Difference between revisions of "Target Field and Kepco Info"
From HallCWiki
Jump to navigationJump to searchLine 26: | Line 26: | ||
|0.0 | |0.0 | ||
|7.280 | |7.280 | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 31: | Line 32: | ||
|7.406 | |7.406 | ||
|-0.25 | |-0.25 | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 36: | Line 38: | ||
|-7.350 | |-7.350 | ||
|0 | |0 | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 41: | Line 44: | ||
|-7.364 | |-7.364 | ||
|-0.237 | |-0.237 | ||
+ | | | ||
| | | | ||
|} | |} |
Revision as of 07:40, 10 June 2020
This page is dedicated to all things Target Field related
Log Entries
- Nov. 26th Kepcos replaced Agilents https://logbooks.jlab.org/entry/3744320
- Dec. 26th V_in vs Current Calibration for two Kepcos in voltage control mode https://logbooks.jlab.org/entry/3747508
- Jan. 4th Swapped out Kepco with another Kepco because it was not stable https://logbooks.jlab.org/entry/3758511
- Jan. 15th Swapped out Kepco with another Kepco because it was running hot and tripping https://logbooks.jlab.org/entry/3764365
- Feb. 9th Field sweep program updated for Agilent https://logbooks.jlab.org/entry/3780264
- Feb. 10th Replaced Kepco with Agilent. Rearranged rack for better cooling https://logbooks.jlab.org/entry/3781492
- Feb. 14th Replaced Agilent with new Kepco. In constant current mode the inductive load option interfered with NMR https://logbooks.jlab.org/entry/3783977
- March 18th In constant voltage mode, coils need time to warm up https://logbooks.jlab.org/entry/3805990
- March 22nd New Kepco had odd behavior in voltage mode. Transverse NMR was not working. Left in current mode. https://logbooks.jlab.org/entry/3807357
- March 22nd Odd behavior explained from above. Noticed possible grounding issues. https://logbooks.jlab.org/entry/3807894
- March 24th Trouble getting transverse NMR signal. Bad Cable? https://logbooks.jlab.org/entry/3809148
Coil Currents for D2n
SHMS 11 degrees
Field Direction | Helm. Lg. | Helm. Sm. | Vert. Lg. | Vert. Sm. |
---|---|---|---|---|
0 | 0.0 | 7.280 | ||
90 | 7.406 | |||
180 | ||||
0 | ||||
270 | ||||
SHMS 11 degrees
Field Direction | Helm. Lg. | Helm. Sm. | Vert. Lg. | Vert. Sm. |
---|---|---|---|---|
0 | ||||
90 | ||||
180 | ||||
270 |
Labview Program Guide
Field Measurements
- A1n Vertical Field Measurement (March 13th, 2019)
https://logbooks.jlab.org/entry/3804362
Plan for returning from COVID shutdown
- Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
- Measure resistance to ground for both coils
- Install latest new power supply, add additional circuitry
- Test power supplies in both current and voltage control mode
- Look at PS output on scope, with and without RF on.
- Test NMR in both voltage and current mode
- Ensure Labview is ready to go for either configuration