*Spectral waveform peak oscillation noted during owl shift [https://logbooks.jlab.org/entry/3826153 oscillation]
 +
*Ethan found one of the drive what locked up and was continuously turning [https://logbooks.jlab.org/entry/3826594 QWP_driver]
 +
*Mingyu check the pulse NMR during an access [https://logbooks.jlab.org/entry/3826516 Pulse_NMR]
 +
* I found the power strip the camera/light was turned off. Turned on and can view the target [[https://logbooks.jlab.org/entry/3826483]]
  
 
*The HMS was to 13.50. There were some issues with the Drive Controllers. They needed to be reset by Joe in the Hall  
 
*The HMS was to 13.50. There were some issues with the Drive Controllers. They needed to be reset by Joe in the Hall  
 
[https://logbooks.jlab.org/entry/3826555 Drive_Controllers]
 
[https://logbooks.jlab.org/entry/3826555 Drive_Controllers]
 +
[https://logbooks.jlab.org/entry/3826615 HMS angle]
 +
*HMS momentum was set to -4.2 Gev/c
 +
https://logbooks.jlab.org/entry/3826528
  
[https://logbooks.jlab.org/entry/3826615 HMS angle]
 
  
 
*Reference cell was pumped with Hydrogen [[https://logbooks.jlab.org/entry/3826687 reference_cell]]
 
*Reference cell was pumped with Hydrogen [[https://logbooks.jlab.org/entry/3826687 reference_cell]]

Revision as of 16:11, 13 August 2020

RC Meeting Information

RC Daily Meetings are at 4:15 PM, remote

Wednesday Aug 13 2020.


General updates

  • Spectral waveform peak oscillation noted during owl shift oscillation
  • Ethan found one of the drive what locked up and was continuously turning QWP_driver
  • Mingyu check the pulse NMR during an access Pulse_NMR
  • I found the power strip the camera/light was turned off. Turned on and can view the target [[1]]
  • The HMS was to 13.50. There were some issues with the Drive Controllers. They needed to be reset by Joe in the Hall

Drive_Controllers HMS angle

  • HMS momentum was set to -4.2 Gev/c

https://logbooks.jlab.org/entry/3826528


Pending problem

  • Beam trip rate

Recent polarization measurements

Current Run Plan

Normal Production running

  • Prerequisites
    • Make sure the raster size is correct (4-4.5)
    • Monitor beam parameters/configuration very often and post an entry like this at the beginning of your shift and when run conditions have changed
    • Running on cell targets: raster always ON (4-4.5, size will be determined by the scraping checks), orbit locks ON, current ramp rate 1 muA/sec
    • Always take 120Hz of EDTM
    • Fill the BTA with realistic numbers. If the desired beam current is not delivered prorate your ABUs!
    • Change the IHWP every 4 hours when running on glass cells
  • Run plan
    • Since we have been down since 9 am, we likely want to start back with the Beam / Raster checkout (short procedure)
    Checkout
    • Production on 3He; if not able to reach requested current, pro-rate the ABUs

Notes for tomorrow's 7:45 meeting

Future

  • We are on the schedule to switch to 1st pass on the week of Aug 24 (Monday/ Tuesday). Need about ~ 3 days at 1st pass and would like to switch back to 5th pass before the weekend.
  • EPR diode good for now, but check for future planned accesses.
  • If Hall will have opening for 1+ hours, let Simona know as there is work to do on the cerenkov.

Hall Access

When there is a down: