Difference between revisions of "Testing SHMS Preshower"

From HallCWiki
Jump to navigationJump to search
Line 4: Line 4:
 
* Have checked setting each channel to 1400V that signal is seen.
 
* Have checked setting each channel to 1400V that signal is seen.
 
== Computer Setup ==
 
== Computer Setup ==
* Computer is called ''hallcn5''. The account is cdaq.
+
* Computer is called ''cnu''. The account is gep5.
 
== HV Setup ==
 
== HV Setup ==
 
* Can control the CAEN 403 through terminal on ''hallcn5''.
 
* Can control the CAEN 403 through terminal on ''hallcn5''.
 
[https://hallcweb.jlab.org/wiki/images/9/9c/Pre_Shower_Cabeling.pdf Preshower HV cabling map]
 
[https://hallcweb.jlab.org/wiki/images/9/9c/Pre_Shower_Cabeling.pdf Preshower HV cabling map]

Revision as of 13:03, 28 June 2012

Status

  • The preshower has been cabled with signal and HV.
  • Have checked setting each channel to 1400V that signal is seen.

Computer Setup

  • Computer is called cnu. The account is gep5.

HV Setup

  • Can control the CAEN 403 through terminal on hallcn5.

Preshower HV cabling map