAN (prescale trig1=-1,trig2=-1,trig3=0) | 300K |
25./-1.4 | 25./-1.4 | 10cm LH2 | Only 3/4 scin (prescale trig1=0,trig2=-1,trig3=-1) | 300K |
25./-1.4 | 25./-1.4 | 10cm LH2 | ELREAL (prescale trig1=-1,trig2=0,trig3=-1) | 300K |
25./-1.4 | 25./-1.4 | 10cm LH2 | ELCLEAN (prescale trig1=-1,trig2=-1,trig3=0) | 300K |
Coincidence Checkout [9 hrs]
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 20-50 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION/SIEVE , COLLIMATOR/CENTERED SIEVE |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | 27.5 deg, -3.609 GeV/c |
SHMS angle/momentum | 27.5 deg, +3.609 GeV/c |
- Series of runs with/without collimator on electron side and switch polarities between HMS/SHMS.
- Last run is used to evaluate accidentals.
HMS angle | HMS momentum | SHMS angle | HMS collimator | SHMS momentum | SHMS collimator | Time |
---|---|---|---|---|---|---|
27.5 deg | +3.609 | 27.5 deg | Pion | -3.609 | Collimator | 30 min (4Hz at 20uA) |
27.5 deg | +3.609 | 27.5 deg | Pion | -3.609 | Centered Sieve | 2 hr |
27.5 deg | -3.609 | 27.5 deg | Pion | +3.609 | Collimator | 30 min (4Hz at 20uA) |
27.5 deg | -3.609 | 27.5 deg | Sieve | +3.609 | Collimator | 2 hr |
27.5 deg | -3.609 | 35.0 deg | Pion | +3.609 | Collimator | 1 hr |
Additional Large Ytar: HMS/SHMS Angle and Position Matrix Optimization (6 hours)
- Experts:
- Expected time: 6 hours.
- Goal:
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 |
target: | optics targets |
HMS/SHMS collimator: | Sieve , Centered Sieve |
HMS/SHMS trigger: | 3/4 scin, 3/4 scin |
HMS angle/momentum | 25.5,22 deg, -2.6,-3.2 GeV/c |
SHMS angle/momentum | 30.,22 deg, -2.0,-3.2 GeV/c |
- Run Plan: Time is assuming 65uA. Take one hour long runs. Should take about 5 hours for +/-10cm data and 1 hour for +/-5cm data.
Target | HMS angle | HMS momentum | SHMS angle | SHMS momentum | SHMS collimator | Counts |
---|---|---|---|---|---|---|
0,+/- 10cm | 25. deg | -2.6 | 30. deg | -2.0 | Centered Sieve | Total of 4.0M SHMS triggers. |
+/- 5cm | 22. deg | -3.2 | 22. deg | -3.2 | Centered Sieve | Total of 1.0M SHMS Triggers. |
Additional Coincidence Checkout [3 hr]
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- Cycle SHMS for each change when raising momentum
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 22.0 deg | -4.284 | 33.3 deg | +2.925 | 30 min (65Hz) |
0.5% carbon | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 22.0 deg | -4.284 | 33.3 deg | +2.925 | 10min |
0.5% carbon | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 35.0 deg | -2.869 | 22.0 deg | +4.38 | 10 min |
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 35.0 deg | -2.869 | 22.0 deg | +4.38 | 30 min (6Hz) |
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 50.0 deg | -1.864 | 15.3 deg | +5.41 | 1.5 hrs (0.6Hz) |
0.5% carbon | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 50.0 deg | -1.864 | 15.3 deg | +5.41 | 10 min |
- Run until 8am when Jay Benesch in MCC will do the beam energy measurement.
Beam Energy Measurement (3 hours)
- Experts: MCC, Jay Benesch
- Expected time: 3 hours
- Goal: Measure beam energy for elastics
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
Target LH2/LD2 boiling study
- Experts: Eric Pooser
- Expected time:
- Goal: Measure target boiling.
- Conditions:
beam current (uA): | 2, 7, 10, 20, 30, 40, 50, 60, 65 |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2, 10cm LD2, 0.5% Carbon, *Al 10 cm Dummy only at 20 and 40 muA* |
SHMS/HMS collimator: | Collimator/PION |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum: | 15 deg / -3 GeV/c |
HMS trigger: | SCIN 3/4 |
HMS angle/momentum: | 15 deg / -3 GeV/c |
- Run Plan:
- Set spectrometers to above settings
- For each target, do nine separate runs for each current and take 200,000 events.
Target | Trigger | Currents |
---|---|---|
10cm LH2 | ps1=#, rest to -1, Set # so deadtime is 20% | 2, 7, 10, 20, 30, 40, 50, 60, 65 |
10cm LD2 | ps1=#, rest to -1, Set # so deadtime is 20% | 2, 7, 10, 20, 30, 40, 50, 60, 65 |
0.5% carbon | ps1=#, rest to -1, Set # so deadtime is 20% | 2, 7, 10, 20, 30, 40, 50, 60, 65 |
10 cm dummy | ps1=#, rest to -1, Set # so deadtime is 20% | 20,40 |
Final Checkout of SHMS ELREAL/ELCLEAN Trigger ( 3 hour)
- Experts: Simona Malace
- Expected time: 3 hr
- Goal:
- Take data to determine thresholds.
