Difference between revisions of "December 2, 2022"

From HallCWiki
Jump to navigationJump to search
(Created page with "= RC Meeting Information = * [https://hallcweb.jlab.org/wiki/index.php/RC_daily_meetings_fall_2022 Return to RC meeting main page] <b> RC Daily Meetings are at 11:00 (am) via...")
 
Line 30: Line 30:
 
= Current Status =
 
= Current Status =
 
* In Controlled Access
 
* In Controlled Access
 +
*Dave Meekins finished the target cool down yesterday. There are issues with cryo that need to be worked out before we can run beam on the He3 and He4 targets.
 +
*Vacuum issue downstream of the target. The vacuum, beyond valve VBV3H08A is poor (7e-4) when the valve is opened. Walter, Dave Meekins, and Dave Gaskell are currently in the hall understand what is the source of the bad vacuum..........
  
 
= Run Plan =
 
= Run Plan =

Revision as of 10:47, 2 December 2022

RC Meeting Information

RC Daily Meetings are at 11:00 (am) via Zoom and in person in the counting house meeting room (2nd floor)

  • Zoom remote connection information:
 Join ZoomGov Meeting
 https://jlab-org.zoomgov.com/j/1607100885?pwd=ZFBsRTFsYm5Zb0laZ0tyZXNjcEE0QT09
 Meeting ID: 160 710 0885
 Passcode: 595071
 One tap mobile
 +16692545252,,1607100885# US (San Jose)
 +16468287666,,1607100885# US (New York)
 Dial by your location
       +1 669 254 5252 US (San Jose)
       +1 646 828 7666 US (New York)
       +1 669 216 1590 US (San Jose)
       +1 551 285 1373 US
       833 568 8864 US Toll-free
 Meeting ID: 160 710 0885
 Find your local number: https://jlab-org.zoomgov.com/u/ab2CekLXgQ

Useful Links

Current Status

  • In Controlled Access
  • Dave Meekins finished the target cool down yesterday. There are issues with cryo that need to be worked out before we can run beam on the He3 and He4 targets.
  • Vacuum issue downstream of the target. The vacuum, beyond valve VBV3H08A is poor (7e-4) when the valve is opened. Walter, Dave Meekins, and Dave Gaskell are currently in the hall understand what is the source of the bad vacuum..........

Run Plan

  • Move SHMS to 8.00 degrees
  • SHMS momentum to -9.2 GeV
  • Move HMS to 20.00 degree
  • HMS momentum to +3.40 GeV (Positron running)
  • Beam and Target Checkout procedure: https://hallcweb.jlab.org/wiki/index.php/Beam_Checkout_Procedures
  • Beam checkout
    • Turn on all hodoscope and preshower HV
    • Harp scans --- 5 uA beam, Empty target
  • Position checkout
    • 5-10 uA cw with AL hole
    • 2x2 raster

Notes

  • SHMS rotation to 8 deg: Rotating SHMS below 8 deg will trip the limit switch. Start with putting 8.1 or 8.2 deg on the rotation GUI to see the angle offset first then correct for it.
  • HMS rotation to 20 deg: There is an increased chance that the rotation will get "stuck" and require expert intervention.
    • When rotating to 20 degrees from smaller HMS angle, it is ok to go directly to 20 degrees.
    • When rotating to 20 degrees from larger angle, first rotate to 19 degrees, and then to 20 degrees.
  • SHMS DAQ work during the Christmas break by Bob Michaels?


To do

  • Begin production data on target ladder 2