Line 26: Line 26:
 
**[https://hallcweb.jlab.org/wiki/images/6/64/B-versus-I-pos-and-neg-HB.pdf plot ] of relative difference between B when ramping magnet up and down versus I when going to +3900 and -3900.
 
**[https://hallcweb.jlab.org/wiki/images/6/64/B-versus-I-pos-and-neg-HB.pdf plot ] of relative difference between B when ramping magnet up and down versus I when going to +3900 and -3900.
 
**[https://hallcweb.jlab.org/wiki/images/f/f2/Up-versus-down-HB.pdf Plot] of difference in B between ramping up to +3900 and ramping up to -3900 versus current.
 
**[https://hallcweb.jlab.org/wiki/images/f/f2/Up-versus-down-HB.pdf Plot] of difference in B between ramping up to +3900 and ramping up to -3900 versus current.
**When ramping to negative currents there was a trip at I= -3139A. [https://hallcweb.jlab.org/wiki/images/1/1c/Neg-compare-ramps-HB.pdf Plot] of difference between first
+
**When ramping to negative currents there was a trip at I= -3139A. [https://hallcweb.jlab.org/wiki/images/1/1c/Neg-compare-ramps-HB.pdf Plot] of difference between first ramp to -3139A and the second.
ramp to -3139A and the second.
 
 
*[https://hallcweb.jlab.org/wiki/images/e/e0/HB_Field_Mapping-V3.pdf Document and plots] about mapping Of B versus z locations for I = 2000, 3000, 3500 and 3900A.
 
*[https://hallcweb.jlab.org/wiki/images/e/e0/HB_Field_Mapping-V3.pdf Document and plots] about mapping Of B versus z locations for I = 2000, 3000, 3500 and 3900A.
  

Revision as of 18:35, 9 March 2016

Weekly Meetings

  • Meetings will be held on Thursdays 11:30-12:30 in F228.
  • Next meeting March 10th.
  • Join by Bluejeans by phone and computer +1.888.240.2560 (US Toll Free) Enter Meeting ID: 653182486

Preparation plans

  • Magnets.
    • Determination of B versus I curve. Develop new code for setting SHMS. Revise HMS field setting codes.
    • Cycling procedure especially for HB. Look what is done for the HMS.
    • Double check that the magnet field between magnets are superpositions.
    • Survey of the positioning of magnets.
  • Check if it is possible to do carbon elastics at 2 pass. Dipangkar will look into this. (Results for 1 pass- 2.2 GeV, and 2 pass -4.4 GeV)
  • Survey of collimators, detectors and beamline components.
  • Survey of HMS/SHMS pointing at different angles. Look into what was done in the past for HMS commissioning. Determine a list of angles for survey.
  • Need to come up with the sieve pattern as a function of quad settings.
  • Need to look at use of ideal dipole versus TOSCA field map for HB in COSY.
  • Check with Howard about checking the quad field centering.
  • Integration of detector checkout and optics.

SHMS HB mapping

  • Document and plots about mapping of B versus I at center of HB bore and the fringe fields in the beam region.
  • Measurements of B at bore center versus I when ramping magnet from 0 to +3900 and back to 0. Then switch polarity and ramp from 0 to -3900 and back to zero.
    • plot of absolute difference between B when ramping magnet up and down versus I when going to +3900 and -3900.
    • plot of relative difference between B when ramping magnet up and down versus I when going to +3900 and -3900.
    • Plot of difference in B between ramping up to +3900 and ramping up to -3900 versus current.
    • When ramping to negative currents there was a trip at I= -3139A. Plot of difference between first ramp to -3139A and the second.
  • Document and plots about mapping Of B versus z locations for I = 2000, 3000, 3500 and 3900A.

SLITS and COLLIMATORS

SHMS Detector Positions

SHMS Characteristics

SHMS Drawings of magnets

Study of the SHMS resolution

  • Study of the SHMS resolution.

Old HMS information

SNAKE

Moved Snake section here.