- Sanity check of electron triggers.
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2 |
SHMS collimator: | Collimator |
SHMS trigger: | Various triggers |
SHMS angle/momentum | 25. deg, -3.0 GeV/c, -1.4 |
- Run Plan
- Take run with 3/4 and threshold at 10mV
- Take run with 3/4 and thresholds at: SHMS (PRLO = 10 mV, PRHI = 15 mV, CER = 10 mV)
- Take run with ELREAL only trigger
- Take run with ELCLEAN trigger
- Analyze results and confirm that expected efficiencies are achieved.
- Lower spectrometer momentum to -1.4 GeV to increase pi/e ratio.
- Repeat all of above
SHMS angle/mom | Target | SHMS Trigger | Trigger Thresholds | Total DAQ Triggers |
---|---|---|---|---|
25./-3.0 | 10cm LH2 | Only 3/4 trigger | All PID legs to 10mV | 300K |
25./-3.0 | 10cm LH2 | Only 3/4 trigger | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
25./-3.0 | 10cm LH2 | Only ELREAL | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
25./-3.0 | 10cm LH2 | Only ELCLEAN | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
25./-1.4 | 10cm LH2 | Only 3/4 trigger | All PID legs to 10mV | 300K |
25./-1.4 | 10cm LH2 | Only 3/4 trigger | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
25./-1.4 | 10cm LH2 | Only ELREAL | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
25./-1.4 | 10cm LH2 | Only ELCLEAN | SHMS PID legs to: PRLO = 10mV, PRHI = 15 mV, CER =10 mV | 300K |
SHMS Elastic Single arm Checkout Additional angles (4 hours)
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 65uA |
---|---|
fast raster: | 2x2mm2 |
target: | 0.5% carbon, 10cm LH2 |
SHMS collimator: | PION , COLLIMATOR |
SHMS trigger: | SCIN 3/4, SCIN 3/4 |
SHMS angle/momentum | 16,20 ,30,35 deg / 5.074,4.522,3.349,2.869 GeV |
- Run plan
- Take 15 min run with 0.5% carbon. Run LH2 for 10,000 events in elastic W for SHMS at 16 deg.
- Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 20 deg
- Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 30 deg
- Take 15 min run with 0.5% carbon. Run for 10,000 events in elastic W for SHMS at 35 deg
CT Physics [53 hrs]
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 mm2 |
target: | 10cm LH2 |
HMS/SHMS collimator: | PION , COLLIMATOR |
HMS/SHMS trigger: | Coincidence |
HMS angle/momentum | Various |
SHMS angle/momentum | Various |
- Run Plan:
- HMS is detecting electrons and SHMS is detecting protons.
- Use HMS pion collimator and SHMS collimator.
- Keep track of good coincidence physics events (with tight PID cuts and coincidence time cut) such that we have 10000 events each for LH2 and Carbon
Target | Prescales | HMS angle | HMS momentum | SHMS angle | SHMS momentum | Time |
---|---|---|---|---|---|---|
LH2 | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 12 hrs |
LH2 | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min |
Al. Dummy | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 4 hrs |
6% C | ps1=-1,ps2=-1,ps3=-1,ps4=-1,ps5=-1,ps6=0 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 36 hrs |
6% C | ps1=0,ps2=-1,ps3=-1,ps4=0,ps5=-1,ps6=-1 | 45.1 deg | -2.131 | 17.1 deg | +5.122 | 30 min |
- If possible after completing the LH2 and Dummy we can move to F2 Physics program and come back to the Carbon after the F2 physics program
F2 Physics
Remaining Commissioning
SHMS Elastic Single arm Checkout Additional angles (4 hours)
- Experts:
- Expected time:
- Goal:
- Conditions:
beam current: | 65uA |
---|---|
fast raster: | 2x2mm2 |
target: | 10cm LH2 |
SHMS collimator: | COLLIMATOR/Center sieve |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum | 25 ,30 / -3.911,-3.349 |
- Run plan
- Take data at SHMS angle = 25 and momentum = -3.911 with collimator for 30 minutes.
- Take data at SHMS angle = 25 and momentum = -3.911 with centered Sieve for 1 hour.
- Take data at SHMS angle = 25 and momentum = -3.6 with collimator for 30 minutes.
- Take data at SHMS angle = 25 and momentum = -3.349 with collimator for 30 minutes.
- Take data at SHMS angle = 30 and momentum = -3.349 with collimator for 1 hour.
- Take data at SHMS angle = 30 and momentum = -3.349 with centered sieve for 2 hour.
22 deg Ytar: SHMS Angle and Position Matrix Optimization (1 hours)
- Experts:
- Expected time: 1 hours.
- Goal: Need more optics data for SHMS at large angles.
