(Created page with "* Switch overed from CaFe to XEM2 experiments. * SHMS/HMS trigger setups were checked/modified according to the XEM2 experiment trigger requirements https://logbooks.jlab.org/...")
 
Line 1: Line 1:
 +
General Update:
 +
 
* Switch overed from CaFe to XEM2 experiments.
 
* Switch overed from CaFe to XEM2 experiments.
 
* SHMS/HMS trigger setups were checked/modified according to the XEM2 experiment trigger requirements https://logbooks.jlab.org/entry/4048532, https://logbooks.jlab.org/entry/4048593
 
* SHMS/HMS trigger setups were checked/modified according to the XEM2 experiment trigger requirements https://logbooks.jlab.org/entry/4048532, https://logbooks.jlab.org/entry/4048593
 
* Data file locations were modified for the XEM2 experiments as well https://logbooks.jlab.org/entry/4048556.
 
* Data file locations were modified for the XEM2 experiments as well https://logbooks.jlab.org/entry/4048556.
* HMS Q1, Q2 interlocks twice while ramping up to the MOL. Was able to set the magnets up by increasing the current in increments.
 
* Problem with the HMS rotation to 19.52 deg. Engineer on call came in to reset the drive controller. Worked at the second attempt.
 
 
* Beam was restored to the Hall C around 22:45. We did a quick harp scan and beam centering check with the Al hole target while we had beam briefly https://logbooks.jlab.org/entry/4048797 https://logbooks.jlab.org/entry/4048844
 
* Beam was restored to the Hall C around 22:45. We did a quick harp scan and beam centering check with the Al hole target while we had beam briefly https://logbooks.jlab.org/entry/4048797 https://logbooks.jlab.org/entry/4048844
 
* Beam was interrupted due to the 1L12 trip and all RF in the North Linac. This was followed by the RSEP8A magnet over temperature fault. DC power is looking into it.
 
* Beam was interrupted due to the 1L12 trip and all RF in the North Linac. This was followed by the RSEP8A magnet over temperature fault. DC power is looking into it.
* HMS Q3 and Dipole interlocks during the early owl shift - reset worked. https://logbooks.jlab.org/entry/4048848
 
  
 
Problems resolved:
 
Problems resolved:
  
 +
* HMS Q1, Q2 interlocks twice while ramping up to the MOL. Was able to set the magnets up by increasing the current in increments.
 +
* Problem with the HMS rotation to 19.52 deg. Engineer on call came in to reset the drive controller. Worked at the second attempt.
 +
* HMS Q3 and Dipole interlocks during the early owl shift - reset worked. https://logbooks.jlab.org/entry/4048848
 
* Due to the older hcana version on our go_analysis, we were not seeing any events on the fast raster plots. Casey switched to the newer firmware version - problem is fixed.  
 
* Due to the older hcana version on our go_analysis, we were not seeing any events on the fast raster plots. Casey switched to the newer firmware version - problem is fixed.  
 
Mark also confirmed that with the new FADC firmware, we need to use the latest HCANA.
 
Mark also confirmed that with the new FADC firmware, we need to use the latest HCANA.

Revision as of 10:20, 30 September 2022

General Update:

Problems resolved:

  • HMS Q1, Q2 interlocks twice while ramping up to the MOL. Was able to set the magnets up by increasing the current in increments.
  • Problem with the HMS rotation to 19.52 deg. Engineer on call came in to reset the drive controller. Worked at the second attempt.
  • HMS Q3 and Dipole interlocks during the early owl shift - reset worked. https://logbooks.jlab.org/entry/4048848
  • Due to the older hcana version on our go_analysis, we were not seeing any events on the fast raster plots. Casey switched to the newer firmware version - problem is fixed.

Mark also confirmed that with the new FADC firmware, we need to use the latest HCANA.

Things need to be fixed: