Difference between revisions of "Sep 25 2024"

From HallCWiki
Jump to navigationJump to search
Line 7: Line 7:
 
# Basic DAQ is good to run
 
# Basic DAQ is good to run
 
# Bill completed the gate and reference time connections for SHMS DC (https://logbooks.jlab.org/entry/4317022)
 
# Bill completed the gate and reference time connections for SHMS DC (https://logbooks.jlab.org/entry/4317022)
#
+
# Took HMS cosmic runs with adjust trigger time (https://logbooks.jlab.org/entry/4317449): hodoscope and calorimeter good hits look different from previous runs
 +
# Added Aerogel to HV GUI
 +
To do
 +
# Add ET to CODA configuration
 +
# Saturate the DAQ using a high rate pulser to see the maximum data rate
 +
# Would need more than one ERs to achieve higher maximum data rate.

Revision as of 14:26, 25 September 2024

Back to Main Page >> Weekly meetings

Agenda

Notes

  1. SHMS hcvme04, hcvme06 are ready and upgraded to CODA 3
  2. Basic DAQ is good to run
  3. Bill completed the gate and reference time connections for SHMS DC (https://logbooks.jlab.org/entry/4317022)
  4. Took HMS cosmic runs with adjust trigger time (https://logbooks.jlab.org/entry/4317449): hodoscope and calorimeter good hits look different from previous runs
  5. Added Aerogel to HV GUI

To do

  1. Add ET to CODA configuration
  2. Saturate the DAQ using a high rate pulser to see the maximum data rate
  3. Would need more than one ERs to achieve higher maximum data rate.