Difference between revisions of "A1nd2n-ERR"

From HallCWiki
Jump to: navigation, search
(Agenda • Monday March 19, 2018)
(COO, RSAD, ESAD and OSPs)
 
(26 intermediate revisions by 3 users not shown)
Line 12: Line 12:
 
==Charge==
 
==Charge==
 
*[[Media:ERR-charge.pdf|Charge for the Committee]]
 
*[[Media:ERR-charge.pdf|Charge for the Committee]]
 +
 +
==Report==
 +
* [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/3He_ERR_Report.pdf 3He_ERR_Report.pdf (dated April 4th, 2018)]
 +
 +
== Committee Questions & Responses==
 +
# [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Questions-from-Committee/Questions-A1n_D2n_ERR.pdf Questions from Committee] (17 Mar 2018)
 +
## [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Questions-from-Committee/Response_to_Questions-A1nd2n-18Mar2018.pdf Responses from Collaboration (18 March 2018)]
 +
# [[Media:3He_ERR_Reply_to_Final_Report-updated-08July2019v2.pdf|Follow-up from Collaboration (July 8, 2019)]]
 +
## [[Media:A1n_d2n_Final Report_addended-01Aug2019.pdf | Updated Final Report from Committee (Aug. 1, 2019)]]
  
 
== Agenda • Monday March 19, 2018 ==
 
== Agenda • Monday March 19, 2018 ==
 
'''Room:  Cebaf Center L102'''
 
'''Room:  Cebaf Center L102'''
  
NOTICE: The wiki's file handling is broken at the moment (CCPR has been entered), so we'll have to do this in a few steps.
+
=== Bluejeans Connection Info ===
 
+
  https://bluejeans.com/850126485
  Presenters: You will need to copy your talk to this directory:
+
                /group/hallc/www/hallcweb/html/experiments/A1n/meetings/ERR_Talks/
+
              And then update the link in the agenda below by logging into the wiki, clicking the 'Edit' link
+
              next to 'Preliminary Agenda' and replacing the 'TBD.pdf' file name associated with your talk below
+
              to the filename you used.
+
             
+
Email your talk to Brad S or Xiaochao Z. if you have any problems. 
+
  
 +
Phone Dial-in
 +
+1.408.740.7256 (United States)
 +
+1.888.240.2560 (US Toll Free)
 +
+1.408.317.9253 (Alternate number)
 +
Global Numbers: http://bluejeans.com/numbers
 +
Meeting ID: 850 126 485
 +
 +
=== Program • Cebaf Center L102 ===
 
{| class="wikitable" cellpadding="50 px" cellspacing="50 px"
 
{| class="wikitable" cellpadding="50 px" cellspacing="50 px"
 
! style="text-align:left;"| Time  
 
! style="text-align:left;"| Time  
Line 34: Line 44:
 
| '''8:30''' || Closed Session
 
| '''8:30''' || Closed Session
 
|-
 
|-
| '''9:00''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/A1n_overview-Zheng_v2.pdf A1n overview and running conditions] (1, 2a)  ||  Xiaochao Zheng || 10+5
+
| '''9:00''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/A1nERR_Zheng_talk1_v4.pdf A1n overview and running conditions] (1, 2a)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
| '''9:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/d2n-overview_sawatzky_v2.pdf d2n overview and running conditions] (1, 2a)  ||  Brad Sawatzky || 10+5
+
| '''9:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/d2n-overview_sawatzky_v4.pdf d2n overview and running conditions] (1, 2a)  ||  Brad Sawatzky || 10+5
 
|-
 
|-
| '''9:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/polHe3_JP_v3.pdf Polarized 3He target] (2a, 2b, 3)  ||  Jianping Chen || 30+10
+
| '''9:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/polHe3_JP_v4.pdf Polarized 3He target] (2a, 2b, 3)  ||  Jianping Chen || 30+10
 
|-
 
|-
|'''10:10''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/TBD.pdf (TBD) Magnetic field calculations and compensation coils] (3)  ||  Steve Lassiter/Gordon Cates || 10+5
+
|'''10:10''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/cates_magnetic_field_issues_hall_c_a1n_v2.pdf Magnetic field calculations and compensation coils] (3)  ||  Steve Lassiter/Gordon Cates || 10+5
 
