Difference between revisions of "RC Meeting, Friday, September 17, 2021"

From HallCWiki
Jump to: navigation, search
(Current Issues)
(Planned Accesses to the Hall)
Line 41: Line 41:
  
 
= Planned Accesses to the Hall =
 
= Planned Accesses to the Hall =
*
+
* None.  Plan is to run through the weekend.
  
 
= Planned Accelerator Configuration Changes =
 
= Planned Accelerator Configuration Changes =

Revision as of 20:54, 16 September 2021

RC Meeting Information

RC Daily Meetings are at 10 am, remote

  • Bluejeans remote connection information:
 To join the Meeting:
 https://bluejeans.com/861439920
 To join via Room System:
 Video Conferencing System: bjn.vc -or-199.48.152.152
 Meeting ID : 861439920
 To join via phone :
 1)  Dial:
   +1.408.740.7256 (US (San Jose))
   +1.888.240.2560 (US Toll Free))
   +1.408.317.9253 (US (Primary, San Jose))
   (see all numbers - http://bluejeans.com/numbers)
 2)  Enter Conference ID : 861439920

Useful Links

Thursday Status

On Wednesday at 8:30am beam was stopped to Hall C and work to finish the RF separator work for Hall D cont. Around 7pm that work was rapping and up and was looking very promising for beam to Halls B,C and D. Unfortunately, the south linac dropped shortly after that and it took many hours to restore.

By approx. 2pm on Thursday, beam began coming back into Hall C and by 3pm we were into production running again.

Current Run Plan

  • Finish the current D(e,e'pi-)pp setting (likely around midnight)
  • Start the elastic calibration run (~ 5 hrs of data)
    • This is a a lot of changes, please carefully document all changes and check the replays.
    • There is a rotation to 7.06 degrees
  • Next Luminosity Scans
    • Again requires going to a small angle for the SHMS (7.5 degrees) and the HMS (12.5 degrees)
    • The two sets of scans require ~ 17 hrs of data

Current Issues

Planned Accesses to the Hall

  • None. Plan is to run through the weekend.

Planned Accelerator Configuration Changes

Special Requests