Difference between revisions of "RC Update and Run Plan for Aug 13, 2020"

From HallCWiki
Jump to: navigation, search
(RC Meeting Information)
(RC Meeting Information)
Line 4: Line 4:
 
<b> Wednesday Aug 13 2020. </b>
 
<b> Wednesday Aug 13 2020. </b>
  
 +
 +
= Current Run Plan =
 +
 +
<b> Normal Production running </b>
 +
 +
*<b>Prerequisites</b>
 +
 +
<ul> 
 +
 +
*Make sure [http://opsweb.acc.jlab.org/internal/ops/ops_webpage/restrictions/ops_restrictions.html operational restrictions] are followed.
 +
 +
*Make sure the raster size is correct (4-4.5)
 +
 +
*Monitor beam parameters/configuration very often and post an entry like [https://logbooks.jlab.org/entry/3777457 this] at the beginning of your shift and when run conditions have changed
 +
 +
*Running on cell targets: raster always ON (4-4.5, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
 +
 +
*Always take 120Hz of EDTM
 +
 +
*Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
 +
 +
* Change the IHWP every 4 hours when running on glass cells
 +
 +
</ul>
 +
 +
*<b>Run plan</b>
 +
 +
<ul>
 +
*Start back with the Beam / Raster checkout (short procedure) [https://hallcweb.jlab.org/wiki/index.php/Beam_and_Raster_Checkout_for_A1n/d2n_(Short_Procedure) Checkout]
 +
 +
* Production on 3He; if not able to reach requested current, pro-rate the ABUs
 +
 +
</ul>
 +
 +
=== Notes for tomorrow's 7:45 meeting ===
 +
 +
 +
==== Future ====
 +
 +
* Opportunistic target polarization calibration and studies on Tuesday-Wednesday during beam off and Moller measurement (priority is beam)??
 +
* We are on the schedule to switch to 1st pass on Monday/Tuesday (17AUG / 18AUG). Need about ~ 3 days at 1st pass and would like to switch back to 5th pass before the weekend.
 +
* EPR diode good for now, but check for future planned accesses.
 +
* If Hall will have opening for 1+ hours, let Simona know as there is work to do on the cerenkov.
 +
 +
==== Hall Access ====
 +
 +
== When there is a down:==
  
 
=General updates=
 
=General updates=

Revision as of 12:12, 13 August 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, remote

Wednesday Aug 13 2020.


Current Run Plan

Normal Production running

  • Prerequisites
    • Make sure the raster size is correct (4-4.5)
    • Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
    • Running on cell targets: raster always ON (4-4.5, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
    • Always take 120Hz of EDTM
    • Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
    • Change the IHWP every 4 hours when running on glass cells
  • Run plan
    • Start back with the Beam / Raster checkout (short procedure) Checkout
    • Production on 3He; if not able to reach requested current, pro-rate the ABUs

Notes for tomorrow's 7:45 meeting

Future

  • Opportunistic target polarization calibration and studies on Tuesday-Wednesday during beam off and Moller measurement (priority is beam)??
  • We are on the schedule to switch to 1st pass on Monday/Tuesday (17AUG / 18AUG). Need about ~ 3 days at 1st pass and would like to switch back to 5th pass before the weekend.
  • EPR diode good for now, but check for future planned accesses.
  • If Hall will have opening for 1+ hours, let Simona know as there is work to do on the cerenkov.

Hall Access

When there is a down:

General updates

Pending problem

  • Beam trip rate

Recent polarization measurements