==Plan for returning from COVID shutdown==
 
==Plan for returning from COVID shutdown==
* Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
+
* Work that can begin immediately (June 10th, 2020)
* Measure resistance to ground for both coils
+
** Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
* Install latest new power supply, add additional circuitry
+
** Measure resistance to ground for both coils
* Test power supplies in both current and voltage control mode
+
** Install latest new power supply, add additional circuitry
* Look at PS output on scope, with and without RF on.
+
** Test power supplies in both current and voltage control mode
* Test NMR in both voltage and current mode
+
** Look at PS output on scope, with and without RF on.
* Ensure Labview is ready to go for either configuration
+
** Ensure Labview is ready to go for either configuration
 +
 
 +
*After the cell is polarized
 +
** Test NMR in both voltage and current mode
  
 
==Manuals/Documentation==
 
==Manuals/Documentation==
 
* [[Media:KEPCO.pdf|Note on KEPCO power supplies]]
 
* [[Media:KEPCO.pdf|Note on KEPCO power supplies]]

Revision as of 07:45, 10 June 2020

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

SHMS 11 degrees

Field Direction Helm. Lg. Helm. Sm. Vert. Lg. Vert. Sm.
0 0.0 7.280
90 7.406 -0.25
180 -7.350 0
270 -7.364 -0.237

SHMS 11 degrees

Field Direction Helm. Lg. Helm. Sm. Vert. Lg. Vert. Sm.
0
90
180
270

Labview Program Guide

Field Measurements

  • A1n Vertical Field Measurement (March 13th, 2019)

https://logbooks.jlab.org/entry/3804362

Plan for returning from COVID shutdown

  • Work that can begin immediately (June 10th, 2020)
    • Follow manufacturers "Check out" procedure for new power supply which was delivered during shutdown
    • Measure resistance to ground for both coils
    • Install latest new power supply, add additional circuitry
    • Test power supplies in both current and voltage control mode
    • Look at PS output on scope, with and without RF on.
    • Ensure Labview is ready to go for either configuration
  • After the cell is polarized
    • Test NMR in both voltage and current mode

Manuals/Documentation