Difference between revisions of "Testing SHMS Preshower"
From HallCWiki
Jump to navigationJump to search (New page: Category:SHMSinfo == Status == * The preshower has been cabled with signal and HV. * Have checked setting each channel to 1400V that signal is seen. == Computer Setup == * Computer is ...) |
|||
Line 7: | Line 7: | ||
== HV Setup == | == HV Setup == | ||
* Can control the CAEN 403 through terminal on ''hallcn5''. | * Can control the CAEN 403 through terminal on ''hallcn5''. | ||
+ | [https://hallcweb.jlab.org/wiki/images/9/9c/Pre_Shower_Cabeling.pdf pdf file ] |
Revision as of 12:44, 29 May 2012
Status
- The preshower has been cabled with signal and HV.
- Have checked setting each channel to 1400V that signal is seen.
Computer Setup
- Computer is called hallcn5. The account is cdaq.
HV Setup
- Can control the CAEN 403 through terminal on hallcn5.