|-
 
|-
 
|'''10:35''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/a1n_d2n_beamline_moller-ERR_v5.pdf Beamline, Moller polarimetry] (4, 2c)  ||  Dave Gaskell || 15+10  
 
|'''10:35''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/a1n_d2n_beamline_moller-ERR_v5.pdf Beamline, Moller polarimetry] (4, 2c)  ||  Dave Gaskell || 15+10  
Line 46: Line 56:
 
|'''11:00''' || colspan="3"|Coffee Break
 
|'''11:00''' || colspan="3"|Coffee Break
 
|-
 
|-
|'''11:20''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/Pol._He3_target_installation_Hall_C_2019_ERR_power_point_Rev._2-15Mar2018.pptx Installation Presentation] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.mpp [Schedule (MS Project)]] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.pdf [Schedule (PDF)]] (5) ||  Walter Kellner || 15+10
+
|'''11:20''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/Pol._He3_target_installation_Hall_C_2019_ERR_power_point_Rev._3-17Mar2018.pptx Installation Presentation] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.mpp [Schedule (MS Project)]] [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Installation-Kellner/He3_Target_installation_Hall_C_2019_Rev_2-15Mar2018.pdf [Schedule (PDF)]] (5) ||  Walter Kellner || 15+10
 
|-
 
|-
 
|'''11:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/detector-systems_sawatzky_v1.pdf Spectrometer and detector system] (4)  ||  Brad Sawatzky || 10+5
 
|'''11:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/detector-systems_sawatzky_v1.pdf Spectrometer and detector system] (4)  ||  Brad Sawatzky || 10+5
Line 54: Line 64:
 
|'''12:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Jixie_A1ND2N_ERR_Radiation_201803.pdf Radiation levels outside and in the hall, and shielding] (7)  || Jixie Zhang || 10+5
 
|'''12:15''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/Jixie_A1ND2N_ERR_Radiation_201803.pdf Radiation levels outside and in the hall, and shielding] (7)  || Jixie Zhang || 10+5
 
|-
 
|-
|'''12:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/A1nERR_Zheng_talk2_v2.pdf A1n timeline, manpower, analysis and publication plan, documentation and summary] (5,8,9)  ||  Xiaochao Zheng || 10+5
+
|'''12:30''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/A1nERR_Zheng_talk2_v4.pdf A1n timeline, manpower, analysis and publication plan, documentation and summary] (5,8,9)  ||  Xiaochao Zheng || 10+5
 
|-
 
|-
 
|'''12:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/d2n-analysis_sawatzky_v2.pdf d2n timeline, manpower, analysis and publication plan, documentation and summary] (5,8)  ||  Brad Sawatzky || 10+5
 
|'''12:45''' || [https://hallcweb.jlab.org/experiments/A1n/meetings/ERR_Talks/d2n-analysis_sawatzky_v2.pdf d2n timeline, manpower, analysis and publication plan, documentation and summary] (5,8)  ||  Brad Sawatzky || 10+5
Line 70: Line 80:
 
= Additional Documentation =
 
= Additional Documentation =
  
== COO, ESAD and OSPs ==
+
== COO, RSAD, ESAD and OSPs ==
 +
* [https://hallcweb.jlab.org/safety-docs/Pol3He_2019/ Main Repository]
 +
* [https://hallcweb.jlab.org/experiments/A1n/safety_docs/RSAD_Hall_C_2019_Fall_signed.pdf RSAD (final)]
 
* [https://hallcweb.jlab.org/experiments/A1n/safety_docs/COO_a1nd2n.pdf COO draft]
 
* [https://hallcweb.jlab.org/experiments/A1n/safety_docs/COO_a1nd2n.pdf COO draft]
 
* [https://hallcweb.jlab.org/experiments/A1n/safety_docs/ESAD_a1nd2n.pdf ESAD draft]
 
