Difference between revisions of "Pol He-3 Target Information"
From HallCWiki
Jump to navigationJump to searchLine 16: | Line 16: | ||
=== Reboot Switches === | === Reboot Switches === | ||
+ | * [[Reboot Switch Operation]] --How to use reboot switches | ||
* [[hcreboot5]] --Devices in the Pol He3 Rack behind the Green Wall | * [[hcreboot5]] --Devices in the Pol He3 Rack behind the Green Wall | ||
* [[hcreboot6]] --Devices in the two racks under the pivot | * [[hcreboot6]] --Devices in the two racks under the pivot |
Revision as of 09:09, 6 December 2019
System Description
Checklists
- Checklist before starting Target Work inside the Enclosure
- Backout Checklist after Hall Access for Target Work
- Backout Checklist after Target Work inside Enclosure
Expert Information
Pol He3 Field Mapping Data
Circular Raster Information
- Raster Status Presentation Mark J., Bob M. (Dec 10, 2018 Collaboration Meeting)
Reboot Switches
- Reboot Switch Operation --How to use reboot switches
- hcreboot5 --Devices in the Pol He3 Rack behind the Green Wall
- hcreboot6 --Devices in the two racks under the pivot