Sep 25 2024

From HallCWiki
Jump to navigationJump to search

Back to Main Page >> Weekly meetings

Agenda

Notes

  1. SHMS hcvme04, hcvme06 are ready and upgraded to CODA 3
  2. Basic DAQ is good to run
  3. Bill completed the gate and reference time connections for SHMS DC (https://logbooks.jlab.org/entry/4317022)
  4. Took HMS cosmic runs with adjust trigger time (https://logbooks.jlab.org/entry/4317449): hodoscope and calorimeter good hits look different from previous runs
  5. Added Aerogel to HV GUI

To do

  1. Add ET to CODA configuration
  2. Saturate the DAQ using a high rate pulser to see the maximum data rate
  3. Would need more than one ERs to achieve higher maximum data rate.
  4. Bill will keep working on the triggers with cosmic