(Created page with "{{Template:J/psi-007 Experiment Navigation With Logo}} = RC Meeting Information = <b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b> * Bluejea...")
 
(Notices in Effect for Shift Crew)
Line 57: Line 57:
 
= Notices in Effect for Shift Crew =
 
= Notices in Effect for Shift Crew =
 
* If rotation cannot be Reset, call the RC, then call Ops for an escorted/controlled access.
 
* If rotation cannot be Reset, call the RC, then call Ops for an escorted/controlled access.
 +
*Shift Checklists need to be done for every shift!
  
 
= Current Issues =
 
= Current Issues =

Revision as of 10:11, 15 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

  • Jack, Ethan, Steve and Joe hooking HMS Q2 power supply up to the magnet. Then need a long soak at some high current setting.
  • Ran C, LD2, Al dummy, LH2 targets for x>1 last night. Almost there, just needs to run other nuclear targets in the future.
  • Coincidence DAQ currently taking cosmics.


  • Summary of runs from last night:

1) x>1 LD2, Ep = -9.8, theta = 13.1 deg: run 7197, 7198, 7202-7205, 7207-7209

2) x>1 LH2, Ep = -9.8, theta = 13.1 deg: run 7210

3) x>1 Al, Ep=-9.8, theta = 13.1 deg: run 7201

4) x>1 1.5% C, Ep=-9.8, theta = 13.1 deg: runs 7199, 7200, 7206


Current Run Plan


  • Backup run plan: x>1 (11/14 hours = 39% of experiment total)
  • x>1 in 14 hours


Notices in Effect for Shift Crew

  • If rotation cannot be Reset, call the RC, then call Ops for an escorted/controlled access.
  • Shift Checklists need to be done for every shift!

Current Issues

Planned Accesses to the Hall

  • Restricted Access all day to work on HMS Q2 power supply.

Planned Accelerator Configuration Changes