− | ==== 12 GeV Drift Chambers ==== | + | ==== 12 GeV Drift Chambers ==== |
− | + | -DC1 and DC2 Wire maps at operational high voltages shows the presence of hot wires (adjacent wires to the hot wires are also affected). Some channels are also missing in both chambers. | |
− | + | -Efficiency studies shows how the efficiency improves with increasing high voltages. | |
+ | -Chambers DC1 ,DC2 are currently being conditioned by running them at 'normal' high voltage to try to get rid off (burn) any impurities that might be inside the chambers | ||
+ | -So far, chamber conditioning has not resolve the issues of hot wires being present, so they will need to be opened as soon as possible. | ||
==== Hodoscopes ==== | ==== Hodoscopes ==== |
Revision as of 10:12, 21 September 2017
Meeting Information
- Location CC L210A, 11 am
- DocDB
Blue Jeans Connection Information
- https://bluejeans.com/895800575
- Just want to dial in on your phone?
- +1.408.740.7256 (US)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- http://bluejeans.com/numbers
- Enter Meeting ID: 895800575
- Press #
Agenda
- Commissioning plan updates from detector systems
- Status update from detector owners, calibrations, efficiencies, etc.
- Update on new HMS wire chambers — B. Pandey
- HV issue with GEM L. Kabir
- Review systems owners and update information
- Address system specific points of interest for the Fall 2017 run
Minutes
General
Dave Gaskell commented: The SHMS Heavy Gas CHerenkov did not behave as expected during KPP, so there exists the possibility of replacing it with a Gas Cherenkov that was used previously.
Miscellaneous
Beam Line
Trigger/DAQ
The HMS/SHMS 6 trigger input on the TI has been configured to include multiple pre-triggers simultaneously.
HMS
6 GeV Drift Chambers
12 GeV Drift Chambers
-DC1 and DC2 Wire maps at operational high voltages shows the presence of hot wires (adjacent wires to the hot wires are also affected). Some channels are also missing in both chambers. -Efficiency studies shows how the efficiency improves with increasing high voltages. -Chambers DC1 ,DC2 are currently being conditioned by running them at 'normal' high voltage to try to get rid off (burn) any impurities that might be inside the chambers -So far, chamber conditioning has not resolve the issues of hot wires being present, so they will need to be opened as soon as possible.
Hodoscopes
Aerogel
Heavy Gas Cherenkov
Shower
SHMS
GEM
There is a High Voltage issue with the GEM. There are current trips at high voltages. See Link. *https://hallcweb.jlab.org/DocDB/0008/000894/001/GEM_HV_issue.pdf