Difference between revisions of "NPS Run Plan (2023)"

From HallCWiki
Jump to navigationJump to search
(→‎NPS Run Plan Page for 2023-2024: Added mc-single-arm generated expected optics target rates)
Line 4: Line 4:
 
**CEBAF energies: 6.397, 8.483, 10.558 GeV (Corrected for synchrotron losses in arcs)
 
**CEBAF energies: 6.397, 8.483, 10.558 GeV (Corrected for synchrotron losses in arcs)
 
***[[Media:DVCS-kin-NPS-2023_v0.xlsx]]
 
***[[Media:DVCS-kin-NPS-2023_v0.xlsx]]
***mc-single-arm generated expected rates and sieve hole expectations for each setting:  
+
***mc-single-arm generated expected rates and sieve hole expectations for each setting: [[Media:NPS_HMS_InelasticRates_MC.xlsx]]
 +
 
 
**Alternate scenario, CEBAF energies: 6.281, 8.330, 10.368 GeV (Corrected for synchrotron losses in arcs)
 
**Alternate scenario, CEBAF energies: 6.281, 8.330, 10.368 GeV (Corrected for synchrotron losses in arcs)
 
***[[Media:DVCS-kin-NPS-2023_v1.xlsx]]
 
***[[Media:DVCS-kin-NPS-2023_v1.xlsx]]

Revision as of 13:29, 12 July 2023

NPS Run Plan Page for 2023-2024