Difference between revisions of "RC Meeting and Run Plan, Wednesday, February 27"

From HallCWiki
Jump to: navigation, search
(Created page with "{{Template:J/psi-007 Experiment Navigation With Logo}} = RC Meeting Information = <b> RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room </b> * Bluejea...")
 
(Current Status)
Line 28: Line 28:
 
= Current Status =
 
= Current Status =
  
* Good beam overnight. Finished with ~2 hrs on Dummy target for Phase-1 kinematics.
+
* [https://logbooks.jlab.org/entry/3660342 Rotation controller needs rebooted]. Will require access.  
* "RF Recovery" started at 8. Went to controlled access and [https://logbooks.jlab.org/entry/3660076 Steve did some work in the hall].
+
* Low current beam overnight.
* Rotated and set magnets for [https://hallcweb.jlab.org/wiki/index.php/Run_plan_for_J/psi-007#Phase_2:_Mid-E.2Flow-t Phase-2 kinematic]
+
* [https://logbooks.jlab.org/entry/3660401 HMS Q3 current readback errors]. Alarm silenced. Will require hall access to power cycle.  
* Beam came back around 1:30pm and pretty bad since.
+
* [https://logbooks.jlab.org/entry/3660419 SHMS Dipole tripped early in owl shift]. Remote PLC reboot fixed it.
* Will continue running J/Psi on kinematic Phase-2.
+
* [https://logbooks.jlab.org/entry/3660562 SHMS side camera not functional]
 +
* Beam was bad most of the morning/afternoon.
 +
* Will continue running J/Psi on kinematic Phase-3.
  
 
= Current Run Plan =
 
= Current Run Plan =

Revision as of 14:02, 27 February 2019

Main | Online | RC | Run Plan | Official Website | Redmine | Index | Nav
Jpsi007.png

RC Meeting Information

RC Daily Meetings are at 4:30 PM, 2nd floor Counting House Meeting Room

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Current Status

Current Run Plan

  • J/Psi Experiment:
  • Run Production Phase-2. Shooting for a total of 6.5 C for phase-2 kinematic before returning to Phase-3.

Notices in Effect for Shift Crew

  • Shift Leader is responsible for 50k replays. Even if the TO is actually doing them.
  • Target Operators: When the alarm handler goes white, it is disconnected from the IOC. Log it and include carlin@jlab.org every time. Acknowledge the warning. If it is still white and not coming back, restart the alarm handler. Do not permanently silence the alarm handler.
  • Missing Reference Times during the replay: check in the 50k. Check in full replay, if able. If it happens, call RC. Guidance to solve it is here: https://logbooks.jlab.org/entry/3654584


Current Issues

From Steve's logbook entry:

  • Concerning target alarms (loss of cooling power/over head) continued when running with hall A.

Planned Accesses to the Hall

Planned Accelerator Configuration Changes

Special Requests

  • Latif's GEM testing completed this morning during beam studies.