Difference between revisions of "Main Page"

From HallCWiki
Jump to: navigation, search
(Spring 2017 Commissioning Plans)
(Reorganized a bit)
Line 56: Line 56:
 
*[[SHMS Noble Gas Cerenkov | Noble Gas Cherenkov]]
 
*[[SHMS Noble Gas Cerenkov | Noble Gas Cherenkov]]
  
== Monte Carlo ==
+
== DAQ ==
 +
* [[DAQ]]
 +
* [[Scalers]]
  
[[Monte Carlo]]
+
== Controls ==
  
== Data Analysis ==
+
* [[High Voltage]]
*[[:Category:12GeV Software|Analyzer and other Hall C related software]]
+
* Spectrometer Controls (Use go_cmagnets command)
*[[hallc_optics_optim | Documentation ]] on the Hall C optics optimization
+
  
 
== Online Replay ==
 
== Online Replay ==
Line 68: Line 69:
 
* Brief overview of the [[ Hall_C_basic_replay_structure | basic Hall C replay structure ]].
 
* Brief overview of the [[ Hall_C_basic_replay_structure | basic Hall C replay structure ]].
  
== Data Acquisition ==
+
== Data Analysis ==
 +
*[[:Category:12GeV Software|Analyzer and other Hall C related software]]
 +
*[[hallc_optics_optim | Documentation ]] on the Hall C optics optimization
  
The Hall C data acquisition digitizes data from the drift chambers, hodoscopes, Cerenkov detectors and lead glass shower counters that are located in the HMS and SOS shield huts.  This digitization is done with Lecroy fastbus modules located in 4 crates.
+
== Monte Carlo ==
  
The ~2000 channels of drift chamber signals are discriminated and the times of hits on wires are recorded in fastbus crates located in each of the spectrometer huts.  These times are digitized with Lecroy 1877 multihit TDC's with a resolution of 0.5ns.
+
* [[SIMC Monte Carlo|SIMC]]
 
+
Notes on the [[DAQ]].
+
 
+
== Controls ==
+
  
 
= Hall C at 12 GeV =
 
= Hall C at 12 GeV =

Revision as of 14:48, 28 February 2017

Hallcheader.jpg


Hall C Links

Hall C

Hall C is one of four experimental halls at JLab.

Hall C Computing.

Hall C in the Press.

Basic Equipment in Hall C

Beamline

  • Guidance for decision on masking the FSD. Decision will be be made by the Hall Leader Steve Wood or, in his absence, Greg Smith.

HMS Detectors

SHMS Detectors

DAQ

Controls

  • High Voltage
  • Spectrometer Controls (Use go_cmagnets command)

Online Replay

Data Analysis

Monte Carlo

Hall C at 12 GeV

Spring 2017 Commissioning Plans