* [https://hallcweb.jlab.org/experiments/A1n/safety_docs/ESAD_a1nd2n.pdf ESAD draft]
 +
  
 
=== Moller-related (Drafts) ===
 
=== Moller-related (Drafts) ===
Line 84: Line 97:
  
 
== General Hall C Documentation ==
 
== General Hall C Documentation ==
 
 
* [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Hall C Standard Equipment Manual]
 
* [https://hallcweb.jlab.org/safety-docs/current/Standard-Equipment-Manual.pdf Hall C Standard Equipment Manual]
 
* [https://hallcweb.jlab.org/safety-docs/current/ERG_HALLC.pdf Emergency Response Guidelines]
 
* [https://hallcweb.jlab.org/safety-docs/current/ERG_HALLC.pdf Emergency Response Guidelines]

Latest revision as of 14:52, 21 October 2019

ERR Committee Members

  • Pavel Degtiarenko
  • Alexandre Deur
  • Chris Keith (chair)
  • Renuka Rajput-Ghoshal
  • Bert Manzlak
  • Michael Tiefenback
  • Javier Gomez (observer)
  • Ed Folts (observer)

Charge

Report

Committee Questions & Responses

  1. Questions from Committee (17 Mar 2018)
    1. Responses from Collaboration (18 March 2018)
  2. Follow-up from Collaboration (July 8, 2019)
    1. Updated Final Report from Committee (Aug. 1, 2019)

Agenda • Monday March 19, 2018

Room: Cebaf Center L102

Bluejeans Connection Info

https://bluejeans.com/850126485
Phone Dial-in
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number)
Global Numbers: http://bluejeans.com/numbers
Meeting ID: 850 126 485

Program • Cebaf Center L102

Time Agenda Item (Charge item addressed) Speaker Duration
8:30 Closed Session
9:00 A1n overview and running conditions (1, 2a) Xiaochao Zheng 10+5
9:15 d2n overview and running conditions (1, 2a) Brad Sawatzky 10+5
9:30 Polarized 3He target (2a, 2b, 3) Jianping Chen 30+10
10:10 Magnetic field calculations and compensation coils (3) Steve Lassiter/Gordon Cates 10+5
10:35 Beamline, Moller polarimetry (4, 2c) Dave Gaskell 15+10
11:00 Coffee Break
11:20 Installation Presentation [Schedule (MS Project)] [Schedule (PDF)] (5) Walter Kellner 15+10
11:45 Spectrometer and detector system (4) Brad Sawatzky 10+5
12:00 Beam commissioning and machine protection (6) Jay Benesch 10+5
12:15 Radiation levels outside and in the hall, and shielding (7) Jixie Zhang 10+5
12:30 A1n timeline, manpower, analysis and publication plan, documentation and summary (5,8,9) Xiaochao Zheng 10+5
12:45 d2n timeline, manpower, analysis and publication plan, documentation and summary (5,8) Brad Sawatzky 10+5
13:00 Lunch and executive session
16:00 Close-out

Polarized He-3 Proposals

E12-06-110 (A1n)

Measurement of the neutron spin asymmetry A1n in the valence quark region using a 11 GeV beam and a polarized 3He target in Hall C

  • E12-06-110 (A1n) proposal for PAC30 - detailed physics motivation and rates/uncertainties assuming the 6 GeV polarized 3He target performance
  • E12-06-110 (A1n) Update for PAC36 - in this update we used the stage-II target upgrade performance - approved for 36 PAC days
  • E12-06-110 (A1n) 2018 Update - in this update we summarize the rate and uncertainty estimation using the stage-I polarized 3He target and with the latest HMS and SHMS simulations, while keeping the total approved beam time (36 PAC days) unchanged. Some of the kinematic settings have been modified to reflect the latest status of the HMS or SHMS.

E12-06-121 (d2n-g2n)

E12-06-121A (Measurement of 3He Elastic Electromagnetic Form Factor Diffractive Minima Using Polarization Observables)

Additional Documentation

COO, RSAD, ESAD and OSPs


Moller-related (Drafts)

Polarized He3 Target (Draft)

General Hall C Documentation