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 |
target: | 0,+/- 10cm |
SHMS collimator: | Centered Sieve,Shifted Sieve |
SHMS trigger: | ELREAL |
SHMS angle/momentum | 22 deg, -3.2 GeV/c |
- Run Plan: Take during switch in HMS polarity. Time is assuming 65uA.
Target | SHMS angle | SHMS momentum | SHMS collimator | Time |
---|---|---|---|---|
0,+/- 10cm | 22. deg | -3.2 | Centered Sieve | 30 minutes |
0,+/- 10cm | 22. deg | -3.2 | Shifted Sieve | 30 minutes |
SHMS Low momentum electrons and large angle (3 hours)
- Experts: Eric Christy
- Expected time: 3 hours.
- Goal:
- Conditions:
beam current: | 65 μA, 40uA (Aluminum dummy) |
---|---|
fast raster: | 2x2 |
target: | 10cm Lh2, 10cm Al dummy |
SHMS collimator: | collimator |
SHMS trigger: | ELREAL |
SHMS angle/momentum | 35 deg, -2.6 GeV/c |
- Run Plan: Take while HMS with positive polarity is taken. Time is assuming 65uA.
Target | SHMS angle | SHMS momentum | Time |
---|---|---|---|
10cm Lh2 | 35. deg | -2.6 | 2 hours |
10cm | 35. deg | -2.6 | 20 minutes |
30 deg Ytar: HMS/SHMS Angle and Position Matrix Optimization (3 hours)
- Experts:
- Expected time: 3 hours.
- Goal: Need more optics data for SHMS at large angles.
- Conditions:
beam current: | 65 μA |
---|---|
fast raster: | 2x2 |
target: | optics targets |
SHMS collimator: | Centered Sieve |
SHMS trigger: | ELREAL |
SHMS angle/momentum | 30. deg, -2.0 GeV/c |
- Run Plan: Time is assuming 65uA. Take one hour long runs.
Target | SHMS angle | SHMS momentum | SHMS collimator | Time |
---|---|---|---|---|
0,+/- 10cm | 30. deg | -2.0 | Centered Sieve | 3 hours |
Repeat Target LH2 boiling study with new SHMS sheilding
- Experts:
- Expected time:
- Goal: With new SHMS shielding reconfiguration, repeat LH2 measurement and see if background reduced.
- Conditions:
beam current (uA): | 10, 30 , 65 |
---|---|
fast raster: | 2x2mm |
target: | 10cm LH2 |
SHMS/HMS collimator: | Collimator/PION |
SHMS trigger: | SCIN 3/4 |
SHMS angle/momentum: | 15 deg / -3 GeV/c |
- Run Plan:
Target | Trigger | Currents |
---|---|---|
10cm LH2 | ps1=#, rest to -1, Set # so deadtime is 20% | 10, 30, 65 |
Lower priority
Beam energy of 10.6 GeV
Beam Energy Measurement
- Experts: MCC,Mark Jones, Dave Mack
- Expected time: ? hours
- Goal: Measure beam energy for carbon elastics.
- Conditions:
beam current: | 5uA |
---|---|
fast raster: | off |
target: | none |
- MCC procedure
HMS/SHMS Tune Verification
- Experts:
- Expected time:
- Goal:
- Mix of ep elastic data, and carbon data to check SHMS tune.
- Also LH2 inelastic to calibrate the calorimeter.
- Conditions:
beam current: | max current μA |
---|---|
fast raster: | 2x2 |
target: | 1.5% carbon, 10 LH2 |
HMS/SHMS collimator: | PION/SIEVE , COLLIMATOR/Centered Sieve |
HMS/SHMS trigger: | SCIN 3/4, SCIN 3/4 |
HMS angle/momentum | see table |
SHMS angle/momentum | see table |
- Run Plan
Target | HMS angle | HMS momentum | HMS collimator | SHMS angle | SHMS momentum | SHMS collimator | Time |
---|---|---|---|---|---|---|---|
LH2 | 18.5 deg | -6.693 | pion | 8.5 deg | -9.430 | Collimator | 30 min |
LH2 | 18.5 deg | -6.693 | Pion | 8.5 deg | -7.3 | Collimator | 30 min |
1.5% carbon | 18.5 deg | -5.816 | Sieve | 8.5 deg | -7.3 | Centered Sieve | 1 hr |
LH2 | 18.5 deg | -5.816 | Pion | 16.5 deg | -7.234 | Collimator | 1 hr |
LH2 | 18.5 deg | -5.816 | Pion | 16.5 deg | -5.5 | Collimator | 1 hr |
1.5% carbon | 18.5 deg | -5.816 | Sieve | 16.5 deg | -5.5 | Centered Sieve | 2 hr |
BCM Calibration ( 1 hour)
Use GEM to check out SHMS optics
- Experts: Latif
- Expected time:
- Goal:
- Conditions:
beam current: | <1 μA |
---|---|
fast raster: | off |
target: | optics targets |
SHMS collimator: | Collimator |
SHMS trigger: | 3/4 Scin + Cer |
SHMS angle/momentum | 25. deg, -2.0 GeV/c |
- Run Plan: